08/0744 - Operational Works - Landscaping, Stormwater, Carparking, Access, Frontage Works, Stormwater Disposal, Sediment & Erosion Control [As Published] · 142008.744
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.2, 31 March 2008
(STATE-CONTROLLED ROAD |
4.1.1 Is any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlied road?
No
C1 Yes
If no, is the proposed operational work for filling or excavating listed in Integrated Planning Regulation 1998,
schedule 5 and does it exceed the threshold?
(1 No -Gotoa4.1.2
Oo Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
JP Regulation, schedule 2, fable 3, item 3; IP Regulation, schedule 2, lable 3, itern 1(b)
“ACID SULFATE SOILS
4.1.2 Is any of the operational work proposed in a local government area listed*' in State Planning Policy 2/02: Planning and Managing
Development Involving Acid Sulfate Soils
11 No -Gotoa4.1.3 Yes
4A purukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Burnett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Cooloola, Douglas,
Ml
Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Momington, Noosa, Pine Rivers
Reddiiffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday
If yes, is the natural ground level of any point where work is being carried out less than 20m AHD?
LJ No
Yes
If yes, does the proposed operational work involve the following?
(i) Excavating more than 1,000m? of soil or sediment at or below 5m AHD 0 No 0 Yes
(ii) Filling the premises with 1,000m: or more of material with an average depth of O] No 0 Yes
0.5m on land, soil or sediment at or below 5m AHD
Ityes to either or both (i) or (ii) above - This application must to be referred fo the Department of Natural Resources and Water (NRW)
as Advice Agency
IP Regulation, schedule 2, table 3, item 4; State Planning Policy 2/02: Planning and Managing Development involving Acid Sutfate Soils, section 3.6
[EASEMENTS AND SUBSTATIONS
se Rw 8 ete oy go is ee : a . |
4.1.3 Is any of the proposed operational work for filling or excavation?
(1 No -Gotoa4.1.4
Yes
If yes, is the filling or excavation associated with reconfiguring a lot?
LT Yes - Goto 04.14
No - Answer both (a) and (b) below
(a) Is any part of the premises subject to an easement in favour of a distribution entity or transmission entity under
the Electricity Act 1994?
No
(J Yes
(b) Is any of the operational work proposed to be located within 10m of a substation site under the Electricity
Act 1994?
No O Yes - This application must be referred to the entity responsible for the substation as Advice Agency.
IP Regulation, schedule 2, table 3 item 10(a); IP Regulation, schedule 2, table 3, item 10{b)
414 — \s any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number 1 issued under the
Petrofeum Act 1923 for the construction or operation of the Moonie to Brisbane strategic pipeline under that Act?
No -Gotoas.1.5 [_] Yes
IP Regulation, schedule 2, table 3, item 17
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0744 - Operational Works - Landscaping, Stormwater, Carparking, Access, Frontage Works, Stormwater Disposal, Sediment & Erosion Control [As Published]Related documentApplication case desk ↗