37,800.0
3 ROOF
2,100
ROOF DECK
HIGH VOLTAGE CABLES
MIN. 3M CLEARANCE BELOW WIRES TO
34,800.0 STRUCTURES NOT NORMALLY ACCESSIBLE
2 LEVEL 02
R 3,000
3,000
MIN. CLEARANCE ZONE FOR POLE MOUNT
GENERATORS FROM HABITABLE SPACES
MIN. RECOMENDED CLEARANCE ZONE
HABITABLE SPACES FOR LONG TERM
TO POLE MOUNT GENERATORS TO
HEALTH REASONS
POLE MOUNT TRANSFORMER
UNIT BALCONY
1,200
31,800.0
1 LEVEL 01 LOWER VOLTAGE CABLES
R 4,000
R 3,000
MIN. 2.7M CLEARANCE BELOW WIRES TO
STRUCTURES NOT NORMALLY ACCESSIBLE
2,700
CARPARK
BOUNDARY
PROPERTY
28,800.0
0 GROUND FLOOR
RECOMMENDED 1.5M CLEAR ZONE AROUND
POLE ALTHOUGH NO MIN. REQUIRMENT IS
SPECIFIED
AWNING WILL BE CONSTRUCTED TO FULL
EXTENT (3M FROM BOUNDARY LINE) IF
1,500 ENERGEX APPROVES THE ENCROACHMENT
TO THE POWER POLE
TENANCY 02
ROAD RESERVE
EXISTING ENERGEX ASSET
24,900.0
-1 BASEMENT 01
SIGNAGE NOT APPROVED AS PART OF THIS
APPLICATION
GENERL NOTES:
Wylde Co Pty Ltd retains copyright in all documents, drawings, schedules, and images prepared for the project and in any works
executed from those documents and drawings. Wylde Co Pty Ltd retains copyright of all artwork in the form of renderings, animations
BOTTLE BRUSH MIXED USE
SK10037.18
and photography delivered in any format. Clients may be granted unlimited use license of all delivered artwork conditioned on receipt
BOTTLE BRUSH AVE, NOOSA
of full payment as agreed at the time of release.
CLIENT - CAPITAL J INVESTMENTS
All information shown in this document is indicative for discussion purposes only, and is subject to detail design, engineering and
consultant input and relevant planning and local authority approvals. It is to be viewed with regard to the specific purpose of the issue
DRAWING TITLE
which is for preliminary feasibility purposes only as an uncontrolled document. Wylde Co Pty Ltd accepts no responsibility for alterations
by persons once issued.
01 WOP DESIGN ISSUE 4 12.12.25 TU JG JG
SECTIONS
The information contained herein is believed to be correct at the time of preparation however is not guaranteed. Recipients must rely on ISSUE PURPOSE DATE D. C. A.
their own enquires to satisfy themselves in all aspects. Wylde Co Pty Ltd accepts no damages, liabilities or costs, including legal costs of JOB No ISSUE
defence arising from changes made by anyone other than Wylde Co Pty Ltd or from reuse of the information contained herein without
STATUS ACC01 01
23
prior consent of Wylde Co Pty Ltd.
GSPublisherVersion 1188.11.11.100
Document Set ID: 24389867
Version: 1, Version Date: 18/12/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.