Council archive · source document
Operational Works Application PS17-0585 · OPW17/0585
Department of Infrastructure, Local Government and Planni
42) Boundary, realignment
12.1),What are the current and proposed areas for. each lot comprising the premises?.
Current lot Proposed lot
Lot on plan description Area (m2) Lot on plan description Area (m?)
42:2) Whatis the reason for the boundary realignment?
13) What are the dimensions and nature of any. existing easements being changed and/or any proposed easement?
(attach schedule if there are more.than two easements)
Existing or Width (m) | Length(m) | Purpose of the easement? (e.g. Identify the land/lot(s)
proposed? pedestrian access) benefitted by the easement
5
ao
Division 3 — Operational work
Note: This division is only required to be completed if an'
AED AMM ara alo allele ey nuaics(e)eleecit ear (ela ta
(J Road work (7 Stormwater CJ Water infrastructure
(J Drainage work ( Earthworks (] Sewage infrastructure
( Landscaping O Signage L Clearing vegetation
Other — please specify: | pLLYVEWAY
part of the development application involves operational work.
14.2) |Is:the operational work necessary to facilitate the:creation of new lots? (e.g, subdivision)
C1 Yes — specify number of new lots:
LI No
14:3).What is.the monetary. value of the proposed operational work? (include GST, materials and labour)
$
ART 4 — ASSESSMENT MANAGER DETAILS
15) Identify the assessment manager(s) who will be assessing this development application
Nosta Coornct &
16) Has the local government agreed to apply a Superseded planning scheme for this development application?
(Yes — a copy of the decision notice is attached to this development application
LJ Local government is taken to have agreed to the superseded planning scheme request — relevant documents
attached
[No
PART 5 — REFERRAL DETAILS
17) Do’any aspects, of the proposed development require referral for any referral requirements?
Note: A development application will require referral if prescribed by the Planning Regulation 2017.
No, there are no referral requirements relevant to any development aspects identified in this development
application — proceed to Part 6
Matters requiring referral to the chief executive of the Planning Regulation 2017:
C1 Clearing native vegetation
CJ Contaminated land (unexploded ordnance)
Page 5
DA Form 1 — Development Application details
Version 1.0—3 July 2017
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Operational Works Application PS17-0585.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.