Council archive · source document
MCU11/0053 plans
Plans and drawings: the text below has words only, no drawings.
Neighbouring Two
Storey House 18
304 Legend for Drawings
A B C D E F G H I J 61 Seaview Terrace
Awn Sun awning with metal brackets- refer to detail. B
9,900 Bal# Balustrade / Handrail Number - Refer Schedule of Materials & Finishes.
SMH Refer WD.101 BHD Bulkhead.
North Boundary 94°20'40" 35.204
90
CLG Ceiling - Refer Reflected Ceiling Plan.
SMH
.3
CP/FL Capping/Flashing.
38.0
35.0
5
30
5
0
5
.0
.0
.5
2,000
2,000
.5
5
37.
0
36.
36.
35.
1
37
34
34
31.
CPV Concrete Pavers - Refer Schedule of Materials & Finishes.
32.
32
1.5m setback
RL
CO Colorbond custom orb metal sheeting installed as per maufacturer's specifications.
+
2.0° Fall
2
4
.2
Line of wall below CS Concrete cast stair - Refer Schedule of Materials & Finishes.
30
.5
CT Cooktop. Refer to Appliance Schedule.
Seaview Terrace
33
RL
.0
2.0°
Fall
2.0°
Fall
D.#.## Door Number. Refer Door Schedule.
33
+
0
4
Line of wall below
Line of wall below
31.
2.0°
DP Downpipe - Refer Schedule of Materials & Finishes.
.1
Fall
30
DR Clothes dryer. Refer to Appliance Schedule.
Existing Pandanas
RL
DW Dishwasher. Refer to Appliance Schedule.
tree to be relocated on
+
1
184°20'40" 15.289
EA Exposed Aggregate Concrete Slab
5" 15.48
site, T.B.A.
EAP Exposed Aggregate Concrete Pavers
Line of wall below
tback
3 Ex.VJ External vertical joint cladding - Refer Schedule of Materials & Finishes.
6,000 OMP
2.0° FC Fibre cement lining - Refer Schedule of Materials & Finishes.
5
6.0m setback
1.5m se
4
30.
355°19'1
5.0°
Fall
FG Fixed glass- refer to Window Schedule.
Line of wall below
Fall
5 FLJ Floor Joist - Refer to Structural Engineer's specifications.
FWG Floor Waste Gully
Existing retaining to be demolished,
G Colorbond half-round Gutter unless otherwise shown on drawings
5.0°
Fall
pool below
Refer external works plan.
Legend for Drawings G1 Gutter, Refer to detail and Schedule of Materials & Finishes.
Line of
oundary
East Boundary
Water tanks GD Drain with SS grate - Refer Schedule of Materials & Finishes.
Awn Sun awning with metal brackets- refer to detail.
location HWU Hot water unit - Refer Schedule of Materials & Finishes.
Line of wall below PP 6
1,500 Bal# Balustrade / Handrail Number - Refer Schedule of Materials & Finishes. INS Insulation - Refer Schedule of Materials & Finishes.
West B
BHD Bulkhead. JF.## Cabinetwork Item
3,076 1.5m setback T.M.B.
1,589
CLG Green Roof Ceiling - Refer Reflected Ceiling Plan. M Shower mixer - Refer Schedule of Materials & Finishes.
CP/FL Capping/Flashing. 7 Nail in kerb
NGL Natural Ground Level
South Boundary 274°20'40" 32.776 CPV Concrete Pavers - Refer Schedule of Materials & Finishes. OFCRL 29.51Off Form Concrete, class 2 nom. setout - Refer Schedule of Materials & Finishes.
CO ColorbondExisting garden
custom beds to
orb metal be demolished,
sheeting ORS
installed as per maufacturer's specifications. Open Riser stair - Refer Schedule of Materials & Finishes.
Existing retaining,
CS Concrete cast stair -Refer
Referexternal
Schedule works plan. & Finishes.
of Materials P Post/ column. Refer to Structural Engineer's specifications.
Refer external works plan. Line of existing
CT neighbouring buildingRefer to Appliance Schedule.
Cooktop. PB 10mm Plasterboard with paint finish
Sewer adjacent to rear boundary, D.#.## Door Number. Refer Re-locate
Door existing
Schedule. power pole, PCo. Polished Concrete Flooring - Refer Schedule of Materials & Finishes.
Location indicative, Neighbouring
DP Two Refer external
Downpipe - Refer Schedule works&plan.
of Materials Finishes. PU Purlin - Refer to Structural Engineer's specifications.
refer plumbing consultant Storey DRHouse Clothes dryer. Refer to Appliance Schedule. R Recess in tiled wall - refer to detail
DW Dishwasher. Refer to Appliance Schedule. RBW 200 series reinforced rendered external blockwork.
Location Plan
EA Exposed Aggregate Concrete Slab RBW1 200 series reinforced retaining blockwork.
1. Site Plan EAP Exposed Aggregate Concrete Pavers RCS Reinforced concrete slab on ground - See Structural Engineers Drawings.
Ex.VJ External vertical joint cladding - Refer Schedule of Materials & Finishes. RF Refrigerator - Refer Schedule of Materials & Finishes.
FC Fibre cement lining - Refer Schedule of Materials & Finishes. RH Rangehood - Refer Schedule of Materials & Finishes.
Scale 1:200 FG Fixed glass- refer to Window Schedule. RR Roof Rafter - See Structural Engineers Drawings.
FLJ Floor Joist - Refer to Structural Engineer's specifications. RS1 Roof Sheeting - Refer Schedule of Materials & Finishes.
FWG Floor Waste Gully RS2 Roof Sheeting - Refer Schedule of Materials & Finishes.
G Colorbond half-round Gutter unless otherwise shown on drawings S Sink - Refer Schedule of Materials & Finishes.
Legend for Drawings G1 Gutter, Refer to detail and Schedule of Materials & Finishes. SE 80 x 19 shot edge hardwood timber decking
GD Drain with SS grate - Refer Schedule of Materials & Finishes. SC Structural Column Concealed within wall - See Structural Engineers Drawings.
Awn Sun awning with metal brackets- refer to detail. HWU Hot water unit - Refer Schedule of Materials & Finishes. SCS Suspended Concrete Slab - See Structural Engineers Drawings.
Bal# Balustrade / Handrail Number - Refer Schedule of Materials & Finishes. INS Insulation - Refer Schedule of Materials & Finishes. SF Structural Footing - See Structural Engineers Drawings. Wall & Floor Legend
BHD Bulkhead. JF.## Cabinetwork Item SL Shiplap Cladding - Refer Schedule of Materials & Finishes.
CLG Ceiling - Refer Reflected Ceiling Plan. M Shower mixer - Refer Schedule of Materials & Finishes. SS Shower seat - Refer to detail. Stone Clad Block Wall
CP/FL Capping/Flashing. NGL Natural Ground Level T Solid Timber Treads - Refer Schedule of Materials & Finishes.
RC Block
CPV Concrete Pavers - Refer Schedule of Materials & Finishes. OFC Off Form Concrete, class 2 nom. setout - Refer Schedule of Materials & Finishes. T1 Ceramic tiles- 300 x 600.
CO Colorbond custom orb metal sheeting installed as per maufacturer's specifications. ORS Open Riser stair - Refer Schedule of Materials & Finishes. T2 Ceramic tiles, Ext. 300 x 600 Reinforced Concrete
CS Concrete cast stair - Refer Schedule of Materials & Finishes. P Post/ column. Refer to Structural Engineer's specifications. T&G Tongue & Groove Hardwood Flooring
CT Cooktop. Refer to Appliance Schedule. PB 10mm Plasterboard with paint finish TB Timber battens - Refer Schedule of Materials & Finishes. Timber Framed Wall
D.#.## Door Number. Refer Door Schedule. PCo. Polished Concrete Flooring - Refer Schedule of Materials & Finishes. TD Trimdek metal sheeting installed as per maufacturer's specifications. FFL 3.500 Finished Floor Level generally
DP Downpipe - Refer Schedule of Materials & Finishes. PU Purlin - Refer to Structural Engineer's specifications. TFC Trowel Finished Concrete - Refer to Scope of Works.
DR Clothes dryer. Refer to Appliance Schedule. R Recess in tiled wall - refer to detail TOW Top of Wall SFL 3.500 Structural Floor Level generally
DW Dishwasher. Refer to Appliance Schedule. RBW 200 series reinforced rendered external blockwork. TS Timber screen- refer to detail.
+SL 3.500 Spot Level
EA Exposed Aggregate Concrete Slab RBW1 200 series reinforced retaining blockwork. TS1 Timbet screen vertical- refer to detail
EAP Exposed Aggregate Concrete Pavers RCS Reinforced concrete slab on ground - See Structural Engineers Drawings. VB 6mm Villaboard, paint finish RL 3.500 Reduced Level
Ex.VJ External vertical joint cladding - Refer Schedule of Materials & Finishes. RF Refrigerator - Refer Schedule of Materials & Finishes. WB Weatherboard - Refer Schedule of Materials & Finishes.
FC Fibre cement lining - Refer Schedule of Materials & Finishes. RH Rangehood - Refer Schedule of Materials & Finishes. WC Toilet
FG Fixed glass- refer to Window Schedule. RR Roof Rafter - See Structural Engineers Drawings. WRPB Wet area plasterboard
FLJ Floor Joist - Refer to Structural Engineer's specifications. RS1 Roof Sheeting - Refer Schedule of Materials & Finishes. WOV Wall Oven
FWG Floor Waste Gully RS2 Roof Sheeting - Refer Schedule of Materials & Finishes. WPM Waterproof membrane, Refer to Structural Engineer's specifications.
G Colorbond half-round Gutter unless otherwise shown on drawings S Sink - Refer Schedule of Materials & Finishes. W.#.## Window Number. Refer Door and Window Schedule
G1 Gutter, Refer to detail and Schedule of Materials & Finishes. SE 80 x 19 shot edge hardwood timber decking
GD Drain with SS grate - Refer Schedule of Materials & Finishes. SC Structural Column Concealed within wall - See Structural Engineers Drawings.
HWU Hot water unit - Refer Schedule of Materials & Finishes. SCS Suspended Concrete Slab - See Structural Engineers Drawings.
INS Insulation - Refer Schedule of Materials & Finishes. SF Structural Footing - See Structural Engineers Drawings.
JF.## Cabinetwork Item SL dimensions Shiplap Cladding - Refer Schedule of Materials & Finishes.
07 5471 0340
07 5471 0343
0418 876 394
0412 127 904
Email [email protected]
www.barkdesign.com.au
Australia 4567
Noosa Heads
Bark Design Architects
Rev. DateShower Description Use figured Project No.
M mixer - Refer Schedule of Materials & Finishes. in preference SS to scale. Shower
All seat - Refer to detail. Project Drawing Title
ANGL 02.02.11
NaturalIssue
Ground Level
for DA dimensionsT to be varified Solid Timber Treads - Refer Schedule of Materials & Finishes.
Warren Site Plan 1055
OFC Off Form Concrete, class 2 nom. setout - Refer Schedule of Materials & Finishes.
and checked T1 on Ceramic
site. tiles- 300 x 600.
B 09.02.11 Issue for DA - Revisions
ORS
P
Open Riser stair - Refer Schedule of Materials & Finishes.
Post/ column. Refer to Structural Engineer's specifications.
These designs,drawings,
specifications
T2
T&G andTongue
Ceramic tiles, Ext. 300 x 600
the & Groove Hardwood Flooring Drawing No.
Residence
copyright thereof are the battens
PB
PCo.
10mm Plasterboard with paint finish TB
property of Bark Design 28409
Polished Concrete Flooring - Refer Schedule of Materials & Finishes. Pty Ltd and TDmust not
Timber
Trimdek
RAIA Member
- Refer Schedule of Materials & Finishes. Sunshine Beach DA.001
be metal sheeting installed as per maufacturer's specifications.
Steve Guthrie
Grahame & Carol Warren
PO Box 1355
PU Purlin - Refer to Structural Engineer's specifications.
Queensland
TFC or copied Trowel Finished Concrete - Refer to Scope of Works.
Lindy Atkin
Telephone
used, retained Architects Revision
R
Facsimile
R Recess in tiled wall - refer to detail without TOW the Top of Wall
written Registration No.
RBW 200 series reinforced rendered external blockwork. authority of TSBark Design Timber screen- refer to detail.
3664 (LA)
Date October 2010 Scale 1:100,
as shown1:5000,
@ A3 1:200 @ A3
B
Web
RBW1 200 series reinforced retaining blockwork. Pty Ltd. TS1 Timbet screen vertical- refer to detail
3668 (SG)
RCS Reinforced concrete slab on ground - See Structural Engineers Drawings. VB 6mm Villaboard, paint finish
RF Refrigerator - Refer Schedule of Materials & Finishes. WB Weatherboard - Refer Schedule of Materials & Finishes.
RH Rangehood - Refer Schedule of Materials & Finishes. WC Toilet
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 4 pages
Page 2
B
40
00
00
35
50
20
10
00
.9
.9
.4
.3
.3
.8
.3
.8
36
35
35
34
40
39
39
38
.W
.W
.W
.W
.W
.W
.W
.W
Pool fence Pool fence Concrete steppers
O
O
O
O
O
O
O
O
T.
T.
T.
T.
T.
T.
T.
T.
+
+
+
+
+
+
+
+
7. 6. 5. 4. 3. 2. 1.
CPV Planting Beach shower,
RL 32.700
RL 38.550 RL 36.700 Refer schedule.
RL 34.200 RL 32.865 EA
EA RL 35.230 EA
11.10. 9. 8. 7. 6. 5. 4. 3. 2. 1. 7. 6. 5. 4. 3. 2. 1. 7. 6. 5. 4. 3. 2. 1.
EA EA EA
RL 36.350
RL 35.150
RL 35.950
Line of building over
TO
Planter
W
Planting
38
+
50
.8
.9
15
RL 32.432
35
+
.W
RL 32.507
Step
Step
Seat
O
Garden
T.
RL 32.582
Line of building over
Line of building over
Covered Terrace
50
RL 38.550 PCo Driveway
.7
36
EA
.W
RL 32.700
O
T.
RL 36.750
Existing Pandanas
+
Garden
SL 35.550 +
tree to be relocated on
Pool site, T.B.A.
Ledge SL 35.550 +
Planting
35
.4
39
W
TO
Line of building over
Planter
+
RL 39.075
Services Planting
EA
50
Refer future landscape plan
.9
RL 32.700
36
.W
O
T.
+
20
.6
50
41
.7
PP
W
36
TO
Planting
W
+
TO
Remove power pole
+
O/H O/H O/H
Garden Drying Court Green Roof Planting and relocate, TBC.
00
EA RL 35.550
.7
35
4. 3. 2. 1.
L
R
Planting
+
Concrete upstand to
CPV
Green Roof Planting
Existing block retaining wall
TS
3. External Works Plan
Scale 1:100
07 5471 0340
07 5471 0343
0418 876 394
0412 127 904
Email [email protected]
www.barkdesign.com.au
Australia 4567
Noosa Heads
Bark Design Architects
Rev. Date Description Use figured dimensions Project No.
in preference to scale. All Project Drawing Title
A 02.02.11 Issue for DA dimensions to be varified
and checked on site. Warren External Works 1055
B 09.02.11 Issue for DA - Revisions These designs,drawings,
specifications and the
Residence Plan Drawing No.
copyright thereof are the
property of Bark Design
RAIA Member
28409
Sunshine Beach DA.003
Steve Guthrie
Pty Ltd and must not be Grahame & Carol Warren
PO Box 1355
Queensland
Lindy Atkin
Telephone
used, retained or copied Architects
R
Revision
Facsimile
without the written Registration No.
authority of Bark Design 3664 (LA)
Date October 2010 Scale 1:100 @ A3
B
Web
Pty Ltd. 3668 (SG)
Page 3
A B C D E F G H I J
4,200 2,000 2,000 2,500 1,400 2,100 5,400 3,000 900 6,200
NORTH
ELEVATION
B
S/S Beach shower,
Refer detail
RBW Mail box in block wall
CS Refer detail
North Boundary 94°20'40" 35.204
hc
1,500
RBW1 WPM up
7. 6. 5. 4. 3. 2. 1. CS
1
500
2
RBW1
Cavity drain, Line of glass roof over,
Line of floor over
Refer engineers detail. Space 1 Refer detail. TS
Line of floor over
Driveway TO
EA W.
5,200
WPM RBW1 R.L
Basement . 32
,40
TFC 0+
Approved self draining
granular material
ST.C Refer engineer. Space 2
WEST
ELEVATION
ST.C
Line of retaining over
3
RBW1
1,200
up Storage RBW RBW
1. 2. 3. 4. 5. 6. 7.
TFC ST.C
EAST 4
Pco.
1,100
CS ELEVATION
TS
1
Riser:16 @ 178mm
5" 15.48
Going: 250mm
184°20'40" 15.289
Location of air-conditioner condensing units, 5
Refer schedule.
Line of pool over
RBW2
Lift Service Location of gas bottles
guide
355°19'1
Court 2 x 5500L water tanks
EA (shown dotted). 5000L Water Tank
3,500
Cellar Refer schedules
TFC
Space 3 Space 4
Store/ hc
Workshop
JF.1
JF.3
TFC Bin location
oundary
RBW hc
East Boundary
JF.2
Blockwork column,
Line of floor over Refer engineer. 6
5000L Water Tank
RBW1 RBW2
2,100
Line of retaining over RBW1
West B
Waterproof tanking
WPM WPM to required height.
7
189
South Boundary 274°20'40" 32.776
WPM Sheet pile retaining wall,
Refer engineers detail.
SOUTH
ELEVATION
Basement Plan
Scale 1:100
07 5471 0340
07 5471 0343
0418 876 394
0412 127 904
Email [email protected]
www.barkdesign.com.au
Australia 4567
Noosa Heads
Bark Design Architects
Rev. Date Description Use figured dimensions Project No.
in preference to scale. All Project Drawing Title
A 02.02.11 Issue for DA dimensions to be varified
and checked on site. Warren Basement Plan 1055
B 09.02.11 Issue for DA - Revisions These designs,drawings,
specifications and the
Residence Drawing No.
copyright thereof are the
property of Bark Design
RAIA Member
28409
Sunshine Beach DA.104
Steve Guthrie
Pty Ltd and must not be Grahame & Carol Warren
PO Box 1355
Queensland
Lindy Atkin
Telephone
used, retained or copied Architects
R
Revision
Facsimile
without the written Registration No.
authority of Bark Design 3664 (LA)
Date October 2010 Scale 1:100 @ A3
B
Web
Pty Ltd. 3668 (SG)
Page 4
A B C D E F G H I J
4,200 2,000 2,000 2,500 1,400 2,100 5,400 3,000 900
NORTH
ELEVATION
Pool enclosure
gate B A
RBW
B
VAS
C
CS CS
North Boundary 94°20'40" 35.204 D
7. 6. 5. 4. 3. 2. 1. E
Planting Glass roof, F
up up up refer detail.
to main suite court
11.10. 9. 8. 7. 6. 5. 4. 3. 2. 1. Line of 7. 6. 5. 4. 3. 2. 1.
1 G
H
deck over
500
GD
DP Fall 2˚ DP
Planting
EA Planter F.C. sheet vertical fins, 2 I
Line of floor over P P Robe Refer detail J
JF.17
DP Bi-fold doors, K
Approved waterproof membrane, Refer schedule
refer engineers detail. hc L
High Seat
Bed 2
Low Seat
Sauna
180
PCo.1
JF.18
Bal 1
Seat
Covered Terrace
5,200
RBW1 °sw M
ing Pool PCo.
Viewing panel
into pool Covered Deck O
ST.C PCo. elow
ay b
GD
WEST Pool Equipment Location Pool Equip. Setdown to Shoe storage Glass screen f drivew P
o
ELEVATION Provide conc. slab Conc. slab for door under seat Ensuite 2 Line Q
(shown dotted). mat insert BBQ Shr
w.c PCo.2
Refer schedule JF.19 R
JF.16 Stacking aluminium shutters,
Line of bridge over Seat gas h/c r m Refer schedule
Location of air-conditioner 3
condensing units,
Planting
Linen
1,200
Refer schedule. Viewing panel into T
pool below W.02 up up JF.15 S Study Bi-fold door,
1. 2. 3. 4. 5. 6. 11. 12.13.14.15.16. JF.14 JF.13 Seat Refer schedule
Entry
JF.12
EAST 4
2 x 5500L water tanks Hall
Ledge
1,100
(shown dotted). 5500L Water Tank PCo.1
ORS CS External louvre blinds, ELEVATION
15.481
Refer schedules. Riser:[email protected] Bal 2 Riser:16 @ 178mm PCo.1 Refer schedule.
184°20'40" 15.289
Going: 250mm Going: 250mm
5
Line of bridge over JF.4
JF.9
JF.10
Warrior
Robe
Robe
Bed 3
5"
JF.7
JF.8
Pdr
Line of floor over
Line of
Storage Lift
guide
T1 Bath PCo.1
355°19'1
Lin.
PCo.2
JF.6 Bunk
dryer
court ov
3,500
Room
JF.11
Robe
Lin. PCo.1 Glass
wm DP screen
JF.5
5500L Water Tank RBW
L'Dry Bath
er
50 mr
y
.7 PCo.2 Shr
GD
HWS.
oundar
6 RBW
.3
.L
.R 6
East Boundary
W DP DP F.C. sheet vertical fins,
Planting hc
TO Green Roof Refer detail
+ Awn
O/H O/H
Awn Awn
O/H
2,100
West B
Approved self draining DP Approved ventilation for HWS, Drying Access to
granular material up Court "Green Roof" concrete upstand
Refer Schedule CS green roof. over basement,
refer engineer.
Fall to puddle flange Refer detail
Planting
7
South Boundary 274°20'40" 32.776 Clothline,
Refer schedule
TS
SOUTH
ELEVATION
Ground Floor Plan
Scale 1:100
07 5471 0340
07 5471 0343
0418 876 394
0412 127 904
Email [email protected]
www.barkdesign.com.au
Australia 4567
Noosa Heads
Bark Design Architects
Rev. Date Description Use figured dimensions Project No.
in preference to scale. All Project Drawing Title
A 02.02.11 Issue for DA dimensions to be varified
and checked on site. Warren Ground Floor 1055
B 09.02.11 Issue for DA - Revisions These designs,drawings,
specifications and the
Residence Plan Drawing No.
copyright thereof are the
property of Bark Design
RAIA Member
28409
Sunshine Beach DA.105
Steve Guthrie
Pty Ltd and must not be Grahame & Carol Warren
PO Box 1355
Queensland
Lindy Atkin
Telephone
used, retained or copied Architects
R
Revision
Facsimile
without the written Registration No.
authority of Bark Design 3664 (LA)
Date October 2010 Scale 1:100 @ A3
B
Web
Pty Ltd. 3668 (SG)
Page 5
J I H G F E D C B A
FC sheet cladding to clerestory roof F.C. sheet vertical fins, O/H
Awn
paint finish,
Fireplace flue, Refer detail Fascia
Refer schedule. Skylight, HWD Pergola to entry,
SL
Refer schedule. Refer detail
O/H
Awn VAS
G1 RBW G
41,775 Pitching Pt.
GL
from N
eight Limit
H
8.0m RBW
2,700
8.0m Height Limit from VAS
finished ground level 39,075 Upper First Floor
F.C. sheet vertical fins, paint finish, O/H
38,550 First Floor Refer detail
11. RBW
10.
Awn 9.
DP 8.
7.
6.
RBW NGL 5.
4.
3.
3,000
2.
F.C. sheet vertical fins, paint finish, 1.
7. RBW
Refer detail 5.
6.
4. CS
3.
HWD Pergola to entry, 2. Pool fence,
35,550 Ground Floor 2° 1.
Refer detail 7. Refer schedule.
6.
5. CS
NGL
4. RBW
3.
TS 2. VAS
1.
2,850
7. CS
6.
5. Glass roof behind,
4.
2.
3. shown dotted.
1.
32,700 Basement
RBW2
CS
8.0m Height Limit from finished ground level
07 5471 0340
07 5471 0343
0418 876 394
0412 127 904
Email [email protected]
www.barkdesign.com.au
Australia 4567
Noosa Heads
Bark Design Architects
Rev. Date Description Use figured dimensions Project No.
in preference to scale. All Project Drawing Title
A 02.02.11 Issue for DA dimensions to be varified
and checked on site. Warren North Elevation 1055
B 09.02.11 Issue for DA - Revisions These designs,drawings,
specifications and the
Residence Drawing No.
copyright thereof are the
property of Bark Design
RAIA Member
28409
Sunshine Beach DA.301
Steve Guthrie
Pty Ltd and must not be Grahame & Carol Warren
PO Box 1355
Queensland
Lindy Atkin
Telephone
used, retained or copied Architects
R
Revision
Facsimile
without the written Registration No.
authority of Bark Design 3664 (LA)
Date October 2010 Scale 1:100 @ A3
B
Web
Pty Ltd. 3668 (SG)
Used in these records
MCU11/0053 plans.PDFRelated documentApplication case desk ↗
About this file
- File size
- 3.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.