Council archive · source document
08/0744 - Operational Works - Landscaping, Stormwater, Carparking, Access, Frontage Works, Stormwater Disposal, Sediment & Erosion Control [As Published] · 142008.744
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
Table D Complete if the premises are adjacent to or associated with a water body, watercourse or aquifer (o.9. river, creek, fake, canal)
[1
Name of water body, watercourse or aquifer (if known)
Table E Complete if the premises are on Strategic Port Land under the Transport infrastructure Act 1994
Lot on 1 plan description for strategic port land . Port Authority for the fot
fr
Table F Complete if the premises are in tidal water
~~ Name of local government for the td
Name of port authority for the tidal area (if applicable)
[1
3. __ Indicate the total area of the premises on which the development is proposed: (Note: The total area may include land both above and belaw water)
r Total area of premises |
606,00 [xjm? [hectares (Tick appicablo unig
{Existing use of the premises
4. — Current use/s of the premises: (e.g. vacant land, house, townhouses, apartment builfing, shop, service station, school, sugar cane farming etc.)
[1 Vacant
5. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow, water etc,)?
No oO Yes - Ensure the type, location and dimensions of each easement are included in plans, submitted with the application
{Proposal details :
6. Brief description of the proposal (e.g. 6 unit apartment building, 30 ot residential subdivision, a bore, aquacutture)
Duplex Owelling
7. Does the poposal include new buildings or operational work (including any services) on the premises?
LI No Yes - Ensure the nature, location and dimensions of the proposed works are included in plans, submited with the application
iResource entitlement (if applicable)” - further information is provided in the advice section at the end of the form
8. Does the application involve taking or interfering with a State resource and therefore require a resource entitlement? (6.9. the appication
involves State land (leased and freehold), declared Fish Habitat areas, taking quarry material, taking or interfering with water under the Water Act 2000, etc.)
No - Goto. a9 C] Yes - Complete Table G - provide details for each evidence required on a separate row, if applicable. Evidence of resource
allocation or entitlement must be submitted with the application. You do not need to answer Q9 - go to the next section.
{Owner '$ consent (if applicable) - further information is provided in the advice section at the end of the form
9. Complete Table H for applications involving a material change of use; reconfiguration of a lot; work on land below high- ‘water mark and
not within a canal as defined under the Coastal Protection and Management Act 1995; or work on rail corridor land defined under the
Transport Infrastructure Act 1994 - provide details for each owner on a separate row, or on an attachment to this form if applicable.
Premises Owner's namels Details of the premises owned . « < | Dateconsent |
Table H and postal address... (stot adtiesso ton lon dasciphion) Owners signee” “| _was obtained
Vynara PL
1 6 Maher Tce § Bluefin Court Noosaville 4566
Sunshine Beach 4567
* Owner's signature cannot be pravided on the form if you intend to submit the application electronically. Owner's consent must be provided to the assessment manager on an
attachment containing appropriate written documentation of the owner's consent. If the owner is a company, $127 af the Corporations Act 2001 (Cwealth) details how a
company may sign as owner. Templates for the provision of owner's consent are available on the IPA website .
[Attachments and supporting information (Compete Table] - Use a separate row for each type of attachment or information, including information required
fer this, Part) Please ensure all documentation submited with this form, including oltter Parts of Form 1, or owrier’s conisent etc, are securely attached to this Part of the Form.
Description of attachment or information —
: Title 4 t plicable) . ke . Method of delivery to
able (4g. Pa of Frm 1,0 oars conse etme (09, Gon Authryemes Steet Repo Date ‘assessiert manager
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0744 - Operational Works - Landscaping, Stormwater, Carparking, Access, Frontage Works, Stormwater Disposal, Sediment & Erosion Control [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.