Original source · versioned page text
9.5.22 Bushfire Hazard Assessment Management Plan v2 - 60 Glenridge Drive COOROIBAH
Original PDF page 41, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn LEGEND
THE SITE
EDGE OF PROPOSED COVENANT
APPROX. FIRE BREAK TRAIL ALIGNMENT
20m total width per SPP 2019
APPROX. REQUIRED LOCATION OF GATE
Specs: minimum 4m wide swing gate
Plate B - SPP
Bushfire 2019 Fire
Break Trail design
paramters 0 15 30 45 60 75 150
(Source: State Planning Policy - Natural Metres
hazards, risk and resilience - Bushfire 2019
Plate A - Fire Break Trail Plan outline (Source: Site Plan) (A3) 1:3000
Table 4)
Plate C - Assumed
composition of
Fire Break Trail
(Source: Planning for Bush Protection, 2006)
PROJECT TITLE: CLIENT: TITLE: JOB: PLAN: REV: NORTH:
PO Box 9566 Pacific Paradise, Qld, 4564 FIRE BREAK TRAIL SPECIFICATIONS
P: 07 5450 5984
FIRE BREAK TRAIL PLAN MARK BAIN CONSTRUCTIONS B VERSION 2 06-05-2022 JI JL
J001001 FB01 B
ABN: 60 625 108 625 A PRELIMINARY 16-02-2022 JI JL SCALE: 1:3000 @ A3
60 GLENRIDGE DRIVE, COOROIBAH COPYRIGHT © 2021 NCES. THIS DOCUMENT MAY NOT BE COPIED OR TRANSMITTED IN ANY FORM OR BY ANY
MEANS IN PART OR IN WHOLE WITHOUT THE WRITTEN CONSENT OF NCES.
ISSUE DETAILS DATE INIT CHK'D
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.