Council archive · source document
08/0744 - Operational Works - Landscaping, Stormwater, Carparking, Access, Frontage Works, Stormwater Disposal, Sediment & Erosion Control [As Published] · 142008.744
! . carace . aa
| v ; av $0°01'20" 8
1 ot < es
ek 30.30 a> aS *
1
| aR
iy
ry
| Ho
i fa Prior to the commencment of any construction activities the following meesures
| 7 | ‘shall be Incarporsted:
ty
V4
1 | © Provide education of site personnel
a 1 “ ° Set up action plans as @ precaution in case of dieturbances occuring
II P ‘eapocially after an unexpected strong rainfat! event Py
a © Provide regutar inspection and maintenance of all structures including the I
ut “ temporary structures. ea
Tt eS
| | 2
{ SiO
i +r aA
| ie 3
Vie “| Ke}
ay 1 vemporary construction entry/exit Y Y
AO im { ‘sediment trop refer detail
| 7 Oj
2
i it 606m?
| it | Ht 6
tt
tt
Hob
mg /
HO] / i
Vy
| Hood Je i
i fp os
| i 17 SB |
nt 8
|
i . /
i ,
it puta etre tt / pe
tt refer detail /
© BM: SCREW IN KERB My “ ( $
RL: 1.90 wt r Oe
| i 4 /
tt ° ‘ &
rc + * af /90.30 x
ol) whee entayeassey
| Ctr Hoa Ss BLOCK WALL 270°01'20" a
Alt ag v GARAGE
So ERs
: {
ENERAL NOTES NAP RTO LEGEND
me creat oe et oar aah SY si te eter
Instructions. that may be iusuad dujing the course et the contract. 1 ee . textbe Fabric
Gecreponcias shall be referred to the supervising officer for decision before ‘Storm Water Drainage and F42
proceeding with tha work. .
Contractor shall verily afl fhrture locations, Invert levels, surtoce lavas, and —7— Ni Drala
The erect beatian of ealstng’ ond proposal werden, aha bo werfiad with Overton 8
the relevant Authortly, of other trades ae appheable. SS few
STORMWATER ORAINAGE
Undarground pipework shall ba 100 dio PVC clos SW min grode 1:100 UNO.
Downalpas” shal be 100 Dla PVG close SW.
to
rate covers to
Covers ba *Feston
GRATINGS
Gratings for storm water to ba “toston, Catlc” oF equal,
Duty to motch monufscturers recommendations for condition,
ranch grate to be troneversa bar,
Floor, worte gretis tn publle creas’ to ba chrome pleted Bross
Note wediesent contrat
, General
{of Tarmporary dralooge contr, How shold be arid cround the wore ie, chare poms.
b) Aa drainage, ‘Gnd vedimant controls to be Insiaied and be operational before commencing up—slope
fc) Ait control’ macsures to ba Inspected ot lecst wash and otter significant runoff producing storms,
Control measures may be ramoved whan on-site arcaion is controtied ond 70% permanent sol
coverage ia cbtgined over ot upstream disturbed land.
2. Sediment Fence
{0} Use woven tadrics
3, Temp Construction Enty/Eat. Sediment Trap: .
eh Seeger secrter ranatto be Shared een, fs ory fe
pb) Wheel — wash or spray unt may be required Guring wet wecthar.
4, Safety iasume must be considered ot al times, incorpats tretfie control devices to tha eotlsfoction of the superintendent.
5. Al drenslons in miimatras uniess (ndicoted othereiae.
6. Fickd_iniat
@) A etablised bypass overtand flow path should exist adjacent to the field iniat
8} Wotar Wel control perimeter banks may be requied, .
e} Blocks to ba by © horizontal timber ral ct black Join height fixed to timber stakes ot comers
7. Safety iaeuen must be conskiered ol aif Umes, incorporate brottic contrat devices to the ectisfaction of the Superintendent.
———— = Sediment berrie
* Clemetr
toe Sheng tp mute
fe Hamm SE
oe Gutty pit
oH Gully Hole
c lnspection Chombar
© ee!
Rac Korg a Channat
S me
Fra real Property Bounda
fai Property
fo ast propery cesegdon
fad am water" tet
Rw Rain water head
Sr Serfoce trv!
sq ‘Square
sw Storm water ércin
Fay Trench grata transverse bor
Tiaech Grote loogtsednas or
Ute
wa Ungerer
ee, Uilete tae otharvien
Grushed oF grannusor material
Grading to Tobie 4 of OT
Spectticotion MRS11,03
ALTERNATIVE 2
SEDIMENT TRAP
SEDIMENT AND EROSION CONTROL MANAGEMENT PLAN:
. we
“Tesminimian erceion on sia and eneue naxiomant lo not washed down ts the rece ing weterenys df sonstnurion
« =fERPONeeETY:
repre ix al means ming fa eshuart ard rca ctu a owen shal be wih
UMTRAGTOR he Gneacot thd ogni Creal mono tay a tres tbe open
‘Ror cher warbars of sf en! oad by weno
reciente ecleccn sian epi ote ecto ay rch on ena, cr, pap,
Ci a ut nici meer ok GP.
“Seneure afl stoxieiies toy bon Inceming and outgoing goocis In particnier sella ar amma ane Chnatty Suartead amc |
* AzTONR
I comm cf eafor altel events Os Ieicming Scton plan chal be flowed and meporetiy locked afer by te,
CONTRACTOR:
“DONT WAT UMITL IT 16 YOO LATE
ha en ale dartg Oe cated period erat mci toe dain fut, Rene hare recpired,
Nock the tere afar ovary cna enc replace ie forza where required. Check wd replace ofl antan,
Dalen, eanchage ond teenporey mania, of off drain and tanchee where required.
‘check fe recabarg ph anc becrove te tamer cya
Sebechinee cAGh fnir0 Bs TH EVENT TO ACTIVELY WAATOM AMD CONTROL. THE UO
Doser Bar
Fis to top of stake wan
shadectoth fastener or
tle to eteel picket
50 HW stake or steel
picket 1200"rIn- tong
Iau ee Date
FEor Devetopant Approval
‘ot _Pullging Approvol 11-04-08)
lror Tender
for _Eonatruction
Pr: S844 8545,
Fe: $444 224
VYNARA P/L
ARCATECT
GREG GIBBS ARCHITECTS
PROECT: ~PROPOSED DEVELOPMENT
S BLUEFIN COURT
NOOSAVILLE
DRAWING TITLE:
SEDIMENT &
EROSION CONTROL
PLAN
A
1874-5
Besort RK [owed] pecs [790408
scar ; $:400 ovat uaa} Sof 5
[[RP0:— Lot 2 on RP906911
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0744 - Operational Works - Landscaping, Stormwater, Carparking, Access, Frontage Works, Stormwater Disposal, Sediment & Erosion Control [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.