08/0744 - Operational Works - Landscaping, Stormwater, Carparking, Access, Frontage Works, Stormwater Disposal, Sediment & Erosion Control [As Published] · 142008.744

of 42

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

£0 Construction Hydraulic

rn

Building Service Engineers

 

Calculation of Stormwater Runoff and Detention Requirements for:
Project: 5 BLUEFIN COURT
Ref: 1874 Date: 11/04/08
Calculate increase in peak flow due to extra impervious area
Predevelopment Case
Maximum event
time of Concentration
Intensity (1)
Existing site area (A)
Calc coeff of runoff
From QUDM Table 5.04.2
for Q10 intensity
With fraction impervious
{nterpolating C10
From table 5.04.3
frequency factor Q100
Therefore Coefficient of runoff for grassed site Q100

 

Peak runoff for predeveloped catchm

@ Post Development Case
a) New Impervious Catchment Area
Coeff of Runoff
Intensity as before
Therefore peak Runoff

b) New Pervious area
Coeff of runoff as before

Intensity as before
Therefore peak Runoff

Total Peak runoff post development case
Difference in peak flow Runoff due to development

Therefore Required reduction in peak flow for Maximum event
) difference in peak flow between developed and undeveloped areas

ua

io

PO Box 1176 Buddina 4575

Q100
5 mins
326 mm/hr
606 sq.m

200.00 mm/hr
0.00
0.70

1.20
0.84

Coeff of R * Intensity * Area/360G L/sec
46 Ws

340 sq.m
1
326 mm/hr
Coeff of R * Intensity * Area / 3600
31 Ls
Total site Area - new impervious area
266 sq.m
0.84
326.00 mm/hr
Coeff of R * Intensity * Area / 3600
20 Lis

runoff pervious + runoff impervious
51 Lis
Peak runoff post dev - Peak runoff pre dev.

5 Lis

5 Us

Used in these records

About this file

File size
2.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0744 - Operational Works - Landscaping, Stormwater, Carparking, Access, Frontage Works, Stormwater Disposal, Sediment & Erosion Control [As Published].pdf · 2.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.