sunshine Coast Checklist - Applications Involving Land
Regional Council Development & Land Use Sections

 

 

IDAS APPLICATION

This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter.

1. APPLICATION FORMS
1.1 Form PartA

1.1.1. Ensure that the form is fully completed and is a current version. |

 

 

 

 

4.1.2 In the case of an MCU or Op Works below the high-water mark, owner's consent is required.
1.1.2.1 If there are multiple owners, the consent of each owner is required.

4.1.2.2 If the owner of the land is a company, either ACN No, Company name clearly indicated by
signatory) or Company Seal required.

1.2 Form Part B-R Supporting Information
4.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-R are attached.
e 1.1.2.1. Ensure that each of Forms B-R which are attached are fully completed.
2. IDAS ASSESSMENT CHECKLIST
2.1. Ensure that relevant sections have been checked and/or completed with regard to referrals

2.2 Ensure correct parts of Form 1 are provided where required (ie most common are Part J for
Clearing Vegetation, Part N for Contaminated land and Part P for Prescribed Tidal Works)

LIN NL

3. ENVIRONMENTALLY RELEVANT ACTIVITIES
3.1 Ensure that Part G is completed if EPA referral is required.

3.2. Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application. (Refer Environmental Health for fees)

4. FORM 2- REQUEST TO CHANGE APPROVAL

4.4 Ensure that relevant items have been checked and/or completed including information regarding
applicant details along with owners consent if not current owner of land as shown on Council records.

If over multiple properties on one or more sites, consent of Body Corporate is required.

 

 

 

 

 

 

 

 

 

é PLANS : .
6.1 Ensure that generally at least 6 sets of the Plan of Development (5 for Reconfiguration and Operational
Works) accompany the application. In addition ensure that each set is complete.

6.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is
unbound.
6. SUPPORTING INFORMATION

6.1. Ensure that generally at least 6 copies of any report accompanies the application (5 for Reconfiguration | —
and Operational Works). If the application is accompanied by a covering letter, ensure that it is

eI

 

 

 

 

 

 

 

 

 

 

 

 

capable of reproduction. —
6.2 Inthe case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound.
6.3 Additionally an electronic version is preferred where possible for ease of electronic record keeping -
7. FEE
7.1. Ensure that the application fee, as determined from the Council's adopted scale of fees, W

 

accompanies the application or has been paid.

 

« Land Use MCU applications; MCU applications including a Lot reconfiguration; Prescribed Tidal Works; Operational
Work if Jetty or if including Landscaping.

e Land Development Lot Reconfiguration applications and Operational Work not including Landscaping

Please DO NOT leave the application at the counter and DO NOT deliver -he application to Records.

 

NSC g:\anduse\administrative processes\application checklist.doc
Full text of the other 41 pages

Page 2

 

YES COMMENT

 

IDAS REFERRAL AGENCIES TRIGGERS (Most frequent referrals) Fi Tick
Please refer to IDAS Checklist for complete list ease ic

 

Department of Main Roads (Concurrence or Advice)
¢ State Controlled Road

 

Dept Natural Resources & Water

« Acidsulphate soils (Advice) ttre
« Clearing of native vegetation on freehold land (Concurrence)

 

Environmental Protection Agency (Concurrence)

Environmentally Relevant Activity (for non-devolved Council as EPA)
Contaminated land
« Environmental Management/Contaminated Land Register
© UXO ee
* Land recently used as a ‘notifiable activity’
* Industrial land changed to sensitive uses (eg school)
e Coastal related development.
e Koala habitat
e Wetlands (Advice only)

 

Queensland Transport (Concurrence)
. Railway eee
° Public Passenger Transport

 

Energex or other responsible entity (Advice)

. Electricity Easements/Substations

 

OUM (Concurrence)
° SEQ Regional plan

 

VARIOUS

° Conservation estate (Advice) .

 

OTHER STATE AGENCIES + TRIGGERS

 

 

OWNER’S CONSENT (State land)

 

Department of Natural Resources and Mines

EPA

 

 

 

 

 

For further clarification refer to IDAS Guides prepared by Department of Infrastructure & Planning.

NSC g:Nanduse\administrative processes\application checklist.doc

Page 3

     
 

INTEGRATED PLANNING ACT 1997

Part A, Version 3.1, 3 March 2008

ao ea eneadvaelecien

 
 
 
   

Part A pecs foc te

Common details “2 6% “@<*4<7
PA 4 SUPE OL OF

OTE: Answer all questions unless directed to go to a particular question. Refer to the end of the form for advice on how to complete this form.

information provided on the IDAS Application Form is correct, This information is relied upon by the Assessment Manager and any referral agencies when assessing and

ing this application. By lodging this application, the Applicant incurs the obligations and responsibilities prescribed by the IPA. Any development permit or prefminary
oval that may be issued as @ wence of this application will be issued to the Applicant.)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Title
Postal address unshir |
Contact telephone number |5447 4835 1 Mobile phone number 0403 525 629 |

 

 

 

 

Facsimile number 5447 4835 :| e-mail address vynara@bigpond. com

 

 

 

[Details of the premises (.e. the and on which the development is proposed - refer to the advice at the end of the form) a : |
1. Identify the premises by completing Table A, or Table B and/or Table C (ensure adequate information is given to identify the pramises)
Table A If the application is for a mobile and temporary Environmentally Retevant Activity (ERA), complete Table A only. Then go to Q2.

 

{ “_8_<___» Name of each local government area in which the mobile and temporary ERA is proposed to operate

 

 

 

 

(Note: Loton plan details may be obtained from title documents, @ ‘Rate’ notice, or from the focal government.)

 

 

 

 

 

 

 
    

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

et 5 - Steel ates 7 — toton sents el Local government area 2. g. Loge 4
sc CRC - - Tewanti iN ' Street Name and official suburbviocalty name : Past Code Lot No. Plan Number Caims) 4
Front Copiiys | Bluefin Court Noosavite 4566 [2 RP906991 | Sunshine Coast
Cordinates and/or a map of the premises (Appropriate for development in remote areas, over part of a lot, in water (e.9. channel dredging in Moreton
Bay) atc.)
[ lam ee Coordinates . a eee . :
(not place each set of coordina in a separate ow) " Zone Datum Local government area
;Easting |. Northing. Latitude |. Longitude : Reference : ~ (if applicable)
L1 | [7 Dcpags
[: wesea
[77 Other -
2.

identify if any of the following apply to the premises by completing Tables D, E, or F. (Note: in most instances, the premises will not involve any of
the following characteristics, however some applications may involve one or more of these characteristics - complete only if applicable)

Page 4

INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
Table D Complete if the premises are adjacent to or associated with a water body, watercourse or aquifer (o.9. river, creek, fake, canal)

[1

 

 

 

Name of water body, watercourse or aquifer (if known)
Table E Complete if the premises are on Strategic Port Land under the Transport infrastructure Act 1994
Lot on 1 plan description for strategic port land . Port Authority for the fot
fr

Table F Complete if the premises are in tidal water

 

 

 

 

 

~~ Name of local government for the td

 

Name of port authority for the tidal area (if applicable)

 

 

 

 

 

 

 

 

 

 

 

 

[1
3. __ Indicate the total area of the premises on which the development is proposed: (Note: The total area may include land both above and belaw water)
r Total area of premises |
606,00 [xjm? [hectares (Tick appicablo unig
{Existing use of the premises

 

4. — Current use/s of the premises: (e.g. vacant land, house, townhouses, apartment builfing, shop, service station, school, sugar cane farming etc.)

 

[1 Vacant

 

5. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow, water etc,)?

No oO Yes - Ensure the type, location and dimensions of each easement are included in plans, submitted with the application
{Proposal details :
6. Brief description of the proposal (e.g. 6 unit apartment building, 30 ot residential subdivision, a bore, aquacutture)

 

 

Duplex Owelling

 

 

 

7. Does the poposal include new buildings or operational work (including any services) on the premises?
LI No Yes - Ensure the nature, location and dimensions of the proposed works are included in plans, submited with the application

 

iResource entitlement (if applicable)” - further information is provided in the advice section at the end of the form

8. Does the application involve taking or interfering with a State resource and therefore require a resource entitlement? (6.9. the appication
involves State land (leased and freehold), declared Fish Habitat areas, taking quarry material, taking or interfering with water under the Water Act 2000, etc.)

No - Goto. a9 C] Yes - Complete Table G - provide details for each evidence required on a separate row, if applicable. Evidence of resource
allocation or entitlement must be submitted with the application. You do not need to answer Q9 - go to the next section.

 

{Owner '$ consent (if applicable) - further information is provided in the advice section at the end of the form

9. Complete Table H for applications involving a material change of use; reconfiguration of a lot; work on land below high- ‘water mark and
not within a canal as defined under the Coastal Protection and Management Act 1995; or work on rail corridor land defined under the
Transport Infrastructure Act 1994 - provide details for each owner on a separate row, or on an attachment to this form if applicable.

 

 

 

 

Premises Owner's namels Details of the premises owned . « < | Dateconsent |
Table H and postal address... (stot adtiesso ton lon dasciphion) Owners signee” “| _was obtained
Vynara PL
1 6 Maher Tce § Bluefin Court Noosaville 4566
Sunshine Beach 4567

 

 

 

 

 

 

 

 

 

* Owner's signature cannot be pravided on the form if you intend to submit the application electronically. Owner's consent must be provided to the assessment manager on an
attachment containing appropriate written documentation of the owner's consent. If the owner is a company, $127 af the Corporations Act 2001 (Cwealth) details how a
company may sign as owner. Templates for the provision of owner's consent are available on the IPA website .

 

[Attachments and supporting information (Compete Table] - Use a separate row for each type of attachment or information, including information required
fer this, Part) Please ensure all documentation submited with this form, including oltter Parts of Form 1, or owrier’s conisent etc, are securely attached to this Part of the Form.

 

 

Description of attachment or information —

: Title 4 t plicable) . ke . Method of delivery to
able (4g. Pa of Frm 1,0 oars conse etme (09, Gon Authryemes Steet Repo Date ‘assessiert manager

 

 

 

 

 

 

 

 

Page 5

INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008

 

Portable Long Service Leave (PLSL) levy (Appicabie for certain building and construction work valued aver $80,000 only) |
10. The Portable Long Service Leave Levy (PLSL) is not applicable to this application if any of the following apply: ( Tick box if appfcable)

11.

Oo
O

oO
O

's pe

[No - EndofPata a A IEE

the application seeks a preliminary approval only;

the application is not for building and construction work under the Building and Construction Industry (Portable Long Service
Leave) Act 1991, section 3AA (e.g. the application is only for a change of use, or for the following types of work carried out solely for
farming purposes: land clearing, site preparation, earthworks, fences, fodder harvesting, clearing of encroaching vegetation, clearing of
regrowth, thinning vegetation or controlling weeds or pests);

all costs, that relate to the work both directly and indirectly, are less than $80,000, inclusive of GST: or
the work is being carried out under an owner-builder permit issued under the Queensfand Building Services Authority Act 1991 -

Complete and submit a QLeave Nofification and Payment Form (no payment required if owner-buiider permit number stated). The receipted form must be
Sighted by the assessment manager before a development permit can be given.

ayment of a PLSL levy applicable to this application? (Refer fo Q10 and the Advice below for more information)?

ABU ISE,

(1 Yes - Answer Qt2beow = ~~ (> hE PAID Ww hewn Aron IS JOWown

 

OFFICE USE ONLY (For use by the Assessment Manager / Private Certifier) (Optional)

 

 

Fee ($)

 

 

 

 

 

 

 

 

 

. Receiving officers Reference
Zrobse | Datereceived) 92/u1 5 @ name Ps Aivve numbers | O& ( tyey

 

NOTIFICATION OF ENGAGEMENT OF PRIVATE CERTIFIER~ . ‘ |

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

To: Council. | have been engaged as the private certifier for the building work referred to in this application.
Dateot e —s 7 — eS —— Se —
engagement |» L. / Name ee ea BSA Certification number . Buieing dlesciicatonis |
QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)
= —— = “Dae mecapisa PO =
aa “ Q .. dae ote nig’: | formsighted by | Name of officer who sighted the
Description of the work QLeave Project Number Amount paid %) Date paid | assessment |. form
ine suf = ee wes manager ws
1

Privacy Statement

The information collected on Form 1 will be used by the Department of Infrastructure and Planning (DIP) in accordance with the processing and assessment of your Application.
Your personal details will not be disclosed for a purpose outside of the IDAS process, except where required by legisiation (including the Freedom of Information Act 1992) or as
required by Parfiament. This information may be stored in a DIP database. The information collected wit be retained as required by the Public Records Act 2002.

 

Advice for completing Part A

 

General advice

Part A of IDAS Development Application Form 1 must be completed and accompany all development applications. The applicant is responsible
for answering ail questions fully and correctly, unless following a response there is a statement to go directly to another question. The
Assessment Manger may refuse to receive an application that is not properly made.

The IDAS Assessment Checklist must also be completed for all development applications, other than those tequiring assessment against the
Building Act 1975 only, i.e. those applications requiring the completion of Parts A and B only.

 

 

Applicant details

If the applicant is a company or organisation, a contact person must be nominated. The applicant's signature is not required to be provided
under the IPA.

 

 

 

Page 6

INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008

 

Details of the premises

The term ‘premises’ is defined by the IPA, schedule 10 to mean a building or other structure, and land (whether or not a building or other

structure is situated on the land). The term ‘land’ is also defined to include the estate in, on, over or under the land.

Details of the land are not required if the application involves a mobile and temporary Environmentally Relevant Activity only. Instead complete

Table A.

The premises may be identified in a number of ways —

« Street address and lot on plan are most common and will apply to most applications.

* Coordinates may provide the best means of accurately identifying the location of development proposed in waters, or on a relatively small
development site distant from property boundaries on a large lot. Sufficient coordinates need to be provided to identify the boundary of the
premises the subject of the application. Eastings and northings using GDA94 datum is preferred, but longitude and latitude and other
(specified) datum such as Zone Reference or GS84 may be provided.

The definition of ‘water body’ and ‘watercourse’ can vary from Act to Act.

StrategicPortLandis within a local government area but a local government's planning scheme does not apply onStrategicPortLand.

StrategicPortLandis declared under the Transport Infrastructure Act 1994. For further information go to |IDAS Guide 11 (Development on

strategic port land) and the Queensland Transport (Ports) website.

“Tidal water’ is defined in the Coastal Protection and Management Act 1995 (Schedule) and ‘tidal area’ for a local government and for strategic

port land is defined in the IPA (schedule 10). Generally, the area below ‘high-water mark’ (defined by the Coastal Act in relation to high water

mark at spring tides) establishes the boundary of a tidal area. Land below high water mark is not within a local government's area unless
provided for under the Local Govemment Act 1993. Unless otherwise provided for by legislation, a local government has no jurisdiction below
high water mark. A tidal area for strategic port land is within the jurisdiction of the relevant port authority, while the Environmental Protection

Agency generally has jurisdiction for a local government tidal area. However, the IPA gives local governments jurisdiction for assessing and

deciding applications for prescribed tidal works within the local goverment tidal area, and the planning scheme may be applied to that

assessment (to the extent provided for in the code for prescribed tidal work).

 

Resource entitlement

Section 3.2.1(5) of the IPA requires evidence of resource entitlement be given for applications if they involve taking or interfering with a
prescribed State.resource. Schedule 10 of the Integrated Planning Regulation 1998 (IPR) prescribes the State resources, including State-
owned land, where evidence is required to be given, and the evidence required to support the application. Link to integrated Planning
Regulation. Section 3.2.1(10){a){ii) states an application cannot be taken to be properly made without the required evidence.

For applications involving the taking or interfering with water under the Water Act, the development application may be made at the same
time as the request for resource entitlement, and the Department of Natural Resources and Water will accept the application as properly made,
For State-controlled roads, a resource entitlement is not required for an activity that is exempt ancillary works or encroachment (identified by
gazette notice under the Transport Infrastructure Act 1994, section 50), or if the activity requires referral to the Department of Main Roads.
Evidence may be required from more than one Department responsible for a State-owned resource, e.g. from the Environmental Protection
Agency for quarry material below high water mark, and the Department of Natural Resources and Water in relation to the State-owned land
above high water mark.

 

Owner's consent

Section 3.2.1(3) of the IPA prescribes that an application must contain, or be supported by, the written consent of the land owner/s, if the
application involves: a material change of use; reconfiguration of a lot; work on land below high-water mark and not within a canal as defined
under the Coastal Protection and Managemenit Act 1995; or work on rail corridor land defined under the Transport Infrastructure Act 1994.
Evidence of this consent may need to be provided before the application will be accepted as properly made by the Assessment Manager, during
the processes of the application or in the event of an appeal about the outcome of the application.

“Owner for the purpose of a lodging an IDAS development application means the person at the time of lodging the application, entitled to
receive the rent for the land (or would be entitled to receive the rent for it if it were let to a tenant at a rent).

Templates are available from the [PA website for the provision of owner's consent as an attachment to this form. However other documentation
May be used for providing owner's consent provided it is clear the documentation relates to the development application for the premises.
Owner's consent, if required, must be provided even if the applicant is the owner. Owner's consent is not required for a mobile and temporary
ERA.

 

Portable Long Service Leave (PLSL) Levy

 

The Building and Construction Industry Portable Long Service Leave Scheme provides long service leave entitlements to workers in the building
and construction industry who would be unlikely to accrue enough service with one employer to qualify for long service leave. To fund the
scheme, a Portable Long Service Leave Levy (PLSL levy) is collected on certain building and construction work carried out inQueensland.

The PLSL levy amount and other prescribed percentages and rates for catculating the levy are stated in the Building and Construction Industry
(Portable Long Service Leave) Regulation 2002. included in the amount collected by QLeave is the Workplace Health and Safety Fee and the
Building and Construction industryTrainingLevy.

The Building and Construction Industry (Portable Long Service Leave) Act 1991 (PLSL Act) defines the building and construction work subject to
the PLSL levy and includes renovating, relocating, constructing, altering, demolishing, maintaining or repairing buildings, pools, roads, jetties,
Pipelines, fences or earthworks, and works for subdividing, irrigating or draining land.

The PLSL levy need not be paid when the apptication is made, but the PLSL Act requires the levy to be paid before a development permit may
be issued,

The Assessment Manager must sight an approved form issued by QLeave advising of the status of the payment of the PLSL levy. Building and
Construction Industry Notification and Payment Forms are available from anyQueenslandpost office or agency, on request from QLeave, or can
be completed on the QLeave website at www.gleave.qid.gov.au. For further information contact QLeave (Tel: 1800 803 481 Web:

www. gleave.qid.gov.au }

 

 

Page 7

INTEGRATED PLANNING ACT 1997 Part E, Version 3.1, 3 March 2008

Sarna aeacue Waelecii

 

Nature of the works

 

 

1. Nature of work that requires assessment against a planning scheme:

 

(CJ Building work - Complete Table A Operational work - Complete Table 8
Table B
(i) What is the nature of the operational work?
( Roadworks Stormwater (1) Water infrastructure JA Sewerage infrastructure
Landscaping ([] Earthworks (2) Drainage Works 1 Signage
(CJ Clearing vegetation under the planning scheme (1) Other - Specify below

{ii) What type of approval is being sought? (NOTE: it you have indicated multiple operational works in question (i) above and your answers fo this
question would be different for different operational work, it may be more appropriate to provide these details in an attachment to this form)

Development Permit ([] Preliminary approval {L] Both (Specify below)

(iii) Is the operational work necessary to facilitate the creation of new lots (ie. subdivision)?
No ([] Yes - Specify the number of lots being created

(iv) Are there any current approvals associated with this application? (e.g. Development Permit or Preliminary Approval for MCU or reconfiguring
alot)

{[] No Yes - Complete Table B(a)

 

 

 

 

 

 

 

 

 

 

Table Bia) ___ list of approval references . ” Date approved : ‘Date approval lapses (if known)
1 DA2008/203 18 March 2008 18 March 2012
2. Whats the dollar value of this operational work? (ic. the total value including GST, materials and labour) | $ TBA. TORE ADVISED |

 

 

 

{Mandatory Information, . Ste as ki “ tye . a a |

3. Confirm that the following mandatory information accompanies this application

 

 

 

 

 

Confirmation of | ey
lodgement Method of lodgement
Plans, andspecifications if applicable, showing the nature and location of the proposed works (including the
lextont of any cut and fil Confirmed

 

 

 

OFFICE USE ONLY

 

 

 

 

 

Page 8

 

INTEGRATED PLANNING ACT 1997 Part E, Version 3.1, 3 March 2008

Advice for completing Part E

General advice
« Part A must also be completed for ail IDAS development applications.
* The applicant is responsible for answering alt questions fully and correctly, unless following a response there Is a statement to go directly to another question.

 

 

Qi A development permit authorises development to occur, white a preliminary approval is a step in the approval process and does not authorise development to occur

 

 

Page 9

    
   

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.2, 34 March 2008
Form 1 Development Application

Assessment Checklist

 

DAS Devetopnient Application Form 1 is the approved form for all development applications under the Integrated Planning Act
1997 IPA). Form 1 is made up of various Parts.

Part A (Common details) of Form + must be completed for all applications. The relevance of other Parts of Form 1 depends on
the nature of the application,

Form 1 also includes the IDAS Assessment Checklist, which is used to assist in determining State assessment and referral
requirements, and the Parts of Form 4 relevant to the application.

“Séction anid all other relevant sections of the IDAS Assessment Checklist, as identified in the Table below, must be
{completed for all development applications except these proposed on land in an urban development area, or for building work
requiring assessment against the Building Act 1975 only. —
For more information about development applications on land in an urban development area, refer to www.ulda.qid.qov.au.
For. more advice about building applications refer to Part B of the IDAS Application Form,

Answering the following questions will assist you in determining which sections of the checklist must be completed for your application.

 

 

 

 

For all IDAS development applications (except those for building work requiring assessment against the Building Act 1975 only) - complete Section 1 of this
checklist

Does the application seek approval to materially change use of the premises?

 

 

 

 

 

if yes - complete Section 2 of this checklist ClYes |B}No
Does the application seek approval to reconfigure a lot? CYes |i]No
if yes - complete Section 3 of this checktist and Part F of IDAS Application Form 1. Assessment is by the focal government.

Does the application seek approval to carry out operational work?

if yes - complete Section 4 of this checklist ba Yes |(JNo
Does the application seek approval to carry out building work requiring assessment against the Fisheries Act 1994? Ces |ptNo
if yes - complete Section 5 of this checklist

Have you received a referral agency response under section 3.3.2.of the IPA, in relation to this development application?

if yes - complete Section 6 of this checklist. C1Yes |[k]No

 

Does the application seek approval to carry out building work requiring assessment against a local government planning

scheme? (Yes |)No
if yes - complete Part E of IDAS Application Form 1. Assessment is by the local government.

Does the application seek approval to carry out building work requiring assessment against the Building Act 1975?
if yes - go to Appendix 1 of this checklist for advice on building referrals. Complete Part B of IDAS Application Form 1. DYes |—INo
Assessment is by a building certiffer

 

 

 

 

 

 

 

 

ISECTION 1 section 1 must be completed forall applications that require completion of the IDAS Assessment Checktist.

(HERITAGE 2 * Sa

14 Answer both A and B below.
A |s any part of the proposal intended to be carried out on a Queensland Heritage place u
1992?

W1No-coos [Yes

 

   

Page 10

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.2, 34 March 2008

B Does the proposal involve development, other than development mentioned in the Integrated Planning Act 1997 Schedule 9
(development that is exempt from assessment against a planning scheme), that is intended to be carried out on a place entered
in a Local Heritage Register under Part 78 of the Queensland Heritage Act 1992?

a No - Goto Q1.2 O Yes - (Complete Form 1, Part C2) This application requires assessment by the relevant local government against the IDAS
Code in the Queensland Heritage Regulation 2003. Hf the development involves building work and the local
government is not the Assessment Manager for the application, the local government has jurisdiction as Concurrence
Agency,

JPA, schedute 8, part 1, table 5, item 2A, schedute 9, tables 1, 2, 3, 4 & 5; IP Reguiation, schedute 2, table 1, item 114; IPA, section 1.3.5 (Definitions for terms used in development);
Queensiand Heritage Regulation 2003, schedule 2 (IDAS Code).

 

(REMOVING QUARRY MATERIAL; WILD RIVER AREA 1

 

1.2 Does the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000?
No-Gotoa13 ((] Yes

IPA, schedule 8, part 1, table 5, item 1; IP Regulation, schedule 2, table 2, item 11; IP Regulation, schedule 1, table 5, item 2 (wild river area); Water Act 2000,
section 966C; Wild Rivers Act.2005, section 43A

 

[ENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA |

13 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?

No-Gotoar.4 (_] Yes

IPA, schedule 8, part 1, table 2, Item 1; IPA, schedule 8, part 1, table 5, items 3 and 4; IP Regutation, schedule 2, table 2, items 1 and 23; Environmental Protection Act 1994, section
TAA (wild river area); Wild Rivers Act 2005, section 43A; relevant wild river declaration; Wild Rivers Code,

 

 

 

 

WITHIN THE LIMITS OF APORT : : ft
14 !s any part of the premises within the limits of a port under the Transport Infrastructure Act 1994?

Ue - Goto Q1.5

CL Yes

IP Regutation, schedule 2, table 2, items 15 and 16
[DECLARED FISH HABITAT AREA: « i ok i
15 Does,any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?

ye - Goto Q1.6

oO Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule
8, this application requires assessment by the Department of Primary industries and Fisheries (DPI&F). If DPI&F is not the
Assessment Manager for the application, the agency has jurisdiction as Advice Agency.

IP Regulation, schedule 2, table 2, item 26

 

 

(COMMUNITY INFRASTRUCTURE — |
1.6 Is any part of the premises designated for community infrastructure?
No - Go to Q1.7
(Yes

JP Regulation, schedule 2, table 3, item 7

 

@

\WASTE WATER MANAGEMENT

17 Does the proposal involve the establishment or expansion of a waste water disposal system?

KANo - End of Section? (_] Yes
IP Regulation, schedule 2, table 3, item 5

 

 

 

SECTION.4 + Section 4 must be completed when the application seeks approval to carry out operational work.
PLANNINGSCHEME- . a . ke es |

41 Is any of the proposed operational work assessable under a planning scheme?
O No - Go to Q4.2 Yes - (Complete Form 1, Part E) Answer Qs4.1.1 - 4.1.7 below.

 

 

Page 11

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.2, 31 March 2008

 

 

(STATE-CONTROLLED ROAD |
4.1.1 Is any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlied road?

No

C1 Yes

If no, is the proposed operational work for filling or excavating listed in Integrated Planning Regulation 1998,
schedule 5 and does it exceed the threshold?

(1 No -Gotoa4.1.2

Oo Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
JP Regulation, schedule 2, fable 3, item 3; IP Regulation, schedule 2, lable 3, itern 1(b)

“ACID SULFATE SOILS

4.1.2 Is any of the operational work proposed in a local government area listed*' in State Planning Policy 2/02: Planning and Managing
Development Involving Acid Sulfate Soils

11 No -Gotoa4.1.3 Yes

4A purukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Burnett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Cooloola, Douglas,
Ml

Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Momington, Noosa, Pine Rivers
Reddiiffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday

If yes, is the natural ground level of any point where work is being carried out less than 20m AHD?

LJ No

Yes
If yes, does the proposed operational work involve the following?
(i) Excavating more than 1,000m? of soil or sediment at or below 5m AHD 0 No 0 Yes
(ii) Filling the premises with 1,000m: or more of material with an average depth of O] No 0 Yes

0.5m on land, soil or sediment at or below 5m AHD

Ityes to either or both (i) or (ii) above - This application must to be referred fo the Department of Natural Resources and Water (NRW)
as Advice Agency

IP Regulation, schedule 2, table 3, item 4; State Planning Policy 2/02: Planning and Managing Development involving Acid Sutfate Soils, section 3.6
[EASEMENTS AND SUBSTATIONS

se Rw 8 ete oy go is ee : a . |

4.1.3 Is any of the proposed operational work for filling or excavation?
(1 No -Gotoa4.1.4

Yes

If yes, is the filling or excavation associated with reconfiguring a lot?
LT Yes - Goto 04.14
No - Answer both (a) and (b) below

(a) Is any part of the premises subject to an easement in favour of a distribution entity or transmission entity under
the Electricity Act 1994?

No
(J Yes
(b) Is any of the operational work proposed to be located within 10m of a substation site under the Electricity
Act 1994?
No O Yes - This application must be referred to the entity responsible for the substation as Advice Agency.
IP Regulation, schedule 2, table 3 item 10(a); IP Regulation, schedule 2, table 3, item 10{b)

414 — \s any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number 1 issued under the

Petrofeum Act 1923 for the construction or operation of the Moonie to Brisbane strategic pipeline under that Act?
No -Gotoas.1.5 [_] Yes

IP Regulation, schedule 2, table 3, item 17

Page 12

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.2, 31 March 2008

PUBLIC PASSENGER TRANSPORT |

4.1.5 Is any of the proposed operational work listed in schedule 13C of the Integrated Planning Regulation 1998 and does it exceed the
specified threshold?

No- Go to 04.1.6 oO Yes - This application must be referred to QueenslandTransport (QT) as Concurrence Agency.
IP Regulation, schedule 2, table 3, item 14

 

 

|RAILWAY SAFETY AND EFFICIENCY : |
4.1.6 Is any of the proposed operational work listed in schedule 13D of the Infegrated Planning Regulation 1998 and does it exceed the
specified threshold?

No-Goto4.1.7  [[] Yes - This application must be referred to QueenslandTrensport (QT) as Concurrence Agency.
IP Regulation, schedule 2, table 3, item 15

IKOALA CONSERVATION |

4.1.7 Is any part of the premises in a koala conservation area or koala sustainability area?
No -Gotoas2 ((] Yes
IP Regulation, schedule 2, table 3, item 19

 

WILD RIVER AREA - Although legislation provides for assessment of operational works for residential, commercial and industrial
development for the purposes of the. Wild Rivers Act 2005, currently no declarations for. any of the wild fiver areas apply the Wild Rivers
code to that type of development.

 

 

 

 

 

‘ASSOCIATED WITH RECONFIGURING A LOT; RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT IN A WILD RIVER
AREA 2 .
4.2 Is any of the proposed operational work associated with reconfiguring alot and the reconfiguration is also assessable?

[J No -Gotoa3 ((] Yes

IPA, schedule 8, part 1, table 4, item 2; IP Regulation, schedule 1, part 2, table §, item 1(c)
Wild Rivers code (Note: the code does not currently contain applicable provisions for residential, industrial or commercial development inside a designated urban

 

 

 

 

area}
VEGETATION CLEARING; KOALA CONSERVATION; WILD RIVER AREA |
4.3 is any of the proposed operational work for the clearing of native vegetation to which the Vegetation Management Act 1999
applies?

(No -Gotoas4 ((] Yes

IPA, schedule 8, part 1, table 4, items 1A-1G; IP Regulation, schedule 2, table 2, item 5 (vegetation clearing); IP Regulation, schedule 2, table 2, item 34 (koala

conservation); [P Regulation, schedule 1, part 3, table 4, item (vegetation clearingAuild river area); Vegetation Management Act 1999, section 22A (vegetation
clearing/wild river area); Wild Rivers Act 2005, sections 31F and 43A

[TAKING OR INTERFERING WITH WATER; WILD RIVER AREA _ , ]

44 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with water from a watercourse, lake or spring (other than using a water truck to pump water, and other than under
the Water Act 2000, section 20(2), (3) or (5)), or from a dam constructed on a watercourse or lake?

[J No -Gotoa45 ([(] Yes - Answer (a) and (b) below

IPA, schedule 8, part 1, table 4, items 3{a); IP Regulation, schedule 2, table 2, item 8; IP Regulation, schedule 1, part 3, tabte 4, tems 3 and 3A; Water Act 2000, section 966A (wild river
area); Wid Rivers Act 2005, section 43A; relevant wild river declaration; Wild Rivers Code

45 Is any of the proposed operational work for any thing constructed or installed that allows, under the Wafer Act 2000, for taking or
interfering with artesian water (other than using a water truck to pump water)?
[No Gotoa46 [] Yes - (Complete Form 1, Part K,) This application requires assessment by the Department of Natural Resources and Water

(NRW). if NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
IPA, schedule 8, part 1, table 4, item 3(b); iP Regulation, schedute 2, table 2, item 8; IP Regulation, schedule 1, part 3, table 4, item 3
Wild Rivers code (Note: the code does not currently contain applicable provisions for taking or interfering with artesian water)

Page 13

 

£0 Construction Hydraulic

rn

Building Service Engineers

 

Calculation of Stormwater Runoff and Detention Requirements for:
Project: 5 BLUEFIN COURT
Ref: 1874 Date: 11/04/08
Calculate increase in peak flow due to extra impervious area
Predevelopment Case
Maximum event
time of Concentration
Intensity (1)
Existing site area (A)
Calc coeff of runoff
From QUDM Table 5.04.2
for Q10 intensity
With fraction impervious
{nterpolating C10
From table 5.04.3
frequency factor Q100
Therefore Coefficient of runoff for grassed site Q100

 

Peak runoff for predeveloped catchm

@ Post Development Case
a) New Impervious Catchment Area
Coeff of Runoff
Intensity as before
Therefore peak Runoff

b) New Pervious area
Coeff of runoff as before

Intensity as before
Therefore peak Runoff

Total Peak runoff post development case
Difference in peak flow Runoff due to development

Therefore Required reduction in peak flow for Maximum event
) difference in peak flow between developed and undeveloped areas

ua

io

PO Box 1176 Buddina 4575

Q100
5 mins
326 mm/hr
606 sq.m

200.00 mm/hr
0.00
0.70

1.20
0.84

Coeff of R * Intensity * Area/360G L/sec
46 Ws

340 sq.m
1
326 mm/hr
Coeff of R * Intensity * Area / 3600
31 Ls
Total site Area - new impervious area
266 sq.m
0.84
326.00 mm/hr
Coeff of R * Intensity * Area / 3600
20 Lis

runoff pervious + runoff impervious
51 Lis
Peak runoff post dev - Peak runoff pre dev.

5 Lis

5 Us

Page 14

Detention tank design
From Urban Road design Manual Vo! (10-7080)

For small catchments hydrograph may be approximated as folls:-

Use triangular shape with duration

Actual catchment area entering tank from proposed site
Pipe rainfall design intensity entering tank Q20

Weighted Coeff of runoff
Peak Flow entering tank
Therefore Peak Flow entering tank

nou

2.67 x Time of Concentration

242 sq.m.
252 mmihr
0.95

C*1*A/3600

16.1 Litres/sec

(Note: Pipes entering the tank are designed for the above intensity. All flows in excess of this will be bypassed to O'Land Flow

or other pipework)

(However it is still necessary to produce the required reduction in peak flow for the maximum event shown above)

Outflow Hydrograph (from storage device)

 

Soil Permeability = 0 miday
= 0,000 mm/sec
Absorption Area = 0 sq.m
Therefore absorption = 0,000 Lisec
Outlet Device
O'Flow device weir/pipe (W/P) = p
Outlet Pipe dia = 70 mm
Outlet Pipe length = 1 m
Outlet Pipe grade 1:? = 100
Try Storage Length = 2 m.
Storage width = 1000 mm
Available storage depth below Pipe outlet IL = 0.0 mm
Therefore Storage Vol below o'flow device = 0 Litres
(includes vol stored in absorption trench)
Storage Area above O'Flow = 2 Sq.m.
Void Ratio = 1
RESULTS
Max Inflow == 16.1 (L/sec) Max depth over weir/oflow IL 950 (mm)
Max Outflow = 10.1 (L/sec) Area of storage above weir/Oflow IL 2 sq.m
Reduction = 6.0 (L/sec) Therefore Vol aboveOFlow IL 1.90 cum
Required Reduction= 49 (Lisec) Vol below oflow IL (from above) 0.0 cu.m
Therefore OK Therefore Total storage vol. 1.90 cu.m
therefore Total Storage depth 950 mm

 

 

 

Page 15

Stormwater Hydrograph through Tank

 

 

 

 

 

 

 

 

 

 

 

 

 

 

       

16 ee |
gi4i pe __ No Detention |_|
$12 — — — >" With Detention | 1
oO e - —_— #-_——_— _— —--’.

oO —=S #« — ——— > -

5 x a

= 3 — ——-—

° .

= 4 a ee
2+ — - — — —-— |}
0 ee

 

0 2 4 6 8 10 12 14 16 18 20

Time (mins)

Method:
Total inflow in litres = total outflow + storage (over any given time period)
Total outflow Amount over weir + amount absorbed

Total storage Static storage below the overflow + dynamic storage above the overflow

{Any storage utilised in a gravel bed is adjusted for the void ratio.)

Storage above the weir, and flow over the weir, are dependant on the depth above the weir, or outlet pipe IL.

All variables in the above equation are known except the depth above the weir or o'flow device.

To avoid intergration of the above formulas, time increments are used to solve for depth.

The time increment used is 0.1mins. These increments are hidden on the spreadsheet below to save space.
Flow increments are progressively added to produce the result.

Any difference between the final output volume and the input vol is approximately the amount still held in storage.
This storage is gradually absorbed, or used for irrigation between rainfall events or run out, or slow leaked out.

If the tank outlet is a weir, the weir formula is used to calculate the depth of water in the tank

If the tank outlet is a pipe, a pipe ‘part flow' formula is used for all tank depths up to the pipe obvert level.

As the water depth in the tank rises, the pipe is then checked for both an orifice and pipe flow (manning) formula.
The formula that gives the most restriction to the flow, is the one selected.

This is then used to calculate the depth of water in the tank, or other storage device.

Sometimes a slight wobble can be seen in the curve where the transitions between formulas occur.

The tank water level is also adjusted for exit losses equating to 1.5V“2/(2g)

 

 

1000.0
800.0

 

 

600.0 {

 

 

—depth |

400.0 +

Depth mm

200.0

 

 

 

 

 

 

 

Page 16

 

 

 

Inflow in previous Cumulative Depth over Outflow thru Cumulative
Time Q.1min inc. inflow weir/orifice Over flow Outflow
mins Us Litres mm Lisec Litres
0 0 0 0.0 0.0 0
0.5 1.61 24 10.0 0.3 4
1 3.22 97 30.0 0.8 20
1.5 4.83 217 70.0 2.2 68
2 6.44 386 110.0 3.0 162
2.5 8.05 603 170.0 4.0 260
3 9.66 869 230.0 47 393
3.5 11.27 1183 310.0 5.6 551
4 12.87 1545 400.0 6.4 733
45 14.48 1955 500.0 7.2 939
5 16.09 2414 620.0 8.1 1169
5.5 15.13 2882 720.0 8.7 1423
6 14.17 3322 810.0 9.3 1694
6.5 13.20 3732 870.0 9.6 1979
7 12.24 4114 920.0 9.9 2272
75 11.27 4467 940.0 10.0 2571
8 10.31 4790 950.0 10.1 2873
8.5 9.35 5085 950.0 10.1 3175
9 8.38 $351 930.0 10.0 3475
9.6 7.42 §588 900.0 9.8 3771
10 6.46 5796 860.0 9.6 4062
10.5 5.49 5976 810.0 9.3 4343
41 4.53 6126 750.0 8.9 4615
11.5 3,57 6247 680.0 8.6 4875
12 2.60 6340 600.0 7.9 5120
12.5 1.64 6403 520.0 7.4 5349
13 0.67 6438 440.0 6.7 5559
13.5 0.00 6445 350.0 6.0 5746
14 0.00 6445 260.0 5.1 5908
14.5 0.00 6445 190.0 4.2 6047
15 0.00 6445 140.0 3.5 6162
15.5 0.00 6445 111.7 2.8 6253
16 0.00 6445 60.0 1.8 6317
16.5 0.00 6445 40.0 4.1 6357
17 0.00 6445 30.0 0.8 6383
17.6 0.00 6445 20.0 0.5 6398
18 0.00 6445 10.0 0.3 6410
18.5 0.00 6445 10.0 0.3 6418
19 0.00 6445 0.0 0.1 6425
19.5 0.00 6445 0.0 0.1 6428
20 0.00 6445 0.0 0.1 6431

 

 

 

 

 

 

Note 0.1min. time increments are used but hidden to save space

Reinhold Koenning
Msc PhD MIEAust RPEQ.

 

Page 17

 

 

Construction Hydraulic ™

Building Service Engineers

 

Calculation of Stormwater Runoff and Detention Requirements for:
Project: 5 BLUEFIN COURT
Ref: 1874 Date: 11/04/08
Calculate increase in peak flow due to extra impervious area
Predevelopment Case
Maximum event
time of Concentration
Intensity (1)
Existing site area (A)
Calc coeff of runoff
From QUDM Table 5.04.2
for Q10 intensity
With fraction impervious
Interpolating c10
From table 5.04.3
frequency factor Q100
Therefore Coefficient of runoff for grassed site Q100

Peak runoff for predeveloped catchm
@ Post Development Case
a) New Impervious Catchment Area
Coeff of Runoff
Intensity as before
Therefore peak Runoff
b) New Pervious area
Coeff of runoff as before

Intensity as before
Therefore peak Runoff

Total Peak runoff post development case
Difference in peak flow Runoff due to development

Therefore Required reduction in peak flow for Maximum event
@ difference in peak flow between developed and undeveloped areas

no neon u how

non

orion bk ttn ana

PO Box 1176 Buddina 4575

Q100
5 mins
326 mm/hr
606 sq.m

200.00 mm/hr
0.00
0.70

1.20
0.84

Coeff of R * Intensity * Area/ 3600 L/sec
46 Lis

340 sq.m
4
326 mm/hr
Coeff of R * Intensity * Area / 3600
31 Lis
Total site Area - new impervious area
266 sq.m
0.84
326.00 mm/hr
Coeff of R * Intensity “ Area / 3600
20 Lis

runoff pervious + runoff impervious
51 Lis

Peak runoff post dev - Peak runoff pre dev.
5 Lis

5Us

 

Page 18

Detention tank design

From Urban Road design Manual Vol (10-7080)
For smail catchments hydrograph may be approximated as folls:-

Use triangular shape with duration

Actual catchment area entering tank from proposed site

Pipe rainfall design intensity entering tank Q20
Weighted Coeff of runoff

Peak Flow entering tank

Therefore Peak Flow entering tank

242 sq.m.
252 mm/hr
0.95
C*1*A/3600
= 16.1 Litres/sec

2.67 x Time of Concentration

(Note: Pipes entering the tank are designed for the above intensity. All flows in excess of this will be bypassed to O’Land Flow

or other pipework)

(However it is still necessary to produce the required reduction in peak flow for the maximum event shown above)

Outflow Hydrograph (from storage device)

Soil Permeability

0 miday
0.000 mm/sec

 

 

Absorption Area = 0 sq.m
Therefore absorption = 0.000 U/sec
Outlet Device
O'Flow device weir/pipe (W/P) Pp
Outlet Pipe dia 70 mm
Outlet Pipe length = 4 m
Outlet Pipe grade 1:? = 100
Try Storage Length = 2 m.
Storage width = 1000 mm
Available storage depth below Pipe outlet IL = 0.0 mm
Therefore Storage Vol below o'flow device = 0 Litres
{includes vol stored in absorption trench)
Storage Area above O'Flow = Sq.m.
Void Ratio = 1
RESULTS
Max Inflow = 16.1 (L/sec) Max depth over weir/oflow IL 950 (mm)
Max Outflow = 10.1 (L/sec) Area of storage above weir/Oflow IL 2 sq.m
Reduction = 6.0 (Lisec) Therefore Vol aboveOFlow IL 1.90 cu.m
Required Reduction= 49 (L/sec) Vol below oflow IL (from above) 0.0 cu.m
Therefore OK Therefore Total storage vol. 1.90 cum
therefore Total Storage depth 950 mm

 

 

Page 19

Stormwater Hydrograph through Tank

 

 

 

 

 

 

 

 

 

 

_ 4
_|e-+-- No Detention |
— with Detention |

Flow (Litr

 

 

 

 

 

10 12 14 16 18 20

Time (mins)

Method:
Total inflow in litres = total outflow + storage (over any given time period)
Total outflow Amount over weir + amount absorbed

Total storage Static storage below the overflow + dynamic storage above the overflow

(Any storage utilised in a gravel bed is adjusted for the void ratio.)

Storage above the weir, and flow over the weir, are dependant on the depth above the weir, or outlet pipe IL.

All variables in the above equation are known except the depth above the weir or o'flow device.

To avoid intergration of the above formulas, time increments are used to solve for depth.

The time increment used is 0.1mins. These increments are hidden on the spreadsheet below to save space.
Flow increments are progressively added to produce the result.

Any difference between the final output volume and the input vol is approximately the amount still held in storage.
This storage is gradually absorbed, or used for irrigation between rainfall events or run out, or slow leaked out.

If the tank outlet is a weir, the weir formula is used to calculate the depth of water in the tank

If the tank outlet is a pipe, a pipe ‘part flow’ formula is used for all tank depths up to the pipe obvert level.

As the water depth in the tank rises, the pipe is then checked for both an orifice and pipe flow (manning) formula.
The formula that gives the most restriction to the flow, is the one selected.

This is then used to calculate the depth of water in the tank, or other storage device.

Sometimes a slight wobble can be seen in the curve where the transitions between formulas occur.

The tank water level is also adjusted for exit losses equating to 1.5V“2/(2g)

 

 

 

 

 

 

 

 

 

| Depth of water in tank above outlet IL
| 1000.0 | 7
a Z. |
§ 800.0 + —F
£ 600.0 }——--—f— —- — —\——|
3 400.0 + -—___, | ————_—- ——\— | -———_—
8 1 C
200.0 |—— _ A —___—_-—_- —> ——— +. -—— ——.
0.0 - |
0 5 10 15 20 25

Time mins

 

Page 20

 

 

 

Inflow in previous Cumulative Depth over Outflow thru Cumulative
Time 0.1min inc. Inflow weir/orifice Over flow Outflow
mins Us Litres om UL/sec Litres
oO O 0 0.0 0.0 0
0.5 1.61 24 10.0 0.3 4
1 3.22 97 30.0 0.8 20
1.5 4.83 217 70.0 2.2 68
2 6.44 386 110.0 3.0 152
2.5 8.05 603 170.0 4.0 260
3 9.66 869 230.0 47 393
3.5 11.27 1183 310.0 5.6 551
4 12.87 1545 400.0 6.4 733
4.5 14.48 1955 500.0 7.2 939
5 16.09 2414 620.0 8.1 1169
5.5 15.13 2882 720.0 8.7 1423
6 14.17 3322 810.0 9.3 1694
6.5 13.20 3732 870.0 9.6 1979
7 12.24 4414 920.0 9.9 2272
75 411.27 4467 940.0 10.0 2571
8 10.31 4790 950.0 10.1 2873
8.5 9.35 5085 950.0 10.1 3175
9 8.38 5351 930.0 10.0 3475
9.5 7A2 5588 900.0 9.8 3771
10 6.46 5796 860.0 96 4062
10.5 5.49 5976 810.0 9.3 4343
11 4.53 6126 750.0 8.9 4615
11.5 3.57 6247 680.0 8.5 4875
12 2.60 6340 600.0 79 5120
12.5 1.64 6403 520.0 74 5349
13 0.67 6438 440.0 6.7 5559
13.5 0.00 6445 350.0 6.0 5746
14 0.00 6445 260.0 5.1 5908
14.5 0.00 6445 190.0 4.2 6047
15 0.00 6445 140.0 3.5 6162
15.5 0.00 6445 111.7 2.8 6253
16 0.00 6445 60.0 1.8 6317
16.5 0.00 6445 40.0 11 6357
17 0.00 6445 30.0 0.8 6383
47.5 0.00 6445 20.0 05 6398
18 0.00 6445 10.0 0.3 6410
18.5 0.00 6445 10.0 0.3 6418
19 0.00 6445 0.0 0.1 6425
19.5 0.00 6445 0.0 0.1 6428
20 0.00 6445 0.0 0.1 6431

 

 

 

 

 

 

Note 0.1min. time increments are used but hidden to save space

Reinhold Koenning
Msc PhD MIiEAust RPEQ.

 

Page 21

 

‘C4 Construction Hydraulic m

Building Service Engineers

 

Calculation of Stormwater Runoff and Detention Requirements for: PO Box 1176 Buddina 4575
Project: 5 BLUEFIN COURT

Ref: 1874 Date: 11/04/08

Calculate increase in peak flow due to extra impervious area

Predevelopment Case

 

Maximum event = Q100

time of Concentration = 5 mins
Intensity (1) = 326 mm/hr
Existing site area (A) = 606 sq.m

Calc coeff of runoff
From QUDM Table 5.04.2
for Q10 intensity

200.00 mm/hr

With fraction impervious = 0.00
Interpolating C10 = 0.70
From table §.04.3
frequency factor Q100 = 1.20
Therefore Coefficient of runoff for grassed site Q100 = 0.84
Peak runoff for predeveloped catchm = Coeff of R * Intensity * Area / 3600 L/sec
= 46 Us
Post Development Case
a) New Impervious Catchment Area = 340 sq.m
Coeff of Runoff = 4
Intensity as before = 326 mm/hr
Therefore peak Runoff = Coeff of R * Intensity * Area / 3600
= 31 Lis
b) New Pervious area = Total site Area - new impervious area
= 266 sq.m
Coeff of runoff as before 0.84

326.00 mm/hr
Coeff of R * Intensity * Area / 3600
20 L/s

Intensity as before
Therefore peak Runoff

Total Peak runoff post development case runoff pervious + runoff impervious

51 Lis

Difference in peak flow Runoff due to development

Peak runoff post dev - Peak runoff pre dev.
= 5 Lis
Therefore Required reduction in peak flow for Maximum event
difference in peak flow between developed and undeveloped areas : 5 Us

Page 22

 

Detention tank design
From Urban Road design Manual Vol (10-7080)

For small catchments hydrograph may be approximated as folls:-

Use triangular shape with duration

Actual catchment area entering tank from proposed site

Pipe rainfall design intensity entering tank Q20

Weighted Coeff of runoff
Peak Flow entering tank
Therefore Peak Flow entering tank

iow

2.67 x Time of Concentration

242 sq.m.
252 mmfhr
0.95

C*1*A/3600

16.1 Litres/sec

(Note: Pipes entering the tank are designed for the above intensity. All flows in excess of this will be bypassed to O'Land Flow

or other pipework)

(However it is still necessary to produce the required reduction in peak flow for the maximum event shown above)

Outflow Hydrograph (from storage device)

 

Soil Permeability = 0 miday
= 0.000 mm/sec
Absorption Area = 0 sq.m
Therefore absorption = 0.000 Lisec
Outlet Device
O'Flow device weir/pipe (W/P) = p
Outlet Pipe dia = 70 mm
Outlet Pipe length = 1 m
Outlet Pipe grade 1:? = 100
Try Storage Length = 2 m.
Storage width = 1000 mm
Available storage depth below Pipe outiet IL = 0.0 mm
Therefore Storage Vol below o'flow device = 0 Litres
(includes vol stored in absorption trench)
Storage Area above O'Flow = 2 Sq.m.
Void Ratio = 1
RESULTS
Max Inflow == 16.1 (Lisec) Max depth over weir/oflow IL 950 (mm)
Max Outflow = 10.1 {L’sec) Area of storage above weir/Oflow IL 2 sq.m
Reduction == 6.0 (L/sec) Therefore Vol aboveOFlow IL 1.90 cum
Required Reduction= 49 (L/sec) Vol below oflow IL (from above) 0.0 cu.m
Therefore OK Therefore Total storage vol. 1.90 culm
therefore Total Storage depth 950 mm

 

 

Page 23

siset

Flow (Litr

Stormwater Hydrograph through Tank

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

18

is we wrt No Detention

12 = ~ +3 | ——— With Detention

40 + 2 a

8 san +

6 ~——— — -

4 — a —o
0 2 4 6 8 10 12 14 16 18 20

Time (mins)

Method:

Total inflow in litres = total outflow + storage (over any given time period)

Total outflow = Amount over weir + amount absorbed

Total storage = Static storage below the overflow + dynamic storage above the overflow

(Any storage utilised in a gravel bed is adjusted for the void ratio.)
Storage above the weir, and flow over the weir, are dependant on the depth above the weir, or outlet pipe IL.
All variables in the above equation are known except the depth above the weir or o’flow device.
To avoid intergration of the above formulas, time increments are used to solve for depth.
The time increment used is 0.1mins. These increments are hidden on the spreadsheet below to save space.
Flow increments are progressively added to produce the result.
Any difference between the final output volume and the input vol is approximately the amount still held in storage.
This storage is gradually absorbed, or used for irrigation between rainfall events or run out, or slow leaked out.

if the tank outlet is a weir, the weir formula is used to calculate the depth of water in the tank

if the tank outlet is a pipe, a pipe ‘part flow' formula is used for all tank depths up to the pipe obvert level.

As the water depth in the tank rises, the pipe is then checked for both an orifice and pipe flow (manning) formula.
The formula that gives the most restriction to the flow, is the one selected.

This is then used to calculate the depth of water in the tank, or other storage device.

Sometimes a slight wobble can be seen in the curve where the transitions between formulas occur.

The tank water level is also adjusted for exit losses equating to 1.5V42/(2g9)

 

Depth of water in tank above outlet IL

1000.0

800.0 Vain

600.0 \
X

400.0 —+
200.0 YA \

0.0

 

 

 

 

Depth mm

 

 

 

 

 

 

 

 

0 5 10 15 20 25
Time mins

 

Page 24

 

 

 

 

 

 

 

 

Inflow in previous Cumulative Oepth over Outflow thru Cumulative
Time 0.1min inc. Inflow weir/orifice Over flow Outflow
mins Us Litres mm Usec Litres
0 0 0 0.0 0.0 0
0.5 1.61 24 10.0 0.3 4
1 3.22 97 30.0 0.8 20
1.5 4.83 217 70.0 2.2 68
2 6.44 386 110.0 3.0 152
2.5 8.05 603 170.0 4.0 260
3 9.66 869 230.0 47 393
3.5 11.27 1183 310.0 5.6 551
4 12.87 1845 400.0 6.4 733
45 14.48 1955 500.0 7.2 939
5 16.09 2414 620.0 8.1 1169
5.5 16.13 2882 720.0 8.7 1423
6 14.17 3322 810.0 9.3 1694
6.5 13.20 3732 870.0 9.6 1979
7 12.24 4414 920.0 9.9 2272
7.5 11.27 4467 940.0 10.0 2571
8 10.34 4790 950.0 10.4 2873
8.5 9.35 5085 950.0 10.1 3175
9 8.38 5351 930.0 10.0 3475
9.5 742 5588 900.0 9.8 3771
10 6.46 5796 860.0 9.6 4062
10.5 5.49 5976 810.0 9.3 4343
41 4.53 6126 750.0 89 4615
11.6 3.57 6247 680.0 8.5 4875
12 2.60 6340 600.0 7.9 5120
12.5 1.64 6403 520.0 74 5349
13 0.67 6438 440.0 67 5559
13.5 0.00 6445 350.0 6.0 5746
14 0.00 6445 260.0 5.1 5908
14.5 0.00 6445 190.0 4.2 6047
16 0.00 6445 140.0 3.5 6162
15.5 0.00 6445 411.7 2.8 6253
16 0.00 6445 60.0 1.8 6317
16.5 0.00 6445 40.0 41 6357
17 0.00 6445 30.0 0.8 6383
17.5 0.00 6445 20.0 0.5 6398
18 0.00 6445 10.0 0.3 6410
18.5 0,00 6445 10.0 0.3 6418
19 0.00 6445 0.0 0.1 6425
19.5 0.00 6445 0.0 0.1 6428
20 0.00 6445 0.0 0.1 6431

 

I

Note 0.1min. time increments are used but hidden to save space

Reinhold Koenning
Msc PhD MIEAust RPEQ.

 

Page 25

 

 

Construction Hydraulic

a

Building Service Engineers

 

Calculation of Stormwater Runoff and Detention Requirements for:
Project: 5 BLUEFIN COURT
Ref: 1874 Date: 11/04/08
Calculate increase in peak flow due to extra impervious area
Predevelopment Case
Maximum event
time of Concentration
Intensity (1)
Existing site area (A)
Calc coeff of runoff
From QUDM Table 5.04.2
for Q10 intensity
With fraction impervious
Interpolating c10
From table 5.04.3
frequency factor Q100
Therefore Coefficient of runoff for grassed site Q100

 

Peak runoff for predeveloped catchm

Post Development Case
a) New Impervious Catchment Area
Coeff of Runoff
Intensity as before
Therefore peak Runoff

b) New Pervious area
Coeff of runoff as before

Intensity as before
Therefore peak Runoff

Total Peak runoff post development case
Difference in peak flow Runoff due to development

Therefore Required reduction in peak flow for Maximum event
r difference in peak flow between developed and undeveloped areas

aot

unrnnnnonnoun

PO Box 1176 Buddina 4575

Q100
§ mins
326 mm/hr
606 sq.m

200.00 mm/hr
0.00
0.70

4.20
0.84

Coeff of R * intensity * Area /3600 L/sec
46 Lis

340 sq.m
1
326 mm/hr
Coeff of R * Intensity * Area / 3600
31 Ls
Total site Area - new impervious area
266 sq.m
0.84
326.00 mm/hr
Coeff of R * Intensity * Area / 3600
20 Ls

runoff pervious + runoff impervious
51 Us
Peak runoff post dev - Peak runoff pre dev.

5 Lis

5 Us

Page 26

Detention tank design

From Urban Road design Manual Vol (10-7080)

For small catchments hydrograph may be approximated as folls:-
Use triangular shape with duration 2.67 x Time of Concentration
Actual catchment area entering tank from proposed site 242 sq.m.

Pipe rainfall design intensity entering tank Q20 = 252 mm/hr
Weighted Coeff of runoff = 0.95
Peak Flow entering tank =C‘*1*A/3600

Therefore Peak Fiow entering tank 16.1 Litres/sec

(Note: Pipes entering the tank are designed for the above intensity. Ail flows in excess of this will be bypassed to O'Land Flow
or other pipework)

(However it is still necessary to produce the required reduction in peak flow for the maximum event shown above)

Outflow Hydrograph (from storage device)

 

 

Soil Permeability = 0 miday
= 0.000 mm/sec
Absorption Area = 0 sq.m
Therefore absorption = 0.000 Lisec
Outlet Device
O'Flow device weir/pipe (W/P) = p
Outlet Pipe dia = 70 mm
Outlet Pipe length = 1 m
Outlet Pipe grade 1:? = 100
Try Storage Length = 2 m.
Storage width = 1000 mm
Available storage depth below Pipe outlet IL = 0.0 mm
Therefore Storage Vol below o'flow device = 0 Litres
{Includes vol stored in absorption trench)
Storage Area above O'Flow = 2 Sq.m.
Void Ratio = 4
RESULTS
Max Inflow = = 16.1 (L/sec) Max depth over weir/oflow IL 950 (mm)
Max Outflow = 10.1 (Usec) Area of storage above weir/Oftow IL 2 sq.m
Reduction = 6.0 (U/sec) Therefore Vol aboveOFlow IL. 1.90 cum
Required Reduction= 49 (L/sec) Vol below oflow IL (from above) 0.0 cum
Therefore OK Therefore Total storage vol. 1.90 cum
therefore Total Storage depth 950 mm

 

 

Page 27

Flow (Litres/sec)

Stormwater Hydrograph through Tank

 

18
i: No Detention
12 —— With Detention |
10
8
6
4
2
0
0 2 4 6 8 10 12 14 16 18 20

Time (mins)

Method:

Total inflow in litres = total outflow + storage (over any given time period)

Total outflow = Amount over weir + amount absorbed

Total storage = Static storage below the overflow + dynamic storage above the overflow

(Any storage utilised in a gravel bed is adjusted for the void ratio.)
Storage above the weir, and flow over the weir, are dependant on the depth above the weir, or outlet pipe IL.
All variables in the above equation are known except the depth above the weir or o'flow device.
To avoid Intergration of the above formulas, time increments are used to solve for depth.
The time increment used is 0.1mins. These increments are hidden on the spreadsheet below to save space.
Flow increments are progressively added to produce the result.
Any difference between the final output volume and the input vol is approximately the amount still held in storage.
This storage is gradually absorbed, or used for irrigation between rainfall events or run out, or slow leaked out.

If the tank outlet is a weir, the weir formula is used to calculate the depth of water in the tank

If the tank outlet is a pipe, a pipe ‘part flow’ formula is used for all tank depths up to the pipe obvert level.

As the water depth in the tank rises, the pipe is then checked for both an orifice and pipe flow (manning) formula.
The formula that gives the most restriction to the flow, is the one selected.

This is then used to calculate the depth of water in the tank, or other storage device.

Sometimes a slight wobble can be seen in the curve where the transitions between formulas occur.

The tank water level is also adjusted for exit losses equating to 1.5V*2/(2g)

 

Depth of water in tank above outlet IL

1000.0

800.0 >

 

 

 

 

 

 

 

 

 

 

 

 

E
E 600.0 :
£ \ —— [email protected] —_——
a \

200.0

0.0
0 5 10 15 20 25

Time mins

 

 

Page 28

 

 

 

Inflow in previous} Cumulative Depth over Outflow thru Cumulative
Time 0.1min inc. Inflow weir/orifice Over flow Outflow
mins Us Litres mm Lisec Litres
0 0 Oo 0.0 0.0 0
0.5 1.61 24 10.0 0.3 4
1 3.22 97 30.0 0.8 20
1.5 4.83 217 70.0 2.2 68
2 6.44 386 110.0 3.0 162
2.5 8.05 603 170.0 4.0 260
3 9.66 869 230.0 47 393
3.6 11.27 1183 310.0 5.6 561
4 12.87 1545 400.0 6.4 733
45 14.48 1955 500.0 7.2 939
5 16.09 2414 620.0 8.1 1169
5.5 46.13 2882 720.0 8.7 1423
6 14.17 3322 810.0 9.3 1694
6.5 13.20 3732 870.0 9.6 1979
7 12.24 4114 920.0 9.9 2272
75 11.27 4467 340.0 10.0 2571
8 10.31 4790 950.0 10.1 2873
8.5 9.35 5085 950.0 10.1 3175
9 8.38 §351 930.0 10.0 3475
95 7.42 5588 900.0 9.8 3771
10 6.46 5796 860.0 9.6 4062
10.5 5.49 $976 810.0 9.3 4343
11 4.53 6126 750.0 8.9 4615
41.5 3.57 6247 680.0 8.5 4875
12 2.60 6340 600.0 79 5120
12.5 1.64 6403 520.0 TA 5349
13 0.67 6438 440.0 6.7 5559
13.5 0.00 6445 350.0 6.0 5746
14 0,00 6445 260.0 5.1 5908
14.5 0.00 6445 190.0 4.2 6047
15 0.00 6445 140.0 3.5 6162
16.5 0.00 6445 111.7 2.8 6253
16 0.00 6445 60.0 1.8 6317
16.5 0.00 6445 40.0 1.1 6357
17 0.00 6445 30.0 0.8 6383
17.5 0.00 6445 20.0 0.5 6398
18 0.00 6445 10.0 0.3 6410
18.5 0.00 6445 10.0 0.3 6418
19 0.00 6445 0.0 0.1 6425
19.5 0.00 6445 0.0 0.1 6428
20 0,00 6445 0.0 0.1 6431

 

 

 

 

 

 

Note 0.1min. time increments are used but hidden to save space

Reinhold Koenning
Msc PhD MIEAust RPEQ.

 

Page 29

 

-@- e
BLUEFIN COURT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

& . 7
“a N Sey ee
A 2, nn 9 gkag
s S—z7,8 NZ oem run _ es vs bee
& Ly SS : Ze. sone
vs be eS eel
g Ge 2 rT, _
- ; (| gage Legg ) pete
3 = S 2 Ed w ae am
5 22m z* a8
a} | Beare
kanmmemen 1" i, [SE
ee 54 Het Hy ee m fe 5
Aauatir ea | °
ctf BE peigttly ed i |
a8 fae gis if K [E “a 3
i ey i tall f Rt Z
aif & eb raged N 8 a
aisha aed %% Ly ies
up UF Hy ( n 25
e, = 3h E A, | K 38
mb of q 3 o i Be
F hm ® ® N) B q
3. z § ORS
a3) Ny i mC Se
£238 8 a ®
ne sete ee | $ : N
HOHE p
HELE at — |i
HEE eae Ge || %
eee EL
sul al afte % 5
Pea nab | g
tt z HE frighs He 3 | i
af 2 ' iit i fait > a meee z
R i
; . a \ Sp <2 @ of. 8
i: ili! i lige) 480°01'20" oor
ie it bate } NEW BLOCK BOUNDARY WALL (REFER SECTION) 20.00
leita
anal | REEF STREET
: g cal & ih i
a8 : 2

 

 

 

 

TOVLS OLN] COC CGRNE
ONY SDUS OL XY NAL
STS 2BaVI-039 (4006

 

 

 

 

“g00Z indy -a1eG

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

* 4ay |}MO-G60BE “ON 6g

 

 

  

 

= sass <
"5 # ser Fly st88 2
; weele sd gait 5 7
450 f Hi Bre
"Footing Beat - Bie pal
y
ve x. . RP Boundary. 3 - =
Pia] se BEF = iS sn a
8/2/23 lead 2 g a ———| §
8g 32 #(Sd ® as . =
zo}o| £2 228/13 = ‘| 600 z
On| 5] an 8 z Bs yy
On) @| 29 PBR 1S o . € 3
o~ aa) Beelm |, 2 4 Ld
Bal S| Sz) Belo | Bs
29|2/5| 3/3 6 Be -
n3,| 2 é 25 \55 ez ag 8 = g2
412) "| 2 |r Sipe aly Bez] 35
eo, . S). BR o = o6R a
5/8| 28| 92/2) 3. geg at 88 ae2| £8
8) 392] gz /= 1S” “s548 $2 ae
vl te] S81 7S a 3 a
Sl yh] Bel Ve 3
=| g0) 2? ‘Ir
ae a 3
a § > £
1 @| is

 

 

 

 

 

 

 

 

 

 

Page 30

 

 

 

AVPRAULIG SEGNIGES

 

‘5 BLUEFIN COURT
NOOSAVILLE

FOR

VYNARA P/L

GENERAL NOTES
Woter Supply ond Sonitory Drainage hax been designed ond sholl be
accordance with the O'M Standard Sawarage i

            

    

 

proceeding wit Die, work

Contactar chat verity ef future tocatians, Invert levels, eurtoce
Corer to pipes ore correct ond abtalnstie prior to commence
Fra moct bealon of existing, and proposed earvices, anal! be veriied with
the felavant Authority. er oUier trodes ax applicable.

Fue slop colors to be uted of af plastic pipework penetrating Gre resistant
conatruction.

SANITARY ORAINAGE

Undergrouna pipework shall be 100 dia. PVC OMV, min grade 1:60 UNO.
Suspended Piperort sho ba PYC ctoss OW, .
Trode woste pipework a gracue Yop suspended sholi be “Coesprene” or
MOPE. Underground shot ba vitreous choy or HOPE.

Trade waste pipeser to od wepavotor eholl be HOPE, or Vitreous clay with
itrle™ eubber rings.

CLeonouls or inapaction openings brought to surtoce in poved af concrate
Greos, of wkhin buildings to have Bross cape.

STORMWATER DRAINAGE
ipework shall De 100 dio PVC clase SW min grode 1:10 ULN.O.
‘ba 100 io sw.
Rainwoter (RW) ond pl
wilh membrane clamp whare required,

        

 

BACKFLOW PREVENTION
Provide hoee connection vacuum breckers to oll hose cocks
Provide RPZD to any irrigation connections.

. medium guty UND.
nceete fof light uty.
pattern.

  

GRATINGS

Grotings for storm wotar to be “foston, Gate” ar oper juah,
Buty to match monutacturers recommendations tar loading condition.
Tench grate to be transverse bor,

Floor waate grotes to be chrome plated brass

 

 

 

LEGEND
le — tion potable woter .
=v — _Exating woter cos.
3 Ensting sane o
a Enitting storm woter a
1a — _Gisting rouse arvin es
———— Sanitary Oreinoge s.
wa---=- Vent Pipe w
SH -— Cold Water py
aoe = Hol woter fe
== Storm Watar Drainage oe
—oneeeece Fire fc
ie gi Drain my
“ 19 Pre FR
Om Cold Water Riser Hig
@— oom Poe a
Onn Gin Gy Bn wae
@— wn Pie co ee
Hat woter
Group vent CB House connection branch
Oo Sn e eae
¢ = w level
@) duct vent © Unepaction Chamber
Hot water ise “ trwert Gavel
i 3 \—Firw Oroppsr io lempaction opening
ies Inepection Opening to Surface
© re mer tic kee Crornel
‘ ux Manhole
@— Non potable river sev an airs woh
‘box
== ster meter ay e PO iti
vo vo Fo, ante "outa °
Tae ct Bo Ss heey oe
om teenie wie ED seen a, Toe ae
Sener en Enlarger Ren Rain water head
x Sontery Drainoge
® ORG Overflow Relief Gully = Sutece Level
are
fo « x, Eke
‘Giesat Sw Storm water deoia
ite —_Troppad Tund’en
fy * G Test gate
ts Tonal to ber
Clo tanty Bry Trench grote tronavern
ao ue Hop are ote gaint bo
Meshing TAN, Thermostatic mining vole
Fm Machine wy, Tempering wave
Foor waste « Underground
@ Fee Saar Mew a Unger a
une. ya noted othereise
S Gn Gavin ws ‘Woler supply
or
She Shomer
EX FWR Five Hone Rael oO hws Hol water eystem
Gs omms

   

  

 

 

 

 

 

 

 

 

 

 

Lot 2 on RP906911

DRAWINGS

1875-1
1875-2
1875-3
1875-4
1875-5

  

COVER SHEET . GENERAL NOTES & LEGEND .

GROUND HYDRAULIC SERVICES

LEVEL 1 HYDRAULIC SERVICES
STORMWATER OPERATIONAL. WORKS
SEDIMENT & EROSION CONTROL PLAN

Pollution Control Management Plan _(PCMP):
1. To be responsibil
2. To fist all in flo
at OP's and oth
3;-To -keep—and-~maintain -a—log: of cleaning
. To clean devices including 4

of Management

ring devices like leaf eaters
rs

rat flush storage tank

—as to manufactures specification
-minimum quorterly, but monthly in rainy seasen
-ofter each major rainfall event

 

. To inspect and clean tanks minimum once yearly
. To install ond maintain pump and fixtures for .
reuse/watering/irrigation as to manufactures specification

 

 

 

 

 

 

 

 

 

 

 

 

|
uit
z

 

 

 

 

 

I
i

 

 

 

 

i
im

 

 

 

 

 

q—
ij wee eh ee ee te terete

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Site 606m"
Roof. 242m*
Driveway 98m*
Landscape 266m*
New impervious 340m?
CATCHMENT AREAS

Note:
Do not scale from these drawings.
Do not rely on these drowings for
Glignment and tevels of all existing

 

 

 

 

 

 

   

 

   

itis tne bl ti f thi tra
is the obligation of! ¢ contractor. : MieAsst
and/or plumbing contractor to survey commer: Reinhold Koenning fren We 70253
all existing services prior to Budding OLD 4575
construction nak reconkyd.core me Aaa oes
aor: = ~
VYRARA P/L
pt
SROMTERT =
GREG GIBBS ARCHITECTS
Note; PRoect: PROPOSED DEVELOPMENT
All kitchen, laundry & bathroom fittings and toilets 5 BLUEFIN COURT
te comply with the AAA Woter Conservation Rating NOOSAVILLE

 

System as defined by AS/NZS6400. ORAM TITLE:

Provide flow restrictor valves where necessary

to taps and shower roses. The fiow shall not COVER SHEET

exceed a moximum of SL/min

LEGEND

GENERAL NOTES &

 

cI [mw [on 08,

 

 

 

UU pour  $:100 mmasuxa{t % S$

4

 

(RPD:- Lot 2 on RP9OE911

 

Page 31

 

 

 

 

 

 

 

 

 

 

BACKWASH CONNECTION DETAIL
Seale 4:25

 

 

 

 

La eee----- +5

IFIMAS III

a

 

 

     

ALYNOD. NiSaINTVE

 

 

 

&
Provide stormmater harvesting ond detention
tank for each Unk,
Each tank to be cdowe eurface type Siiit LINE
with 0 total volume of 4800 Mree soch.
Veluma for harvesting: 4000 tres #ach
Wohuma for detesiion: 1000 fires each
Provide #50 niow ick ot eoch tank at depth eo
am to ensure 1000 Gtres to be drained of af
tienes, Refer detail

 

@ BM: SCREW IN KERB
RL: 1.99]

 

 

AMINE 1 Rp

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

   

 

 

rewie weionbe, path Dox.
master meter ly required ot (ora Desaripen oa
ie no common Une
FIXTURE = D0SCHARGE
PPE CHA.
ca =e
Bn 4
fF ‘She 3a
foo
sae x BB
¢ Bee B
ita re uno
10 urdat
ml
SZ we Valo sf VER
© ftp 2 O\ pee ORT
S [_—_—_—_—_—_—_
20) commact: Reinhold Koenning stiust RPED No 7023
PO Bax 1176
Si} | eB of. a Be oe rs su as
sresontyisun ox. bane 0224
CUENT +
cmc eee sone — VYNARA P/L
Cound drowing SIBTA ft ff a ag ee ee
Sas sonstnaction a ARCHSTECT +
GREG GIBBS ARCHITECTS
e ‘provect: PROPOSED DEVELOPMENT
5S BLUEFIN COURT
NOOSAVILLE
ate ee en eo ah er rh eo a ma 9 mw ann 9 mm se = Ee mn mr rs ‘ORANG TITLE:
iz
r4 GROUND
1Z HYDRAUUC SERVICES
| oe
2
WATER SUPPLY M4 =
1874-2

 

 

 

 

[RPO:- Lot 2 on RP9DE911

 

Page 32

 

 

 

 

 

 

 

 

 

nme a

 

 

 

 

 

 

 

 

i
mw

rere 9
pf Lo

 

 

 

 

 

 

zygsesees
q

gouesgese

ie

 

 

 

eis ois a
eis ie

 

 

 

 

 

 

 

 

 

 

 

 

 

 

     

 

 

 

 

 

 

 

 

aK Wt TASTE
iE qd - Lely
ePi] 38 "sola 3 ft le
ele sP BEST o | 2 [
ate Eso] 8 | ~
RIE FF . heel B > > '
S[-Fl 6B 2s/%
21h S 46] 2
“(sh 8 | ga r
ai a7]
L | Z£>
|__| Sg 3] ;
L ° ls

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 33

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

29,
$ 5 ONO!

 

 

 

 

 

 

2
| | 20)
| | 3
| ait
Po} ga :
| s 3
a 2
| Q i in)
| © ‘ =)
| 2a | Ca for cnen tees STD one Setention
| =I ces er cer sen ore SO
| i Nouns for Getandont 1600 Huse sock”
Provide #50 slow look ot scch tank ct depth so
| a ge te eras 3000 Gren to be drcined ot
7 @ BM: SCREW IN KERB fi
| Ri: 19q |
| | yi
| ne fo, RAC. sat Fe r _
| al| isghe
z
| we ae is
3
>
>

 

 

 

 

| pons cen ec
2 See

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Overfiow

 

 

 

 

 

 

 

 

 

 

 

 

Total tank valum:
4,800 litres

 

 

 

 

 

 

 

 

 

GREG GIBBS ARCHITECTS

pRaecT: PROPOSED DEVELOPMENT
5 BLUEFIN COURT
NOOSAVILLE

os DRAWING TITLE:

vas —)) STORMWATER ‘

  
  

 

 

 

Sa he

 

 

 

 

 

 

 

 

 

 

 

 

:
!

 

 

 

 

OPERATIONAL WORKS

 

 

nae RK [omen] ee ino me
Kaew + 4:100 cratuna| +? 8 | 1874-4 J
(RPD:- Lot 2 on RP906911

 

 

 

 

 

 

 

Page 34

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

N GARAGE
| af 90°01'20" glock Was
J rey e %S
2 ! IO30 8 aS
1
| i
> iI
iy
| f
1
2 i! Prior to the commencment of any construction activites the following meeeures
| VW ! ‘shail be incorporated:
!
> \
2 it | © Provide education of site personnel
Al ° © Set up action plane as a precaution in case of disturbances ocouring
2 al! eapecially after an unexpected atrong rainfall event
a} © Provide regular Inepaction end maintenance of al structures Including the
\1 j Rey TS, eee
> . i |
ty
| : o
3 1
I
| LPG | 2
HP | reruns rua 2 ¥
i
2 I~
Ul 2
2 tt ti | 6m?
| 1 | bt 60
tl
» it [,
vet
Rit
| Ho |
| | /
| ut -| /@ /
> i o /
| i =
i « w
; HOW &
Vt f
it /
] i Pater rt es /
ter
| @ 6M: SCREW IN KERB ot «| /
4 RL: 1.90 I | /
'
| it S /
v o7
| ; it NI Ye 980,30
2 —al®
| gi) tans BLOCK WATE 270°01'20"
a ' '
| Fed ae 4 GARAGE
. ! '
ENERAL NOTES _ oe 2 LEGEND
Satpal be ec th spn fee Yo dahon bate ———— Storm Woter Drainage
Erceciat chal verly Gf frture locations, invart vals, surtoce bevels, and —-7— Aol Orn
feo exact boston of stating, ond. proponed serves wal be" varied ety
‘the relevant Authority, or ether trades ¢4 applicable Down Pipe
LORNA OANA, cn gue 11, ©
Downplpes be 100 Oko PVC class Sw, wees — aan Excentrte eniarger
COVERS & FRAMES © rec Hegre Woste
Gorwa Wr forge race to be G00 oq bil to match pov pelle ' Bt Oty rt
Covers in Sroan {2 be a for Bovad_prace wih Brees 0g *
Cencrete tif covers to be wtsmped “SW of "SEW" cx ane — Sediment Farce
Covers & Fremes to be “Fuston’ of equol approwed.
GRATINGS . . = sediment borer
Seats er storm wear to be “font, Solo equal. ;
HPSS GRC pene woe cere pt re ie Sees
Uo eenate artes may be PMC. fr oe a
sqrt ene Se
(i etnered se Kec KES & Choral
(0 control, Flow should be dhverted around ware - Manhole
13) At Tetncoas" Salen “Sed tedorent contra (p bo'hutaed end’ be operetlne! bafars commenting upslope FO, Blntar outet
c) AE cowl macmares to be iapected ot leant wekty and ster significant nmott terme, fro Baal Property cescplon
Controt macaures moy ba removed when on-site erosion le controlled and 70% soll oO Rain water outiet
ccyvaroge te obtained over oll upstream daturbed hand. ier fan, soter eos
2. Sedenent Fence So Se ser oan
{<) Ure wows fotrice TQ Tench grate trnmrare, ba
JEST SSE oe som meals . Sea
{8} nea”= cont'er spray un may bevrequies Guay wet wa teers
the, Uniese noted otherwton

 

ALTERNATIVE 2
‘SEDIMENT TRAP

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

VYNARA P/L
ARCHITECT

5 BLUEFIN COURT
NOOSAVILLE

 

 

GREG GIBBS ARCHITECTS

PROECT: PROPOSED DEVELOPMENT

PH: 5444 8645
Pk: S448 8226

 

ORANING THLE:

SEDIMENT &
EROSION CONTROL
PLAN

i

 

 

 

 

sews |tem-s |

>

 

{ReD:— Lot 2 on RPS06911

 

 

 

Page 35

 

 

COURT

BLUEFIN

DRIVEWAY CROSS OVER DETAILS
TO BE IN ACCORDANCE WITH
NOOSA SHIRE COUNCIL'S STD
DRAWINGS 9005 & 9019.

SITE DRAINAGE ~ CONSTRUCTION

ENSURE GROUND PROFILE DURING CONSTRUCTION
FALLS TOWARDS THE CENTRE OF THE ALLOTMENT
THEN TOWARDS THE ROAD FRONTAGE WHERE RUNOFF

WILL DRAIN THROUGH THE SILT FENCES. IN NO
INSTANCE SHALL THE ALLOTMENT ORAIN INTO
NEIGHBOURING ALLOTMENTS.

 

   

‘DOCUMENTATION

ORAINAGE OF NEIGHBOURING PROPERTIES IN

ACCORDANCE WITH HYDRAULICS CONSULTANTS

 

 

900(W) GEO-FABRIC SLT
FENCE, FIXED TO SPKES AND
BURIED 300 INTO STABLE
GROUND.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Revision | Description

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

: xe 90°01'20 NEW BLOCK BOUNDARY WALL (REFER SECTION)
ms z
Ny A > 1 30.30 a Wo IES
a se siT— — S Pp 1200(L) 50 Sq. Howo sees, \I-=ITI7|
: 1800 ctre DRIVE 600 INTO 4
UNE OF PROPOSED DRIVEWAY & GROUND.
= v
g
Ew
8 [ oad
3 Lu FENCE IL
s UNE OF PROPOSED DUPLEX .
a CREATE BUNDING IN Ro Lu
Zu TEMPORARY HAROSTAND She
s FOR DIVERISION INTO Sis YX
e | SILT FENCES. =
“” g
SI
Ke, % 2 2 2
H 4 oS 3 = = NO COMPATION EQUIPMENT
¥ 606m? a s VANI2 Top ADNACENT BOUNDARY WALL
5
WY eS s° 4 TT] cose
0 Ue ¥ ow é 190 Block - core filed bess
S 4 s ° NI2 bors @ 400 cir. PROWDE FULL HT.
é F.F.L. - RL 2.60m y = vert, 400 ctre hort ' MOVEMENT JONTS AT
eS Li, LZ 5 zZ = lop bors 500mm, »(y Bom CTRS
z Al cores cleared before | H =
pour via dean-out a
3 blocks, | Nc B
OQ
3 NN | > 5 Goroufo.
= Se ,
eB 2S : 20~40mm AGGREGATE a =~ Bi eg
HARD STAND OVERLAY = Le = = wih ogi pipe to
| | FoR DeLVERY's ouRIG = 5 |} =] outit.
3 s onsen Wy ele \ 150 Thk Heel SLB2
3/, z £ le | mesh top 40 cover.
2 % re] ft eo
5 S hy YX 1200 | 800 Noumionn Steel NS7a
g z S 800 | 600 cage (2/010 top,
Vv
500_| 200 300 8 4/10 bottom)
\ “y_UNE OF PROPOSED OUPLEX
FEM] pl oe J 30,30 4 SECTION ~ BLO
Se Ss s a SZ-Y +
2 ae NEW BLOCK BOUNDARY WALL (REFER SECTION) “ne < 270°01'20" o>
wy ie SITE PLAN — OPERATIONAL WORKS
NS ~ © Scale 1: 100
¥ >
NO
v CONSTRUCTION NOTES .
GENERAL: Fen te hs acped dato ol xpaie matt ont dt. .
4 Os nat see frm ths crow = he abd to be ol red iho vr tel un ae to eee ran be nprned nein Cope O .
3. Setting out dmensions are to be obtained from the architectural bars iain se re eee thes pa nn ad ts erored aezardance with ASZETO-1996 to achieve 0 minimum retative field density ue ha DRAWING?SIZE AQ
ene ‘ i Perth Said Penstremeter for 9 depth of 1.0m belog ext level. Copies = Site drohoge ond alt protection measures must be istoled prior to oN pee
wo 4 Any docrepances between these towing and the aitecird drovngs ‘of compaction test results shcB be presented to SOG Consiting Engineers eeu ee
" Fae approved. % - ~
imitactecctaemncer™ | Si Srararri aster sc NN es ane ed tp nee SUE FOR; APEROVAT
cceardance vid the ottched ofted depth Ene Goxyon. Engeers the clotmant i to be Gad to the speciied evel. to level. Any ocganle matter or debris is to be removed ond replaced sith be
FOOTPATHS AND DRIVEWAYS: ~ The 11 motered dean grr meri (Le. sand to 0 dey amd fr approves compacted moterik The subgrade sdk be prof ruled to a CONSULTING _ ENGINEERS
Essig to remo cecardence with S726) We ee Cee ea minimum of SB% dry densty as dxtamined by campacon testhg S sirucizval - elvil - geotechnical
Conti ae tl dept ke eomercd whies cantent of tess thn 12% (Rsteiy Wex ess than 25%, Urea shige of cvoardonce with ASI289 ABN 40 098-481 690.
‘exuding any Mhished 15%}. The proposed mated is inspected by SOS Consulting Engneers. 2 Pavement materids sho comply with the following main roads
LEGEND oy to Be 125mm ” ‘eciments Prior to ita removd to ensure fis compatabbty, Gepartment specification WS11.06 U1/11 PROJECT AVENUE, NOOSAVILLE QL0.4566

 

+ EXISTING SURFACE SPOT LEVELS.

tolerance +.0mm over 3.0m
oocordance with AS 1379 and AS 3600
to AS 1304, sid

LL
Ft

as a
be 10mm wide wet tocded with every

PRPAN OMAR Ee

Expansion jpints to wet mesh wre
it clang pint.

‘Qhe cocess point permitted for each dlotment.

For aurved driveways, reaxmum grades apply to inside edge of curve
40. AN services to be located and protected os required priar to work

— The fi Is to be ploced ond compocted in accordance with AS793-1996
to a level sufficient to achieve @ Level 1 certificotion with o minimum
redative fidd density of 95% Copies of compoction test results shal be
presented to SCG Conséting Engineers for approval,

= Filing ond campocting odjpeent existing structures is to be in strict

+ Areas where existing structures or teee cre removed shall be bockflled
‘with the approved fal moteridl compocted in accordance with AS2870-1996.
to ochieve o minimum relathe field density of 95%

~ Base course to consist of aggregate type 23, Grading B or C
aver id shall be extended o minimum of 150mm beyond the
a mhimom of 100mm thick UNO.

4. Bose ond sub-bose courses are to be compacted fr layers not
exceeding 150mm in thickness to achieve 95% dry density or greater with

i
i
i

   

 

 

 

 

Ph (07) 5455 5604

Fax (07) 5455 5696

 

Title:

OPERATIONAL WORKS PLAN.

 

Project Lot 2/5 Bluefin Court
NOOSAVILLE

 

Date: April 2008.

 

 

Drg No. 18095-OW1) *

 

 

 

Page 36

 

 

5 BLUEFIN COURT
NOOSAVILLE

FOR

VYNARA P/L

 

GENERAL NOTES
Water Supply and Sonitory Drainage hos been designed ond sholl be constructed in
ew indard Water Supply Low.

 
        
      

ITARY ORAINAGE
‘ground pipewort sholl be 100 dia, PE DWV, min grade 1:60 U.N.O.
.aded Pipewors shall ba PVC closa OW.
worta pipework to ‘wap suspended shall be “Coesprens” ar
Underground shal is clay or HOPE,

‘shall be HOPE, or Vitreous cloy with

          

 

t to surtoce in paves or concrete
brass cape,

 

STORMWATER DRAINAGE
Underground pipework 150 dio PVC clase SW min grade 1:100 UNO.
Downplpes shal be 100 Dio PVC close SW.

Rainwater outlets (RWO) ond plonter cutlets (PO) shal be “Cote Wade” or similor,
wilh membrane clomp where required,

WATER SUPPLY

be ot

              

ple ABS (acrylonitrit
may uns, (errors

‘max. length 3000 ev.

    

rac, shall be chrome pla
ac within tenancies, provide

 

BACKFLOW PREVE!

Provide hose connection vacuum bravkare to all howe cocks

 

           

 

 

 

 

Jn. medium duty UNO.
int [email protected] equal.
¢ keoding condition.

 

 

 

 

 

   

 

 

 

 

    

  

 

 

 

 

 

 

 

 

 

 

 

 

Se
a
Eley 0g
ee
eg 2
re, POOL TOP UP brigotion
® ne
o— i
S Hf ev Lev Lew ln
Om : cu
@-= me
Mce
@® ‘
Pee
g cm « inspection Chomber
£  imeeriet
® ie Inapection opening
® oo Inspection Opening ta Surface
Pic ERT acer
a ee ‘STORMWATER HARVESTING STRATEGY
@—— Bye vas
Ya ay pene
@ Te BO smitng wale
o- Pint ‘sala
re una
“ Be ie hoe co
fe, Realy se
— WO it
nee EwH
2
a ORG Overtion Reket Gully a
Water SLAs
Do we ‘Coset sw
cy =
oo ua Loundry tub
aug
*™  Moening
Progr mente
eo rw Re
Sb Borin Woler supp
es =
sre Shower
FLFR Fire Hove Reel HWS Hot water system
TED cs eases st Sy
to tomar

 

Lot 2 on RP906911

DRAWINGS

1875-1 -
1875-2 -
1875-3 -
1875-4 -
1875-5 -

To be responsibi
. To fist all in flow

 

ae ono

-as to manufactures spe:

—minimum quarterly,

-ofter eoch mojor r
5. To inspect and
6.

 

        

  

COVER SHEET
GROUND HYDRAULIC SERVICES

LEVEL 1 HYDRAULIC SERVICES
STORMWATER OPERATIONAL WORKS

SEDIMENT & EROSION CONTROL PLAN

Management

ing devices like leaf eaters
ters

in a: fog of cleaning

luding Fist flush storage tank
ication

but monthly in rainy season
b event

 

 
  

" To install ond maintoin pump ond fixtures for ;
reuse/watering/irrigation as to manufactures specification

GENERAL NOTES & LEGEND

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Site 606m"
Roof 242m"
Driveway 98m?
Tendscope 266m
New impervious 340m"
CATCHMENT AREAS:

alignment and levels
infrastructure.

it the obligation of the contractor
and/or plumbing contractor to survey
all existing services prior to

construction

Note:

All kitchen, loundry & bathroom fittings and toilets
to comply with the AAA Water Conservation Rating
System as defined by AS/NZS6400.

Provide flow restrictor volves where necessary

to tops and shower
exceed a maximum

 

 

 

 

 

 

   

of all existing

VYNARA P/L

GREG GIBBS ARCHITECTS

PROJECT: PROPOSED DEVELOPMENT
5 BLUEFIN COURT
NOOSAVILLE

DRAMING ‘TILE:

  

 

roses. The flow shall not

of St/min COVER SHEET

GENERAL NOTES &
LEGEND

 

me
1874-1

newer] RK [oesee]
Kara + 1:400,
(RPD:— Lot 2 on RP9O6911

[om [11-00-08

 

 

 

waruna| | 3

 

 

Page 37

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Existinp HOB 3.10010)
1.50

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BY3x

 

 

 

 

 

 

 

 

 

 

 

NE
8

 

eyes
BRS
ST

 

 

LATILS dAgze

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LINOD NISAINTVE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

@ 8M: SCREW IN KERB
Ru: 1.99)

 

 

 

 

Heve
S.
3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

to existing meter anjé

Provide traffloable path box,

moster mater be required o«
la 99 common use.

  

 

 

 

 

Te aE
PAPE DIA,
= 3
e 3
e &
= &
a Fg
bev 8
.
fw BS uno
100 under
i

 

 

LINOD NSANTE

          

  

 

AVMHLY |”
“9: 2
> 9D

  

ws.
4
Wee

 

BACKWASH CONNECTION DETAIL.
Scota_1:25

 

 

 

 

 

 

4. Al pipework #100 uniese noted otherwise
2. A Concrete surround grode N20

3X Provide tha principal wilh accurate records
at Te. Yocabons upon completion.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

VYNARA P/L
“ARCHITEL

 

oT
GREG GIBBS ARCHITECTS

‘provect: PROPOSED DEVELOPMENT
5 BLUEFIN COURT
NOOSAVILLE

DRAWING TITLE:

GROUND
HYDRAUUC SERVICES

—
1874-2 iD

  
  

 

 

 

 

 

 

 

 

 

 

 

Page 38

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Te
i
tS ll
; = it
1 = ll
. =
tg
ll
i
4
S__-_------ .
* ROOF PLAN
@ ® O®
se ® © QO
! 1 it
ig i ig
‘ & Be rt
| 1 ta
wot 1 mari = p ‘ese
bend Bascripion om

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

|

 

¥

 

 

 

 

 

 

BeSEES 3
eeesgess [a

*

i
i
ty

1700
1417

 

st
uy
FF

 

 

 

 

 

ew-contyd.com, Fk; $444 8226

 

CUENT =
VYNARA P/L

 

 

ag
i
a
i
|

j
!

 

 

 

|

 

‘ARCHTTECT

 

GREG GIBBS ARCHITECTS

Proect: PROPOSED DEVELOPMENT
5S BLUEFIN COURT
NOOSAVILLE

DRAWING TITLE:

LEVEL 1
HYDRAULIC SERVICES

peony RK _[Onecoma [ate [43-04-60 | ea Mo
sea + 12100 watuna| 3 of 5 1874-3 | J
(RPD:- Lot 2 on RP9O69I1

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 39

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

\
| |
>
[. |
; * |
> aN 28 e
| ™N et
> ~ s
as 8 ©. i %
CH ey
| at
100
| ¢
> | 55
: : ity
3 f= x | Sn
| © 4 |f
7 PY)
| hl Pee l “H
J a Qe / a
| ze ie Nal + 2u)
J att fin
< « (i 4
‘
| Q FR ny
:
Q i =
} GS « i
So ay we
=] bach tant be ‘above aurtace type SLM UNE
rs
i ” wee or
| i a Ler ao 0
> a8 to ensure 1000 litres to be drained at cll
4 Tres. Hater deta.
| M
i @ GM: SCREW IN KERB ft
RL: 1.9
4 wa 080
#100 fo} mac: | oN) Naa
2 4 oF 2
; a Irg e
Red Ban ae
$ vw
“ t
>
| | mia =
7 «7
[
ae Nate Dats
[Foe Development Anpcoval
For Building Approval x 11-64-08 |
For Tender
Overflow from Dp's
3
bate 3 Total tank volum+
Slow_leok | _{> 4,800 litres Budding OLD 4575
seneatrhoconnyd corn Pi: 5444 8645
Soesertyd.cam fu seas 0724
CLENT ;
VYNARA P/t
wens 00 GREG GIBBS ARCHITECTS
paonct, PROPOSED DEVELOPMENT
5 BLUEFIN COURT
NOOSAVILLE
Ground c - 1 DRAWING TITLE:
—_) STORMWATER
~~ OPERATIONAL WORKS
To stormwater
ABOVE GROUND DETENTION & HARVESTING TANK
eeor[ RK [ooo] [ow [roe fimo
\ sear : 12400 oa uaa 4m 5 {1874-4 4

 

 

 

 

[RPD:- Lot 2 on RP906911

 

 

Page 40

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

! . carace . aa
| v ; av $0°01'20" 8
1 ot < es
ek 30.30 a> aS *
1
| aR
iy
ry
| Ho
i fa Prior to the commencment of any construction activities the following meesures
| 7 | ‘shall be Incarporsted:
ty
V4
1 | © Provide education of site personnel
a 1 “ ° Set up action plans as @ precaution in case of dieturbances occuring
II P ‘eapocially after an unexpected strong rainfat! event Py
a © Provide regutar inspection and maintenance of all structures including the I
ut “ temporary structures. ea
Tt eS
| | 2
{ SiO
i +r aA
| ie 3
Vie “| Ke}
ay 1 vemporary construction entry/exit Y Y
AO im { ‘sediment trop refer detail
| 7 Oj
2
i it 606m?
| it | Ht 6
tt
tt
Hob
mg /
HO] / i
Vy
| Hood Je i
i fp os
| i 17 SB |
nt 8
|
i . /
i ,
it puta etre tt / pe
tt refer detail /
© BM: SCREW IN KERB My “ ( $
RL: 1.90 wt r Oe
| i 4 /
tt ° ‘ &
rc + * af /90.30 x
ol) whee entayeassey
| Ctr Hoa Ss BLOCK WALL 270°01'20" a
Alt ag v GARAGE
So ERs
: {
ENERAL NOTES NAP RTO LEGEND
me creat oe et oar aah SY si te eter
Instructions. that may be iusuad dujing the course et the contract. 1 ee . textbe Fabric
Gecreponcias shall be referred to the supervising officer for decision before ‘Storm Water Drainage and F42
proceeding with tha work. .
Contractor shall verily afl fhrture locations, Invert levels, surtoce lavas, and —7— Ni Drala
The erect beatian of ealstng’ ond proposal werden, aha bo werfiad with Overton 8
the relevant Authortly, of other trades ae appheable. SS few

STORMWATER ORAINAGE
Undarground pipework shall ba 100 dio PVC clos SW min grode 1:100 UNO.
Downalpas” shal be 100 Dla PVG close SW.

to
rate covers to

Covers ba *Feston

GRATINGS

Gratings for storm water to ba “toston, Catlc” oF equal,

Duty to motch monufscturers recommendations for condition,

ranch grate to be troneversa bar,

Floor, worte gretis tn publle creas’ to ba chrome pleted Bross

Note wediesent contrat
, General

{of Tarmporary dralooge contr, How shold be arid cround the wore ie, chare poms.

b) Aa drainage, ‘Gnd vedimant controls to be Insiaied and be operational before commencing up—slope

fc) Ait control’ macsures to ba Inspected ot lecst wash and otter significant runoff producing storms,
Control measures may be ramoved whan on-site arcaion is controtied ond 70% permanent sol
coverage ia cbtgined over ot upstream disturbed land.

2. Sediment Fence

{0} Use woven tadrics

3, Temp Construction Enty/Eat. Sediment Trap: .

eh Seeger secrter ranatto be Shared een, fs ory fe

pb) Wheel — wash or spray unt may be required Guring wet wecthar.

4, Safety iasume must be considered ot al times, incorpats tretfie control devices to tha eotlsfoction of the superintendent.

5. Al drenslons in miimatras uniess (ndicoted othereiae.

6. Fickd_iniat

@) A etablised bypass overtand flow path should exist adjacent to the field iniat

8} Wotar Wel control perimeter banks may be requied, .
e} Blocks to ba by © horizontal timber ral ct black Join height fixed to timber stakes ot comers

7. Safety iaeuen must be conskiered ol aif Umes, incorporate brottic contrat devices to the ectisfaction of the Superintendent.

 

 

 

 

———— = Sediment berrie

* Clemetr

toe Sheng tp mute

fe Hamm SE

oe Gutty pit

oH Gully Hole

c lnspection Chombar

© ee!

Rac Korg a Channat

S me

Fra real Property Bounda
fai Property

fo ast propery cesegdon

fad am water" tet

Rw Rain water head

Sr Serfoce trv!

sq ‘Square

sw Storm water ércin

Fay Trench grata transverse bor
Tiaech Grote loogtsednas or
Ute

wa Ungerer

ee, Uilete tae otharvien

 

 

 

Grushed oF grannusor material
Grading to Tobie 4 of OT
Spectticotion MRS11,03

   

ALTERNATIVE 2

SEDIMENT TRAP

  

 

 

SEDIMENT AND EROSION CONTROL MANAGEMENT PLAN:

. we
“Tesminimian erceion on sia and eneue naxiomant lo not washed down ts the rece ing weterenys df sonstnurion

« =fERPONeeETY:
repre ix al means ming fa eshuart ard rca ctu a owen shal be wih
UMTRAGTOR he Gneacot thd ogni Creal mono tay a tres tbe open

‘Ror cher warbars of sf en! oad by weno

reciente ecleccn sian epi ote ecto ay rch on ena, cr, pap,
Ci a ut nici meer ok GP.

“Seneure afl stoxieiies toy bon Inceming and outgoing goocis In particnier sella ar amma ane Chnatty Suartead amc |

* AzTONR
I comm cf eafor altel events Os Ieicming Scton plan chal be flowed and meporetiy locked afer by te,
CONTRACTOR:

“DONT WAT UMITL IT 16 YOO LATE
ha en ale dartg Oe cated period erat mci toe dain fut, Rene hare recpired,

Nock the tere afar ovary cna enc replace ie forza where required. Check wd replace ofl antan,
Dalen, eanchage ond teenporey mania, of off drain and tanchee where required.

‘check fe recabarg ph anc becrove te tamer cya
Sebechinee cAGh fnir0 Bs TH EVENT TO ACTIVELY WAATOM AMD CONTROL. THE UO

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Doser Bar

Fis to top of stake wan

shadectoth fastener or

tle to eteel picket

50 HW stake or steel
picket 1200"rIn- tong
Iau ee Date

FEor Devetopant Approval
‘ot _Pullging Approvol 11-04-08)
lror Tender
for _Eonatruction

 

 

 

 

 

 

 

Pr: S844 8545,
Fe: $444 224

 

VYNARA P/L

 

ARCATECT

GREG GIBBS ARCHITECTS

   

PROECT: ~PROPOSED DEVELOPMENT
S BLUEFIN COURT
NOOSAVILLE

DRAWING TITLE:

 

SEDIMENT &
EROSION CONTROL
PLAN

A

1874-5

 

Besort RK [owed] pecs [790408
scar ; $:400 ovat uaa} Sof 5

[[RP0:— Lot 2 on RP906911

 

 

 

 

 

 

Page 41

 

 

Regional Council

SALE OF DOCUMENTS

Sunshine Coast ‘and use section FEES

RECEIPT TYPE

 

 

 

 

 

 

Superseded Planning Scheme Documentation 520
Copy of Permit/Approval Letter 110
The Noosa Plan Documentation 111
APPLICATION FEES
Material Change of Use - Code/Impact
Consistent 521
Inconsistent 521
Assessment under Superseded Planning Scheme 521
Modification to a Development Permit §21
Extension of a Currency Period 521
@ Operational Works - Landscaping [275 521
™ Bldg Work assessable against the Planning Scheme 521
PRE LODGEMENT REVIEW
Half Hour §22
One Hour §22
ADVERTISING
Purchase Advertised Applications §23
JETTIES
Jetty Application Fee 524
Jetty Bond 51
(Category 4)
BONDS
’ Performance Bond 51
(Category 9)
SIGNS
e Registration Fee . 222
SEARCH FEE .
Search of Land Use Section file 112
Liquor Licensing Request 113
TOTAL $ 1O1S_
NAME: Vepraren. Pp ho bed
appress: “7 (4, Aan “th,
SUNSmwe Beaxcte UST
FILENO: O87 Tuy DATE: dK K[ 0} a
T
REGEIPT NO: 399YOD 7 Signature of TP Officer: VS Avnren oe
+
AUTHORITY NO: L

 

ef Coo 8 [ef

7

Page 42

 

 

  

DEVEL@@MENT FEES & CONTRIBUTIONS oe
(Cashier, Please Retum to Admin Officer, Development}

  

Sunshine Coast

| Regional Council _
APPLICATION AND GENERAL FEES

      
  
  
 
  

   
  
 
 
 

 
  
  
 

Application Fees

Road / Drainage Plan Exam
Road / Drainage Field Inspection
| Legal Document Examination
Sealing Fee - Survey Plans, Legal Documents

Closed Circuit TV Inspection
CONTRIBUTIONS __
Developer Contribution — Landscaping
Developer Contribution - Road Other than PSP

Developer Contribution - Drainage Other than PSP

[ Developer Contribution Pathway Other than PSP [688 Inspection Calculation

Developer Con. intewOrstrang(PSPISCar parking) [= Inspection cateuaton

ROADWORKS CONTRIBUTIONS . J
ICS - Public Transport

IGS Sovrage- Sou Perea PSP Waroai aeration perans

Payee Name:
Address:

 

 

 
  

 

   

 

 
   
   

 
    
     
 

 

 

   

 

 
 
    

   
  

 

         

    

 

             
 
 
 
 
  
 
 
 

ICS - Water Supply (PSP)

  

 

 
   
  
   
  
 

ICS — Sport and Recreation Land (PSP Parks)
ICS ~ Drainage (PSP Noosaville Master & Ward Street)

ICS - Road (CMRNICP) If BA not entered then use 594
ICS - Pathway (PSP)

 

 

 

   
 

 

 

 

   

Total of Fees Paid (Excluding Bonds)

$s lets,
CPiDate: SSS SSSSSSSSCS«(L AMOUNT _| RECEIPT TYPE | File Numbers or Reference:
Security Deposits/Performance/Maintenance/Uncompleted Works Bond ; 51 (Cat 9)
Total of Fees Paid (Including Bonds) Date application properly made: 7
Receipt No:

PyLand DevelopmentFEES & CONTRIBUTIONS/DEVELOPMENT FEES.doc

   

 

 

 
    

Used in these records

About this file

File size
2.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0744 - Operational Works - Landscaping, Stormwater, Carparking, Access, Frontage Works, Stormwater Disposal, Sediment & Erosion Control [As Published].pdf · 2.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.