8. Appendix D - Traffic Engineering Report
241245
DA 01
June 2024
Traffic Engineering Report
Proposed Function Facility
658 Louis Bazzo Drive, Ringtail Creek
Lot 4 on RP160124
For
Louis Bazzo Pty Ltd
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.
Full text of the other 29 pages
Page 2
Traffic Impact Assessment Report
Wedding Venue, Ringtail Creek
For Louis Bazzo Pty Ltd
June 2024
Proposed Wedding Venue
658 Louis Bazzo Drive, Ringtail Creek
Lot 4 on RP160124
For Louis Bazzo Pty Ltd
Project Date Issue Dianne Hayes RPEQ 7086
241245 June 2024 DA – 01
Project No: 241245
June 2024
Status: DA Issue no: 01
Hayes Traffic Engineering
ABN: 98 615 073 565
PO Box 303
Coolum Beach Qld 4573
Phone: 0403 889 039
[email protected]
Dianne Hayes
RPEQ 7086
(c) Copyright Hayes Traffic Engineering.
This report has been prepared for the exclusive use of the commissioning party and unless otherwise agreed in
writing by Hayes Traffic Engineering, no other party may copy, reproduce, distribute, make use of, or reply on the
contents of the report. No liability is accepted by Hayes Traffic Engineering for any use of this report, other than
for the purposes for which it was originally prepared and provided.
Page 2
Page 3
Traffic Impact Assessment Report
Wedding Venue, Ringtail Creek
For Louis Bazzo Pty Ltd
June 2024
TABLE OF CONTENTS
1 INTRODUCTION ............................................................................................... 4
2 EXISTING CONDITIONS .................................................................................... 5
2.1 Road Network ...............................................................................................5
2.2 Traffic Volumes .............................................................................................5
2.3 Crash History .................................................................................................6
2.4 Future Road Upgrades ..................................................................................6
3 DEVELOPMENT PROPOSAL .............................................................................. 7
4 TRIP GENERATION AND DISTRIBUTION ........................................................... 8
4.1 Trip Generation .............................................................................................8
4.2 Trip Distribution and Assignment .................................................................8
5 TRAFFIC IMPACT ............................................................................................ 10
5.1 Access Intersection Performance................................................................10
5.2 Turn Warrants .............................................................................................10
6 SITE ACCESS ................................................................................................... 13
7 PARKING ARRANGEMENTS ............................................................................ 15
7.1 Noosa Council Requirements ......................................................................15
7.2 Australian Standards AS2890.1 Requirements ...........................................15
8 CONCLUSIONS ............................................................................................... 16
Appendices
Appendix A – Proposed Development Layout
Appendix B - SDAP Codes
Page 3
Page 4
Traffic Impact Assessment Report
Wedding Venue, Ringtail Creek
For Louis Bazzo Pty Ltd
June 2024
1 INTRODUCTION
Hayes Traffic Engineering has been commissioned by Louis Bazzo Pty Ltd to provide
traffic engineering advice for a proposed wedding venue at Ringtail Creek. Drawings
of the proposal have been provided by Blackburn Jacksin and are included in
Appendix A. This report has been produced to assess the impact of traffic generated
by the proposed development on the surrounding street network.
The objective of this study is to provide adequate information to the Sunshine Coast
Council and the Department of Transport and Main Roads (DTMR) for a material
change of use development application.
Figure 1 - Aerial view of subject site
Source: Qld Globe
Page 4
Page 5
Traffic Impact Assessment Report
Wedding Venue, Ringtail Creek
For Louis Bazzo Pty Ltd
June 2024
2 EXISTING CONDITIONS
In order to assess the impact of the proposal it is necessary to establish existing
transport conditions within the surrounding area. Traffic survey data has been
obtained to provide information for this study.
2.1 Road Network
The development site is located at 638 Louis Bazzo Road, Ringtail Creek and is
described as Lot 4 on RP160124. Louis Bazzo Drive has a 6.5m pavement with
centreline markings and no edge line and gravel shoulders. There is a school bus
route along this section of road. The posted speed limit is 80km/h.
Photo 1 – Existing Access from Louis Bazzo Road
2.2 Traffic Volumes
The most recent traffic volumes obtained from the 2022 TMR Traffic Census (site
20759) for Louis Bazzo Road in the vicinity of the subject site indicates a daily traffic
volume of 1,753 vehicles per day (vpd). The peak hour traffic flow is estimated to be
210 vehicle per hour (vph) based on 12% of daily traffic flows.
Page 5
Page 6
Traffic Impact Assessment Report
Wedding Venue, Ringtail Creek
For Louis Bazzo Pty Ltd
June 2024
2.3 Crash History
Crash history data was obtained from Qld Globe for crashes occurring in the vicinity
of the site over the past 20 years. Data indicates five crashes have occurred in the
vicinity of the site access; however, none have occurred in the past five years.
Table 1 – Crash History
Crash DCA Code Date Severity
1 805 May 2017 Hospitalisation
2 607 Mach 2014 Hospitalisation
3 803 July 2004 Property Damage
4 201 February 2018 Hospitalisation
5 803 November 2014 Medical Treatment
Figure 2 – Crash Locations
Source: TMR Data via Google Earth
2.4 Future Road Upgrades
A review of the development assessment mapping system indicates there are no
planned upgrades in the area.
Page 6
Page 7
Traffic Impact Assessment Report
Wedding Venue, Ringtail Creek
For Louis Bazzo Pty Ltd
June 2024
3 DEVELOPMENT PROPOSAL
The Development Proposal includes an application for a material change of use for a
wedding venue consisting of a 30m by 10m marque structure and associated car
park. The proposed venue will cater for wedding with up to 150 guests, wellness
nature retreats and corporate retreats. Refer to Appendix A for proposed plans of
the development.
Vehicular access to the site will be provided from the existing driveway access from
Louis Bazzo Drive with a 5.5m wide gravel road to the venue. Two indented bus bay
have been provided and a car park with 55 spaces for guests including 1 disabled
space and a separate car park with 4 spaces for staff.
Figure 3 - Proposed Development
Page 7
Page 8
Traffic Impact Assessment Report
Wedding Venue, Ringtail Creek
For Louis Bazzo Pty Ltd
June 2024
4 TRIP GENERATION AND DISTRIBUTION
To analyse the impact of the development on the existing transport infrastructure, it
is necessary to assess the number of trips likely to be generated to and from the site
and where they are likely to travel. Whilst current guidelines do not provide specific
trip generation rates for wedding venues or function facilities, an analysis from first
principles has been undertaken.
4.1 Trip Generation
A wedding with 150 guests was chosen as the critical peak event to assess the impact
of traffic generated from the site. The venue is expected to facilitate up to 150
guests. Whilst for larger events with 150 guests, buses will be used to transport
guests from events, for smaller events such as corporate retreats, it is expected that
guests will arrive by car. It is estimated the average car occupancy of 3 persons per
car (slightly lower than a trip generation for a church) will apply to the site.
Therefore, the venue is estimated to generated a maximum of 2 buses and 17 car
trips for a wedding event. It is expected that the majority of guests will at the
commencement of the service and depart at the conclusion.
Table 2 - Estimated Traffic Generation Rates
Function Bus Car / Taxi /Uber Staff Peak Generation
Trips
Wedding 150 guests 2 17 10 29
Long Lunch 100 Guests 1 20 8 29
Retreat 50 guests 17 7 24
The estimated traffic generation from the proposed development is expected to be
29 vehicles during the peak hour. The site may generate a small number of trips
throughout the day for deliveries, but they are unlikely to impact significantly on the
external road network.
4.2 Trip Distribution and Assignment
Trip origin and destination for the proposed development has been assessed. The
assignment of development generated traffic has been based on a manual
assessment of the likely routes to/from the development site, given the location of
the site with reference to the surrounding town centres and tourist attractions. The
Page 8
Page 9
Traffic Impact Assessment Report
Wedding Venue, Ringtail Creek
For Louis Bazzo Pty Ltd
June 2024
assessment takes into account the shortest/quickest routes, and the number of
intersections along the route.
The assignment of trips will be 100% arrivals during the critical peak period for the
commencement of an event and 100% departure for the completion of an event.
Based on existing traffic data and the location of the site with reference to
surrounding town centres and residential and accommodation catchments, it is
expected that 85% of development generated vehicles will travel to and from the
east via McKinnon Drive (Tewantin and Noosa) and 15% will travel to and from the
west via Pomona Kin Kin Road (Pomona). A diagrammatic distribution of
development generated arrival trips is shown in Figure 4. Departing trips are
expected to be the opposite with 25 trips turning right out and 4 trips turning left
out of the development access.
Figure 4 - Proposed Development Traffic Distribution (Arrivals)
Page 9
Page 10
Traffic Impact Assessment Report
Wedding Venue, Ringtail Creek
For Louis Bazzo Pty Ltd
June 2024
5 TRAFFIC IMPACT
The assessment of the impact of the proposed development on the street network
has been undertaken. The impact has been analysed according to the procedures
set out in Austroads – Guide to Traffic Management and Guide to Road Design.
5.1 Access Intersection Performance
The access driveway with Louis Bazzo Road has been reviewed for operational
performance. The traffic generation from the development during the critical peak
period is shown in Figure 5. The traffic volumes along this section of road are so low
that the access intersection will operate with uninterrupted flow conditions and
detailed traffic modelling is not considered necessary.
Figure 5 - Proposed Development Traffic Distribution (Arrivals)
5.2 Turn Warrants
An assessment of intersection geometry has been undertaken with reference to the
requirements of Austroads Guide to Road Design and Traffic Management. The
access intersection meets the warrants for a Basic Right Turn treatment (BAR) and
Basic Left Turn treatment (BAL) as shown in Figure 6.
Page 10
Page 11
Traffic Impact Assessment Report
Wedding Venue, Ringtail Creek
For Louis Bazzo Pty Ltd
June 2024
Figure 7 – Turn Warrants for Access Intersection
An example of the BAR and BAL treatment which includes widening of the shoulder
is provided in Figure 8 and Figure 9 respectively.
Figure 8 – BAR Treatment
Page 11
Page 12
Traffic Impact Assessment Report
Wedding Venue, Ringtail Creek
For Louis Bazzo Pty Ltd
June 2024
Figure 9 – BAL Treatment
Page 12
Page 13
Traffic Impact Assessment Report
Wedding Venue, Ringtail Creek
For Louis Bazzo Pty Ltd
June 2024
6 SITE ACCESS
An assessment of the sight visibility at the proposed access has been undertaken. Sight
distance has been assessed from the proposed access driveway in accordance with
Austroads Guide to Road Design Part 4A. The posted speed limit of Louis Bazzo Drive
is 80km/h.
The following sight distance criteria applies for the proposed access intersection.
MGSD – Minimum Gap Sight Distance for the critical right turn movement
SISD – Safe Intersection Sight Distance
SSD –Stopping Sight Distance (minimum criteria)
Normal Design Domain has used the following:
Observation time (OT) of 3 seconds (Clause 3.2.2 of Austroads Part 4A)
Reaction time (RT) of 2 seconds (Table 5.2 of Austroads Part 3)
Coefficient of longitudinal deceleration of 0.36 (Table 5.3 of Austroads Part 3)
Extended Design Domain has used the following:
Observation time (OT) of 1.5 seconds (Table A8 of Part 4A)
Reaction time (RT) of 2 seconds (Table A5 of Austroads Part 3)
Coefficient of longitudinal deceleration of 0.46 (Table A6 of Austroads Part 3)
Table 3 - Austroads Sight Distance Criteria 90km/h
Posted 80km/h & Design Speed of 90km/h MGSD SISD SSD
Normal Design Domain (NDD) OT=3s RT=2s 125m 214m 139m
Extended Design Domain (EDD) OT=1.5s RT=2s 157m 119m
The proposed access intersection location has been assessed in regard to sight
visibility and geometry. A site inspection was undertaken on to measure sight
distances from the proposed intersection location and results provided in Table 3.
Table 4 - Sight distance measurements
Intersection Sight distance to/from Sight distance to/from south
Location north
Access 240m 96m (160m possible)
(impeded by overgrown vegetation)
The proposed/existing access location complies with the requirements for a design
speed of 90km/h to and from the west, however sight visibility to the east is
constrained by vegetation and the verge embankment. With vegetation removal and
benching the EDD criteria for 90km/h can be met, to comply with requirements for an
access.
Page 13
Page 14
Traffic Impact Assessment Report
Wedding Venue, Ringtail Creek
For Louis Bazzo Pty Ltd
June 2024
This is considered acceptable, as the extended design domain (EDD) can be applied
where new or existing accesses are being retrofitted on existing roads in constrained
locations. It should be noted that the access will not necessarily function as an
intersection but rather as a driveway and it will not generate significant traffic flows.
The provision of the BAL treatment will also aid in improving sight lines significantly.
Photo 2 – View East from Access
Clearing
vegetation
will improve
sight lines
Photo 3 – View West from Access
Page 14
Page 15
Traffic Impact Assessment Report
Wedding Venue, Ringtail Creek
For Louis Bazzo Pty Ltd
June 2024
7 PARKING ARRANGEMENTS
An assessment of parking has been undertaken in accordance with the Council’s
Planning Scheme Code and also compliance with Australian Standards for Off Street
Parking Facilities AS2890.1:2004.
7.1 Noosa Council Requirements
The requirements for parking are provided in Table 9.4.1.4 of the Transport and
Parking Cold of the Planning Scheme. The parking requirements for a function facility
are:
1 space per 20m2 of use area.
The proposal includes 55 car parking spaces and 4 staff bays for a use area of 300m2
for the marque. Therefore, based on Council requirements the proposal requires 15
car parking spaces. The site includes 59 parking spaces including one PWD space and
2 coach bays. Therefore, the proposed on-site visitor parking is considered acceptable.
Table 5 – Car Parking Estimated for Events and Functions
7.2 Australian Standards AS2890.1 Requirements
The parking requirements outlined in AS2890.1:2004 Off-street car parking for the
proposed development requires facilities for medium term car parking identified as
User Class 2. Dimensions for car parking spaces are outlined in Figure 2.2 of AS2890.1.
Minimum requirements for 90 degree angle parking bays include a minimum width of
2.5m, length of 5.4m and aisle width of 5.8m.
The proposed parking spaces are 2.5m wide with a length of 5.4m and aisle widths of
6.0m and 6.7m, complying with AS2890 requirements.
Page 15
Page 16
Traffic Impact Assessment Report
Wedding Venue, Ringtail Creek
For Louis Bazzo Pty Ltd
June 2024
8 CONCLUSIONS
This report has assessed the impact of traffic generated by the development site on
the external road network. Consideration has been given to access, parking and
operational performance.
An assessment was carried out of the trips likely to be generated by the proposed
development and the estimated distribution of trips on the existing street network.
The impact of the proposed development on the street network has been analysed
using procedures set out in Austroads for assessing unsignalised intersections. The
proposed intersection with Louis Bazzo Drive will operate under uninterrupted flow
conditions.
The access meets the warrants for a basic right and a basic left turn treatment. The
access with Lous Bazzo Drive has adequate sight visibility which will be improved with
the provision of the basic left turn treatment. The provided car parking within the site
is considered acceptable and suitable or the proposed development.
In conclusion, the proposed development will not adversely impact on the
operational performance of the surrounding road network and is considered
adequate for the proposed land use.
Page 16
Page 17
Traffic Impact Assessment Report
Wedding Venue, Ringtail Creek
For Louis Bazzo Pty Ltd
June 2024
Appendix A
Proposed Development Concept Plans
Provided by Blackburn Jackson
Page 17
Page 18
PROPOSAL SUMMARY
LOT 4 ON RP160124
LOCAL AUTHORITY : NOOSA SHIRE COUNCIL
LOCALITY : RINGTAIL CREEK
SITE AREA : 99.9HA
PROJECT USAGE BREAKDOWN :
WEDDING VENUE :
150 pax FUNCTION MARQUEE = 300m2
CANAPES TERRACE = 221m2
COCKTAILS TERRACE = 287m2
JETTY = 41m2
AMENITIES = 20m2
CATERING = 18m2
STORAGE CONTAINER = 30m2
REFUSE = 13m2
TOTAL = 930m2
ON-SITE PARKING PROVISIONS
CAR PARKING : PROPOSED
WEDDING VENUE : STAFF CAR PARKS = 04
PATRON CAR PARKS = 55
COACH PARKS = 02
SUBJECT SITE TOTAL WEDDING VENUE PARKING PROVIDED: = 59
SERVICE VEHICLE PROVISIONS
SERVICE VEHICLES : PROPOSED
VAN = 01
NOTES :
- ALL CAR PARKING IN ACCORDANCE WITH AS2890.1
- ALL BICYCLE PARKS IN ACCORDANCE WITH AS 2890.3
- BICYCLE STORAGE AS SHOWN
- MINIMUM TYPICAL DIMENSIONS
01 SITE LOCATION
1:5000
PROPOSED WEDDING VENUE, LOUIS BAZZO PTY LTD DEVELOPMENT APPROVAL north
scale : 1:5000 @A1 1:10000@A3
issue : 04 date : 24-06-24
658 LOUIS BAZZO DRIVE, RINGTAIL CREEK LOCATION PLAN & SUMMARY 5785-DA01
A R CHIT E CT UR E | L A NDS CA P E | INT E R IOR | P ROJECT MA NA G E ME NT
5785 27 Louis Bazzo Polo Weddings.pln Tuesday, 25 June 2024 2:40 pm The designs, drawings and specification are copyright and always remain the property of Blackburne Jackson Design Pty Ltd.
GSPublisherVersion 1550.0.64.0
Page 19
7°4930
720|242
PP
PP
PP
A
PP
225|871
97°4340
GATE
L
O
U
GATE
IS
18.0m OF ROAD AT
B
MIN. 6.0m WIDE
A
Z Z
*
O
D R I
V E
81|839
97°4350
* *
GATE
293° |401
1115
2040
* *
97°5120
350|36
MASTERPLAN LEGEND
D A EXISTING MACHINERY SHED
PP
B C
B EXISTING DAM
C 10m x 30m WEDDING MARQUEE
D 15m x 20m LEVEL AREA & OVER WATER DECK
* EXISTING PROPERTY ACCESS TO BE RETAINED
NOTE: 18.0m LENGTH FROM ENTRY TO BE min 6.0m WIDE
* APPROACHES TO BEND min. 6.0m WIDE
INTERNAL ROAD - TYP 5.5m WIDE
351|416
97°5145
INTERNAL MAINTENANCE ROAD - TYP 3.5m WIDE
NOTE: PASSING LANES TO BE PROVIDED AT APPROX. 30.0m SPACINGS
PROPOSED SERVICE ROAD - TYP 3.0m WIDE
1019|017
187°4730
FIRE EGRESS ROAD - TYP 3.5m WIDE
POTABLE WATER SUPPLY 2 x 2300L
01 SITE MASTER PLAN 01
1:2500
PROPOSED WEDDING VENUE, LOUIS BAZZO PTY LTD DEVELOPMENT APPROVAL north
scale : 1:2500 @A1 1:5000 @A3
issue : 04 date : 24-06-24
658 LOUIS BAZZO DRIVE, RINGTAIL CREEK SITE MASTER PLAN 5785-DA02
A R CHIT E CT UR E | L A NDS CA P E | INT E R IOR | P ROJECT MA NA G E ME NT
5785 27 Louis Bazzo Polo Weddings.pln Tuesday, 25 June 2024 2:40 pm The designs, drawings and specification are copyright and always remain the property of Blackburne Jackson Design Pty Ltd.
GSPublisherVersion 1550.0.64.0
Page 20
26
95.0
00
25
AL
PIC 2500
TY
00
25
54
00
00 21
25
93.5 EXISTING ORCHARD
67
00
S
RK
41
A
P L
54
AR AVE 2
00
5 C R 93.0
5 G m 5
1 29
GRAVEL ACCESS ROAD
92.5 C1 C2 C3 C4
REFUSE
STAFF CAR PARKS
REFUSE
12
54m2
229 m2 300 m2
CANAPES TERRACE WEDDING MARQUEE
92.0 92.050 RL 92.100 40FT STORAGE CONTAINER
02
H
G OAC
IN C GEN
RK
55 PA
ACH
CO 91.5 UP UP
287 m2
COCKTAILS TERRACE
01
H RL 91.200
OAC
01
C 91.0 RL 91.200
90.5
90.0
89.5
JETTY
RL 89.550
EXISTING DAM
01 SITE PLAN WEDDING VENUE
1:200
PROPOSED WEDDING VENUE, LOUIS BAZZO PTY LTD DEVELOPMENT APPROVAL north
scale : 1:200 @A1 1:400@A3
issue : 04 date : 24-06-24
658 LOUIS BAZZO DRIVE, RINGTAIL CREEK SITE PLAN - WEDDING VENUE 5785-DA03
A R CHIT E CT UR E | L A NDS CA P E | INT E R IOR | P ROJECT MA NA G E ME NT
5785 27 Louis Bazzo Polo Weddings.pln Tuesday, 25 June 2024 2:40 pm The designs, drawings and specification are copyright and always remain the property of Blackburne Jackson Design Pty Ltd.
GSPublisherVersion 1550.0.64.0
Page 21
A
DA06
DOUBLE TRAILER
WITH 2 x SEWER
CONNECT TOILETS
DOUBLE TRAILER
WITH 2 x SEWER
CONNECT TOILETS
93.0 1:2 BATTER
6000
GRAVEL ACCESS ROAD
30000
2500 2500 2500 2500
92.5
C1 C2 C3 C4
STAFF CAR PARKS
5400
REFUSE
54m2
REFUSE
10000
PEDESTRIAN PATH CATERING
CANAPES TERRACE WEDDING MARQUEE
92.0 92.050 RL 92.100 40FT STORAGE CONTAINER
DECO GRANITE
1 :2 0
WAY
WALK
GENERATOR
RL 91.625
RL 92.050
GARDEN GARDEN GARDEN
91.5 UP UP
W
1:3 BATTER 800H TIMBER SLEEPER 800H TIMBER SLEEPER
1: KWA
AL
20 Y
RETAINING WALL RETAINING WALL
COCKTAILS TERRACE 1:3 BATTER
RL 91.200
DECO GRANITE
RL 91.200
91.0
1:3 BATTER
RL 90.250
90.5
1:20
90.0 WALKWAY
89.5
RL 89.750
JETTY
RL 89.550
01 FLOOR PLAN WEDDING VENUE
1:100
PROPOSED WEDDING VENUE, LOUIS BAZZO PTY LTD DEVELOPMENT APPROVAL north
scale : 1:100 @A1 1:200 @A3
issue : 04 date : 24-06-24
658 LOUIS BAZZO DRIVE, RINGTAIL CREEK FLOOR PLAN - WEDDING VENUE 5785-DA04
A R CHIT E CT UR E | L A NDS CA P E | INT E R IOR | P ROJECT MA NA G E ME NT
5785 27 Louis Bazzo Polo Weddings.pln Tuesday, 25 June 2024 2:40 pm The designs, drawings and specification are copyright and always remain the property of Blackburne Jackson Design Pty Ltd.
GSPublisherVersion 1550.0.64.0
Page 22
8.0m HEIGHT LIMIT
GENERATOR
MARQUEE APEX
RL 96.745
1445
MARQUEE PITCH
RL 95.300
3200
EXISTING GROUND LINE
CONTAINER
RECEPTION LEVEL
RL 92.100
PROPOSED GROUND LINE
01 NORTH-WEST ELEVATION
1:100
8.0m HEIG
HT LIMIT
HEIGHT LIMIT
8.0m
EXISTING GROUND LINE
EXISTING GROUND LINE
MARQUEE APEX CONTAINER DASHED FOR CLARITY
RL 96.745
1645
MARQUEE PITCH
RL 95.100
ACCESS ACCESS
PROPOSED GROUND LINE
3000
ROAD PROPOSED GROUND LINE ROAD
CANAPE TERRACE
RECEPTION LEVEL
RL 92.100
02 SOUTH-WEST ELEVATION 03 NORTH-EAST ELEVATION
1:100 1:100
8.0m HEIGHT LIMIT
8.0m HIGH TIMBER SLEEPER RETAINING WALL
MARQUEE APEX
RL 96.745
1445
GENERATOR
MARQUEE PITCH
RL 95.300
3200
EXISTING GROUND LINE PROPOSED GROUND LINE
CONTAINER
RECEPTION LEVEL
RL 92.100
04 SOUTH-EAST ELEVATION
1:100
PROPOSED WEDDING VENUE, LOUIS BAZZO PTY LTD DEVELOPMENT APPROVAL north
scale : 1:100 @A1 1:200 @A3
issue : 04 date : 24-06-24
658 LOUIS BAZZO DRIVE, RINGTAIL CREEK ELEVATIONS 5785-DA05
A R CHIT E CT UR E | L A NDS CA P E | INT E R IOR | P ROJECT MA NA G E ME NT
5785 27 Louis Bazzo Polo Weddings.pln Tuesday, 25 June 2024 2:40 pm The designs, drawings and specification are copyright and always remain the property of Blackburne Jackson Design Pty Ltd.
GSPublisherVersion 1550.0.64.0
Page 23
TOILETS
20 m2
REFUSE - 13m2
FUNCTION MARQUEE
300 m2
CANAPES TERRACE
221 m2 STORAGE CONTAINER
30 m2
CATERING - 18m2
COCKTAILS TERRACE
287 m2
AREAS
CATERING = 18m2
REFUSE = 13m2
STORAGE CONTAINER = 30m2
JETTY
41 m2
AMENITIES = 20m2
COCKTAILS TERRACE = 287m2
CANAPES TERRACE = 221m2
FUNCTION MARQUEE = 300m2
JETTY = 41m2
01 GENERAL AREAS
1:200
PROPOSED WEDDING VENUE, LOUIS BAZZO PTY LTD DEVELOPMENT APPROVAL north
scale : 1:200 @A1 1:400 @A3
issue : 02 date : 24-06-24
658 LOUIS BAZZO DRIVE, RINGTAIL CREEK GROSS FLOOR AREA 5785-DA17
A R CHIT E CT UR E | L A NDS CA P E | INT E R IOR | P ROJECT MA NA G E ME NT
5785 27 Louis Bazzo Polo Weddings.pln Tuesday, 25 June 2024 2:40 pm The designs, drawings and specification are copyright and always remain the property of Blackburne Jackson Design Pty Ltd.
GSPublisherVersion 1550.0.64.0
Page 24
Traffic Impact Assessment Report
Wedding Venue, Ringtail Creek
For Louis Bazzo Pty Ltd
June 2024
Appendix B
Proposed SDAP Codes
Page 18
Page 25
Performance outcomes Acceptable outcomes Response
Transport and Main Roads, 2017, for further guidance on how to
comply with this performance outcome.
PO13 Run-off from the development site is not AO13.1 Development does not create any new
unlawfully discharged to a state-controlled road. points of discharge to a state-controlled road.
Note: Refer to the SDAP Supporting Information: Stormwater and AND
drainage in a state-controlled road environment, Department of
Transport and Main Roads, 2017, for further guidance on how to AO13.2 Stormwater run-off is discharged to a lawful
comply with this performance outcome. point of discharge.
Note: Section 3.9 of the Queensland Urban Drainage Manual,
Institute of Public Works Engineering Australasia (Queensland
Division) Fourth Edition, 2016, provides further information on
lawful points of discharge.
AND
AO13.3 Development does not worsen the condition
of an existing lawful point of discharge to the state-
controlled road.
PO14 Run-off from the development site during AO14.1 Run-off from the development site during
construction does not cause siltation of stormwater construction is not discharged to stormwater
infrastructure affecting a state-controlled road. infrastructure for a state-controlled road.
Note: Refer to the SDAP Supporting Information: Stormwater and
drainage in a state-controlled road environment, Department of
Transport and Main Roads, 2017, for further guidance on how to
comply with this performance outcome.
Vehicular access to a state-controlled road
PO15 Vehicular access to a state-controlled road AO15.1 Development does not require new or NA – Louis Bazzo Drive is not a limited access road
that is a limited access road is consistent with changed access to a limited access road.
government policy for the management of limited Note: Limited access roads are declared by the transport chief
access roads. executive under section 54 of the Transport Infrastructure
Act 1994 and are identified in the DA mapping system.
Note: Refer to the SDAP Supporting Information: Vehicular
access to a state-controlled road, Department of Transport and OR
State Development Assessment Provisions – version 2.6
State code 1: Development in a state-controlled road environment Page 5 of 19
Page 26
Performance outcomes Acceptable outcomes Response
Main Roads, 2017, for further guidance on how to comply with AO15.2 A new or changed access to a limited Not Applicable
this performance outcome.
access road is consistent with the limited access
policy for the state-controlled road.
Note: Limited access policies for limited access roads declared
under the Transport Infrastructure Act 1994 can be obtained by
contacting the relevant Department of Transport and Main Roads
regional office.
AND
AO15.3 Where a new or changed access is for a Not Applicable
service centre, access is consistent with the Service
centre policy, Department of Transport and Main
Roads, 2013 and the Access policy for roadside
service centre facilities on limited access roads,
Department of Transport and Main Roads, 2013,
and the Service centre strategy for the state-
controlled road.
Note: The Service centre policy, Department of Transport and
Main Roads, 2013, Access policy for roadside service centre
facilities, Department of Transport and Main Roads, 2013 and the
relevant Service centre strategy for a state-controlled road can be
accessed by contacting the relevant Department of Transport and
Main Roads regional office.
PO16 The location and design of vehicular access to AO16.1 Vehicular access is provided from a local Not Applicable
a state-controlled road (including access to a limited road.
access road) does not create a safety hazard for OR all of the following acceptable outcomes apply: Complies.
users of a state-controlled road or result in a
worsening of operating conditions on a state- There is an existing access driveway which will be
controlled road. AO16.2 Vehicular access for the development is upgraded with a BAR and BAL treatment. Refer to
consistent with the function and design of the state- Traffic Report.
Note: Where a new or changed access between the premises
and a state-controlled road is proposed, the Department of controlled road.
Transport and Main Roads will need to assess the proposal to
AND
State Development Assessment Provisions – version 2.6
State code 1: Development in a state-controlled road environment Page 6 of 19
Page 27
Performance outcomes Acceptable outcomes Response
determine if the vehicular access for the development is safe. An AO16.3 Development does not require new or The access meets the warrants for a BAR and BAL
assessment can be made by Department of Transport and Main
changed access between the premises and the turn treatment and will be upgraded. Refer to Traffic
Roads as part of the development assessment process and a
decision under section 62 of Transport Infrastructure Act 1994 state-controlled road. Report.
issued. Note: A decision under section 62 of the Transport Infrastructure
Refer to the SDAP Supporting Information: Vehicular access to a Act 1994 outlines the approved conditions for use of an existing
state-controlled road, Department of Transport and Main Roads, vehicular access to a state-controlled road. Current section 62
2017, for further guidance on how to comply with this decisions can be obtained from the relevant Department of
performance outcome. Transport and Main Roads regional office.
AND
AO16.4 Use of any existing vehicular access to the Complies
development is consistent with a decision under
section 62 of the Transport Infrastructure Act 1994.
Note: The development which is the subject of the application
must be of an equivalent use and intensity for which the section
62 approval was issued and the section 62 approval must have
been granted no more than 5 years prior to the lodgement of the
application.
AND
AO16.5 On-site vehicle circulation is designed to Complies
give priority to entering vehicles at all times so
vehicles do not queue in a road intersection or on
the state-controlled road.
Vehicular access to local roads within 100 metres of an intersection with a state-controlled road
PO17 The location and design of vehicular access to AO17.1 Vehicular access is located as far as Not Applicable
a local road within 100 metres of an intersection with possible from the state-controlled road intersection.
a state-controlled road does not create a safety AND
hazard for users of a state-controlled road.
AO17.2 Vehicular access is in accordance with Complies
Note: Refer to the SDAP Supporting Information: Vehicular parts, 3, 4 and 4A of the Road Planning and Design
access to a state-controlled road, Department of Transport and Manual, 2nd Edition: Volume 3, Department of
Main Roads, 2017, for further guidance on how to comply with
Transport and Main Roads, 2016.
this performance outcome.
AND
State Development Assessment Provisions – version 2.6
State code 1: Development in a state-controlled road environment Page 7 of 19
Page 28
Performance outcomes Acceptable outcomes Response
AO17.3 On-site vehicle circulation is designed to Complies
give priority to entering vehicles at all times so
vehicles do not queue in the intersection or on the
state-controlled road.
Public passenger transport infrastructure on state-controlled roads
PO18 Development does not damage or interfere AO18.1 Vehicular access and associated road Complies
with public passenger transport infrastructure, public access works are not located within 5 metres of
passenger services or pedestrian or cycle access to existing public passenger transport infrastructure.
public passenger transport infrastructure and public AND
passenger services.
AO18.2 Development does not necessitate the Complies
relocation of existing public passenger transport
Note: Refer to the SDAP Supporting Information: Vehicular infrastructure.
access to a state-controlled road, Department of Transport and
Main Roads, 2017, for further guidance on how to comply with AND
this performance outcome. AO18.3 On-site vehicle circulation is designed to Complies
give priority to entering vehicles at all times so
vehicles using a vehicular access do not obstruct
public passenger transport infrastructure and public
passenger services or obstruct pedestrian or cycle
access to public passenger transport infrastructure
and public passenger services.
AND
AO18.4 The normal operation of public passenger Complies
transport infrastructure or public passenger services
is not interrupted during construction of the
development.
Planned upgrades
State Development Assessment Provisions – version 2.6
State code 1: Development in a state-controlled road environment Page 8 of 19
Page 29
Performance outcomes Acceptable outcomes Response
PO19 Development does not impede delivery of AO19.1 Development is not located on land Complies
planned upgrades of state-controlled roads. identified by the Department of Transport and Main
Roads as land required for the planned upgrade of a
state-controlled road.
Note: Land required for the planned upgrade of a state-controlled
road is identified in the DA mapping system.
OR
AO19.2 Development is sited and designed so that Complies
permanent buildings, structures, infrastructure,
services or utilities are not located on land identified
by the Department of Transport and Main Roads as
land required for the planned upgrade of a state-
controlled road.
OR all of the following acceptable outcomes apply: Not Applicable
AO19.3 Structures and infrastructure located on
land identified by the Department of Transport and
Main Roads as land required for the planned
upgrade of a state-controlled road are able to be
readily relocated or removed without materially
affecting the viability or functionality of the
development.
AND
AO19.4 Vehicular access for the development is NA
consistent with the function and design of the
planned upgrade of the state-controlled road.
AND
AO19.5 Development does not involve filling and NA
excavation of, or material changes to, land required
for a planned upgrade to a state-controlled road.
AND
AO19.6 Land is able to be reinstated to the pre- NA
development condition at the completion of the use.
State Development Assessment Provisions – version 2.6
State code 1: Development in a state-controlled road environment Page 9 of 19
Page 30
Performance outcomes Acceptable outcomes Response
Network impacts
PO20 Development does not result in a worsening No acceptable outcome is prescribed. Complies – Refer to TIA Report
of operating conditions on the state-controlled road
network.
Note: To demonstrate compliance with this performance outcome,
it is recommended that an RPEQ certified traffic impact
assessment is provided. Please refer to the Guide to Traffic
Impact Assessment, Department of Transport and Main Roads,
2017, for further guidance on how to comply with this
performance outcome.
PO21 Development does not impose traffic loadings AO21.1 The layout and design of the development Not Applicable
on a state-controlled road which could be directs traffic generated by the development to the
accommodated on the local road network. local road network.
PO22 Upgrade works on, or associated with, a AO22.1 Upgrade works required as a result of the Not Applicable
state-controlled road are built in accordance with development are designed and constructed in
Queensland road design standards. accordance with the Road Planning and Design Manual,
2nd edition, Department of Transport and Main
Roads, 2016.
Note: Road works in a state-controlled road require approval
under section 33 of the Transport Infrastructure Act 1994 before
the works commence.
Table 1.2.2: Environmental emissions
Statutory note: Where a state-controlled road is co-located in the same transport corridor as a railway, the development should instead comply with table 2.2.2:
Environmental emissions in State code 2: Development in a railway environment.
Refer to the SDAP Supporting Information: Environmental emissions in a state-controlled road environment, Department of Transport and Main Roads, 2017, for
further guidance on how to comply with the performance outcomes in Table 1.2.2.
Performance outcomes Acceptable outcomes
Noise
Accommodation activities
State Development Assessment Provisions – version 2.6
State code 1: Development in a state-controlled road environment Page 10 of 19