132009.103.02 - Change to Approval
Officer: Glen Conforti Direct Telephone: 53296241 Our Reference: 132009.103.02: Your Reference: N/A 23 January 2015 Mr JF O'Brien, THM O'Brien C/- Suncoast Building Approvals PO Box 1054 MAROOCHYDORE QLD 4558 Dear Sir/Madam Change to an Existing Approval Sustainable Planning Act 2009 I refer to your request to make a permissible change to an existing approval. On 23 January 2015, Council decided your requested changes. Details of the decision are as follows: application details Application No: 132009.103.02 (09/0103) Street Address: 61 Orient Drive Sunrise Beach Qld 4567 Real Property Description: Lot 96 N 21838 Planning Scheme: The Noosa Plan (16 September 2013) Decision details Council on 24 March 2009 decided to issue the following type of approval: Development Permit for Material Change of Use (Detached House) In relation to the request to make a change to the existing approval, Council decided to: A. Approve a change to condition 1. B. Include an additional condition (Condition 19). C. Delete condition 7. relevant period of approval The relevant period for this development approval is in accordance with that stated in the Decision Notice dated 24 March 2009, unless an application to extend the period is approved by Council under s 383 of the Sustainable Planning Act 2009. CONSOLIDATED ASSESSMENT MANAGER CONDITIONS Development undertaken in accordance with this approval must generally comply with the approved plans of development: - Plan No. Rev. Plan / Document Name Date WD.101 PBA Cover Sheet, prepared by aboda design group 19.11.14 WD.201 PBA Subfloor Plan, prepared by aboda design group 19.11.14 WD.202 PBA Ground Floor Plan, prepared by aboda design group as annotated by Council 19.11.14 WD.203 PBA Roof Plan, prepared by aboda design group 19.11.14 WD.501 PBA Elevations, prepared by aboda design group 19.11.14 WD.502 PBA Elevations, prepared by aboda design group 19.11.14 WD.503 PBA Boundary Elevations, prepared by aboda design group 19.11.14 The development must be undertaken and operated in a manner that causes no detrimental effect upon the amenity of the neighbourhood by reason of the creation of excessive noise, lighting nuisance or other emissions. Earthworks required on site shall be carried out in accordance with Council’s Planning Scheme Policy PSP5 – Engineering Design Standards, so as not to cause the additional ponding of water on any adjoining lands or concentrate or direct overland flow on to an adjoining property. All hot water systems installed shall be either solar systems; electric heat pump systems; or gas systems (LPG or natural). The building height shall not exceed 8.0 metres above natural ground level and finished ground level. A verification survey of the building is to be carried out by a Licensed Surveyor and a certificate lodged with Council at completion of work confirming compliance with the maximum allowable building height as required by either the conditions of approval or the Planning Scheme. Deleted. Dense landscaping, comprising a mix of native coastal species of ground cover, shrubs and trees shall be provided to the full length of the rear boundary for a width of 2m and planted in accordance with Council’s Landscaping Guidelines. A minimum of 20% of the site shall be retained as soft landscaping. The Cabbage Palm to the north east corner of the lot shall be protected from interference resulting construction activities by: 10.1 Clearly marking the palm to be retained with flagging tape; 10.2 Installing protective fencing around the drip line of the palm; 10.3 Stockpiling and storage occurs in already cleared areas and does not cause interference with the palm; and 10.4 Low impact construction techniques are used around the palm. The Norfolk Island pine tree removed from the site shall be replaced with two (2) 100lt Banksia species planted in the footpath reserve to the front of the lot in accordance with Council’s Landscaping Guidelines. Cleared vegetation is to be suitably processed by one of the following methods and removed from the site:- 12.1 Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled loose in heaps less than 2.5 metres high. 12.2 Disposal for firewood. 12.3 Disposal for landscaping purposes. 12.4 The Applicant is advised that other methods may be considered provided full details of the method are submitted. 12.5 The applicant is advised that burning off is an unacceptable method of disposal. Buildings and structures (including swimming pools, sheds, tennis courts or outbuildings) shall not be constructed under overhead electricity transmission lines, or within any easements. External colours and finishes of the building shall comprise of muted/environmental tones that blend with the natural environment. Gates must not be installed along the rear property boundary. Sediment and erosion control measures must be in place prior to building works. If such measures are not in place or are not satisfactory, ‘on the spot’ fines may be issued. Such fines can be issued if sediments from the site are found to enter or have the potential to enter Council’s stormwater system or natural waterways. Security in the form of a cash bond or trading bank guarantee to the sum of $2500.00 must be submitted, to secure performance of all conditions of this approval, prior to the issue of a Development Permit for building works. The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit. Relevant Period The Development Permit for a material change of use lapses if the use has not happened by 24 March 2017, unless an application to extend the relevant period is approved by Council. Additional Condition (23/1/2015) Finished surface levels within the 1.5m side setbacks shall not exceed 1 metre above the NGL. referral agency conditions The referral agencies applicable to this application are: Referral Trigger Referral Status Referral Agency and Address Site in an area where management advice has been given for unexploded ordnance Concurrence Environmental Protection Agency Eco access Customer Service Centre PO Box 15155 CITY EAST QLD 4002 A copy of any referral agency conditions is attached. The following Advisory Notes are for information purposes only and do not form conditions of approval: The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999 and Local Law No. 12, prevents a builder or building contractor carrying out building work on a building site in a way that makes or causes audible noise to be made from the building work:- On a Sunday or public holiday, at any time; or On a Saturday or a business day, before 7.00am or after 6.30pm. A maximum penalty of $1,500 applies to an offence under this legislation. Prior to the commencement of the development, a plumbing assessment must be obtained from Noosa Council’s Plumbing Services Section in accordance with the Plumbing & Drainage Act 2002 (as applicable). Aboriginal Cultural Heritage Act 2003 There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act). The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage. You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any obligations under the ACH Act. property notes Not Applicable PRELIMINARY APPROVAL OVERRIDING PLANNING SCHEME Not Applicable FURTHER DEVELOPMENT PERMITS REQUIRED Development Permit for Building Works (All Building Works) SELF ASSESSABLE CODES The following codes for self-assessable development related to the development approval issued under this Decision Notice must be complied with. Detached House Driveways Code SUBMISSIONS Not Applicable REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME Not Applicable RIGHTS OF APPEAL You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Sustainable Planning Act 2009 is attached. OTHER DETAILS If you wish to obtain more information about Council’s decision, electronic copies of which are available on line at www.noosa.qld.gov.au, or at Council offices. DECISION NOTICE HISTORY Original Decision Notice 24 March 2009) Changes to an Existing Approval 3 May 2013 Changes to an Existing Approval 23 January 2015 with an amendment to Condition 1, the deletion of Condition 7 and an additional Condition 19. Yours faithfully Glen Conforti Development Planner Encl. Approved Plans/Documents Appeal Rights cc Unitywater Appeal Rights SUSTAINABLE PLANNING ACT 2009 & SUSTAINABLE PLANNING REGULATION 2009 The following is an extract from the Sustainable Planning Act 2009 (Chapter 7) 466 Appeals about decisions relating to permissible changes (1) For a development approval given for a development application, the following persons may appeal to the court against a decision on a request to make a permissible change to the approval— (a) if the responsible entity for making the change is the assessment manager for the application— (i) the person who made the request; or (ii) an entity that gave a notice under section 373 or a pre-request response notice about the request; (b) if the responsible entity for making the change is a concurrence agency for the application—the person who made the request. (2) The appeal must be started within 20 business days after the day the person is given notice of the decision on the request under section 376. (3) Also, a person who has made a request under section 369 may appeal to the court against a deemed refusal of the request. (4) An appeal under subsection (3) may be started at any time after the last day the decision on the matter should have been made. [word/footer1.xml] Page 5 of 6 [word/footer2.xml] PO Box 141 P. (07) 5329 6500 [email protected] TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qld.gov.au Page 1 of 6 [word/header3.xml] 132009.103.02 [Attachment: image4.png (image text)] a mm NOOSA COUNCIL
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
132009.103.02 - Change to ApprovalRelated documentApplication case desk ↗
About this file
- File size
- 98 KB (small file)
- File type
- DOCX
No other editions are linked here.