Original source · versioned page text
DA Form 1 - 36 Tarina St, Noosa Heads
10) Subdivision
10.1) For this development, how many lots are being eer] acy is the intended use of those om
Intended use of lots created Residential Commercial Industrial Other, please specify:
Number of lots created
10.2) Will the subdivision be staged?
0 Yes - provide additional details below
(No
How many stages will the works include?
What stage(s) will this development application
apply to?
Dividing land O pa 10)" ar- 10 | f—1—iaal 0 a pa 1h Oli ale) eated and re = =i ale | ie) eo e
Intended use of parts created Residential Commercial Industrial Other, please specify:
Number of parts created
Boundary realianme
at are = = and proposed areas for ea ot comp @ | e pre e
Current lot Proposed lot
Lot on plan description Area (m?) Lot on plan description Area (m?)
12.2) What is the reason for the boundary realignment?
13) What are the dimensions and nature of any existing easements being changed and/or any proposed easement?
(attach schedule if there are more than two easements)
Existing or Width (m) | Length (m) | Purpose of the easement? (e.g. Identify the land/lot(s)
proposed? pedestrian access) benefitted by the easement
Division 3 — Operational work
Note: This division is only required to be completed if any part of the development application involves operational work.
14.1) What is the nature of the operational work?
C1 Road work 0 Stormwater CO Water infrastructure
C Drainage work 0 Earthworks CJ Sewage infrastructure
C Landscaping O Signage OO Clearing vegetation
© Other — please specify: ada second CHOS30%r-
14.2) Is the operational work necessary to facilitate the creation of new lots? (e.g. subdivision)
C1 Yes - specify number of new lots:
| MINo
Queensland
Government
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.