Original source · versioned page text
8. Appendix D - Traffic Engineering Report
Traffic Impact Assessment Report
Wedding Venue, Ringtail Creek
For Louis Bazzo Pty Ltd
June 2024
8 CONCLUSIONS
This report has assessed the impact of traffic generated by the development site on
the external road network. Consideration has been given to access, parking and
operational performance.
An assessment was carried out of the trips likely to be generated by the proposed
development and the estimated distribution of trips on the existing street network.
The impact of the proposed development on the street network has been analysed
using procedures set out in Austroads for assessing unsignalised intersections. The
proposed intersection with Louis Bazzo Drive will operate under uninterrupted flow
conditions.
The access meets the warrants for a basic right and a basic left turn treatment. The
access with Lous Bazzo Drive has adequate sight visibility which will be improved with
the provision of the basic left turn treatment. The provided car parking within the site
is considered acceptable and suitable or the proposed development.
In conclusion, the proposed development will not adversely impact on the
operational performance of the surrounding road network and is considered
adequate for the proposed land use.
Page 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.