6.3 Detention Results
The Opal Lane Units detention tanks are proposed to discharge to Opal Lane via two 100mm diameter kerb
adapters; with total peak discharge rates to Opal Lane estimated at 37L/s for a 1% AEP 10 min critical storm
which is an increase on the current discharge to Opal Lane of 21L/s, with the increase attributed to the
redirection of surface flows currently discharging across the western boundary.
As there is no piped infrastructure within Opal Lane it is impractical to detain the surface flows, and the
redirection of flows into a Council controlled discharge point is considered an improvement on the current
drainage scenario and is considered a preferable outcome. All flows (pre-developed and developed) enter the
same existing stormwater infrastructure to the west of the site, as the total site discharge is maintained there
can be no worsening to the performance of the existing infrastructure.
The Ruby Street Units detention tank is proposed to discharge to the field inlet in Ruby Street via a 150mm
diameter pipe; with total peak discharge rates to Ruby Street estimated at 37L/s for a 1% AEP 10 min critical
storm which is an improvement on the current discharge to Ruby Street of 59L/s.
WBNM WHOLE OF SITE DETENTION SUMMARY
Pre-Development Post-Development
AEP Duration Duration Performance
Q (m3/s) Q (m3/s)
(min) (min)
63.20% 0.021 15 0.013 15 62%
39.35% 0.029 15 0.027 15 93%
18.14% 0.039 15 0.039 15 100%
10% 0.049 10 0.046 15 94%
5% 0.06 10 0.052 15 87%
2% 0.067 10 0.064 10 96%
1% 0.074 10 0.074 10 100%
Table 7: Comparison of pre and post development site discharge rates
As demonstrated in Table 7, the proposed detention system successfully mitigates stormwater discharge for
the proposed development to pre-development discharge rates.
The proposed development improves on existing stormwater discharge arrangement by redirecting surface
flows currently discharging across the western boundary into Council controlled infrastructure.
As the proposed development maintains current peak discharge rates, it is not considered to affect the
existing capacity of the downstream infrastructure.
7. FLOODING
The site is in an elevated position locally and regionally and is not known to have any flood risk. A review of
the Noosa Shire Council’s Intramaps Interactive Mapping (accessed 23/04/2022) indicates that the site is not
affected by any known flood studies. Refer Plate 2 for an excerpt of the mapping system.
Ingeniir Pty Ltd | 215101-SMP-01
ABN: 99 642 485 363 | PO Box 988 Maroochydore QLD 4558 | [email protected] | 0404157187
Page 9 | 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Appendix D- Stormwater Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.