Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

Decision Notice - MCU23 0065 & OPW23 0072 [As Published]

of 6

Page text shows just the words. Original shows the document exactly as it was published.

               15.    Rock scour protection, wrapped in geotextile, extends from 750mm up to approximately
                      5000mm from the face of the revetment wall in Noosa Waters. Piles are to be:
                      a.      Located clear of this rock protection where applicable, or alternatively
                      b.      Where the scour protection extends beyond 750mm:
                              i.       Prior to driving piles, the rocks are to be removed to expose the geotextile and
                                       the geotextile cut neatly to allow it to be turned back. During pile driving, care is
                                       to be taken to ensure the geotextile is not damaged. At the completion of pile
                                       driving, the fabric is to be turned down around the pile and the rocks replaced
                                       around the piles
               16.    The jetty and boatlifting device are to be used for private purposes only with no commercial
                      operations to be undertaken.
               17.    Boat repair activities are not permitted on site.
               18.    Wastewater and sullage must only be disposed of at approved pumpout facilities.
               19.    The mooring facility must not be utilised for live-aboard purposes.
               20.    Any construction and post construction activity is not to impact on the condition of the
                      waterway, and is to be conducted so as not to breach the Environmental Protection Act EPA
                      (1994) and the Environmental Protection (Water) Policy 2009.
               21.    Certification by a Registered Professional Engineer of Queensland that states that the jetty
                      and boatlifting device are constructed in accordance with best practice methods and are
                      structurally sound must be submitted to Council. This certification must be submitted to
                      Council within three (3) months of the completion of the works. A final inspection and
                      approval of the structure by Council’s Inspector is also required. Please contact Council’s
                      Development Assessment Branch on 5329 6500 to arrange the inspection.
               22.    This approval lapses where the construction of the jetty and boat lifting device has not
                      commenced within two (2) years of the date of issue of the approval, unless application is
                      made and approved by Council for an extension.
               23.    After completion, the proposed works must be maintained in a sound state of repair in
                      accordance with the approved plans.
               5.     REFERRAL AGENCIES

               Not applicable.
               6.     ADVISORY NOTES

               The following notes are included for guidance and information purposes only and do not form part
               of the assessment manager conditions:
                      General Advisory Notes
               1.     Council has undertaken an audit check of the Operational Works drawings in relations to the
                      proposed works. A detailed check of the calculations and drawings has not been undertaken,
                      as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects
                      of the engineering design. Council reserves the right to require further amendments and/or
                      additions at a later date should design errors become apparent.
               2.     The approval or conditions do not absolve the owner of the land from complying with all the
                      conditions of this approval and/or relevant Council By-Laws and Policies and/or relevant
                      statues and/or statutory regulations in the execution and/or performance of said works.
               3.     Council reserves the right to call up any performance bond held or levy charges against the
                      property, should emergency works be required to be undertaken by Council to make the site
                      safe due to inactivity on the development site for extended periods of time.




                                                                                                              Page 3 of 6
Document Set ID: 22441510
Version: 2, Version Date: 29/05/2023
Log in to download the original file

Decision Notice - MCU23 0065 & OPW23 0072 [As Published].pdf · 145 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.