Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

Delegated Report - Code - Planning OPW21 0002

of 1

Page text shows just the words. Original shows the document exactly as it was published.

Author	Development Engineer, Diogo Carrico
Development Assessment

APPLICATION DETAILS
Application No.	OPW21/0002
Applicant	Neil James Cassidy
Proposal	Operational Works – Vehicle Crossover
Properly Made Date	4 January 2021
Information Request Date	13 January 2021
Information Response Date	14 April 2021
Decision Due Date	9 June 2021
Report Completed Date	20/04/2021
Report Reviewed By	Mark Lewis

PROPERTY DETAILS
Property Address	17 Urunga Pde Boreen Point Qld 4565
RP Description	Lot 100 RP 59216
Land Area	506 m²
Existing Use of Land	Residential

STATUTORY DETAILS
SEQRP Designation	Urban Footprint
Zone	Low Density Residential
Precinct	Not Applicable
Local Plan Area	Not Applicable
Overlays	Acid Sulphate Soils; Landslide Hazard (Moderate); Flood Hazard (minor)
Assessment Type	Code
PROPOSAL
The application seeks approval for Operational Works – Vehicle Crossover.
The locality and proposal plan are included below.
Figure 1 – Proposed Plan
site details
Background
Applicant seeks to construct a second driveway to access a new (approved) shed at the back of the subject property. The access is steep but the grades shown on the proposal plan have been approved by an RPEQ and the steepest sections/transitions are over 5m away from Urunga Pde’s road formation (i.e. with no potential for damage on Urunga Parade).
Site Description

Surrounding Land Uses

assessment
Instruments for Statutory Assessment
Under the Planning Act 2016 the application must be assessed against each of the following statutory planning instruments to the extent they are relevant to the development:
State Planning Policy;
South East Queensland Regional Plan;
Planning Regulation 2017; and
Noosa Plan 2020.
Noosa Plan 2020
The following codes from the Noosa Plan 2020 are applicable to this development:
Driveways and Parking Code.
cONSULTATION
Referral Agencies
Not Applicable
Internal Council Referrals
Not applicable
conclusion & reasons for decision
The proposed development generally complies with the requirements of the planning scheme and does not raise any significant issues that cannot be addressed by reasonable and relevant conditions. The application is therefore recommended for approval.
The report is provided in accordance with Section 63(5) of the Planning Act 2016.
RECOMMENDATION
With regard to Application No OPW21/0002 for Operational Works – Vehicle Crossover situated at 17 Urunga Pde Boreen Point Qld 4565 and described as Lot 100 RP 59216, it is recommended the application be approved in accordance with the following details for the Decision Notice:
application details
Application No:	OPW21/0002
Street address:	17 Urunga Pde Boreen Point Qld 4565
Real property description:	Lot 100 RP 59216
Planning Scheme:	Noosa Plan 2020 (25 September 2020)
Decision details
Council decided to issue the following type of approval:
Development Permit for Operational Works – Vehicle Crossover
CURRENCY PERIOD of approval
The currency period for this development approval is stated in the conditions below.
assessment manager conditions
APPROVED PLANS
Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions.
Plan No.	Rev.	Plan/Document Name	Date
21-5362AA		Plan Showing Detail Survey at Lot 100 on RP59216 Prepared by Max Watterson Annotated and approved by SCG Consulting Engineers	14/04/2021
CURRENCY PERIOD
The Currency Period for this development approval lapses if the development has not substantially started by 20 April 2023, unless an application to extend the currency period is approved by Council.
GENERAL CONDITIONS
Engineering
A condition report including photographs of the frontage of the site must be completed and submitted to Council prior to the prestart meeting.
The principal contractor must have all the appropriate insurance and public liability documentation to carry out the works. The principal contractor is also responsible to ensure that any subcontractors also have the appropriate insurance and public liability documentation. Certificates demonstrating currency of public liability insurance and works insurance covering the works must be submitted to Council prior to the prestart meeting.
Council must be contacted at least 5 working days prior to any works commencing to organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The pre-start meeting must include the relevant parties for the following aspects of the works:
Civil engineering works.
A Construction Management Plan must be submitted to Council prior to the pre-start meeting and must specifically address the following:
traffic Management during the construction phase;
appropriate traffic signage in accordance with the Manual of Uniform Traffic Control Devices (MUTCD);
provision for safe pedestrian access across the frontage of the site both during and outside working hours.
Any changes to the details associated with the supervising RPEQ or Principal Contractor during construction, must be notified to council in writing within five business days of the change occurring.
Any conflict between the development and an existing or proposed service must be referred to the relevant service authority for determination prior to commencement of works.
DURING CONSTRUCTION
Engineering
The integrity and condition of any existing public or Council infrastructure and services (above ground and/or underground) must not be adversely affected by the proposed works
The developer must meet any costs to repair damage to any Council asset during construction, where damage is a result of the development works. Damage to assets must be repaired immediately where it creates a hazard to the community. In circumstances where the damage does not create a hazard to the community, it must be repaired immediately on completion of the works associated with the development.
All works must be constructed and work procedure undertaken in accordance with:
the approved plans/documents and conditions detailed in this Decision Notice;
all relevant Noosa Council Planning Scheme Policies, standard drawings, standard specifications and guidelines;
the latest version of the Healthy Waterways document “Water Sensitive Urban Design Technical Design Guidelines for South East Queensland” for all water quality devices to be constructed on site.
Works within Road Reserves
No removal of street trees is permitted without Council’s prior written approval.
Safe pedestrian access on all streets in the vicinity of the development must be maintained at all times. Should footpath/road closures be necessary to carry out construction works, Council’s Engineering Officer must be notified prior to the proposed closure and all requirements complied with.
All works must match neatly with existing road and verge/footpath features. Additional works beyond the frontage may be required to provide an acceptable transition to existing road and verge/footpath profiles.
Driveways
Driveway crossover must be constructed generally in accordance with Council’s Standard Drawings RS-049, RS-050.
Any existing unnecessary or redundant property accesses must be removed, and the kerb, footpath and verge area reinstated to match the existing footpath and/or verge treatments. Grassed verge areas to be reinstated must be provided with 100 mm topsoil and grass seed or turf, and must be maintained by the developer until established.
The following must be complied with during the construction of the required crossover/driveway:
the driveway surfacing must consist of either an approved hot mixed asphaltic concrete or patterned/plain concrete;
the driveway must be in accordance with the requirements of AS2890.1 Off-Street Car Parking for longitudinal and crossfall gradients;
the driveway must be constructed so as to not concentrate or direct stormwater runoff onto neighbouring properties;
where there is an existing pedestrian path, a matching crossfall must be provided for the driveway on the alignment of the path, for the full width of the path;
have a minimum clearance of 500mm from any Unitywater/Energex/Telstra asset, unless a written approval is obtained from Unitywater/Energex/Telstra and submitted to Council.
any stormwater kerb outlet in close proximity to the edge of the new driveway must be provided with an approved kerb adaptor.
Pavement design for privately owned works must be undertaken in accordance with the relevant standards.  Structural integrity of the driveway and car park areas will remain the responsibility of the property owner/developer.
Stormwater Drainage
The constructed driveway must not cause additional ponding on the road formation or the road reserve.
Any proposed surface drainage grate must be located wholly within private property.
Environment (Erosion and Sediment Control)
Prescribed Water Contaminants (as defined in the Environmental Protection Act 1994) must not be released from the site or to waters within the site, or be likely to be released should rainfall occur, unless all reasonable and practicable measures are taken to prevent or minimise the release and concentration of contamination.
The contractor must ensure non-essential exposure of soil is prevented by restricting the extent of works and minimising the duration of soil exposure to adverse weather conditions. Exposed areas must be suitably covered/stabilised/reinstated as soon as practicable and prior to any predicted rainfall occurring.
Erosion and sediment control measures must be installed and maintained to minimise erosion on the site and to minimise the export of sediment and associated pollutants from the site. The erosion and sediment control measures must be designed, installed and maintained in accordance with current best practice standards (refer to advisory notes).
Landscape
Trimming, for access, of the tree located in the road reserve to the north east of the property must be undertaken in accordance with AS 4373- 2007 Pruning of amenity trees.
FOLLOWING CONSTRUCTION
Upon completion of the work a certificate must be issued by an RPEQ certifying that the works have been constructed in accordance with the requirements of this Operational Works permit.
A final inspection and approval of the new driveway and completed reinstatement works by Council’s Inspector is required. Please contact Council on 5329 6500 to arrange for the inspection.
referral agencies
Not applicable.
Advisory notes
The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions:
General Advisory Notes
As this driveway is a private structure, the owner bears full responsibly for the standard of its construction, maintenance and any liabilities associated with its construction. It is recommended that professional advice be sought for the construction of the driveway to ensure that the driveway is constructed in accordance with standard drawing RS-049 and RS-050.
Council has undertaken an audit check of the Operational Works drawings in relations to the proposed works. A detailed check of the calculations and drawings has not been undertaken, as they have been certified by a RPEQ.  The RPEQ bears full responsibility for all aspects of the engineering design.  Council reserves the right to require further amendments and/or additions at a later date should design errors become apparent.
Council reserves the right to call up any performance bond held or levy charges against the property, should emergency works be required to be undertaken by Council to make the site safe due to inactivity on the development site for extended periods of time.
Should any changes or modifications to the approved plans be required as a result of construction constraints, a “Request to change an existing approval” under the Planning Act 2016 must be made. Amended plans clearly indicating the changes must be lodged with this application along with the appropriate fees.
Prestart Inspections Request
Contact Council on 5329 6500 to arrange a prestart or an inspection giving a minimum of 5 business days’ notice of preferred inspection time.
It should be noted prior to arranging a pre-start meeting the Appeal Period of 20 business days must have passed or the applicant must have provided Council with written confirmation that the applicant has accepted the conditions of Decision Notice and waived their appeal rights.
If Council officers are required to undertake additional inspections of the same works, a reinspection fee will be applicable in accordance with Council’s Fees and Charges register applicable at the time.
Environmental Advisory Notes
The Environmental Protection Act 1994 states that a person must not carry out any activity that causes, or is likely to cause, environmental harm unless the person takes all reasonable and practicable measures to prevent or minimise the harm. Environmental harm includes environmental nuisance. In this regard persons and entities, involved in the civil, earthworks, construction and landscaping phases of this development are to adhere to their ‘general environmental duty’ to minimise the risk of causing environmental harm.
Erosion and Sediment Control
Accepted best practice standards include International Erosion Control Association Australasia Best Practice Erosion and Sediment Control
property notes
Not applicable.
VARIATION approval details
Not applicable.
further development permits required
Not applicable.
submissions
Not applicable.
RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached.
During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given.
OTHER DETAILS
If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices.

[word/footer1.xml]
Page 8 of 8

[word/header1.xml]
3

[word/header2.xml]
DEVELOPMENT ASSESSMENT DELEGATED REPORT

[Attachment: image1.png (image text)]
 

 

Provide smooth transition to
existing edge of bitumen, saw cut
existing edge for neatness

 
 
 

 

 

 

 

Bitumen or concrete formed

 

driveway and crossover formation

 
 

 

 

TRACTOR TO TOPSOL AND TURF ANY
DSTREED OR DAINGD AAS OF HE 8040
RESERVE ADJACENT THE CONSTRUCTION SITE

 

 

 

  
 

Minor filing < 300mm topsoil and
turfed by builder

 

 

 

 


[Attachment: image2.png (image text)]
46,
102RP59216

 

 

Tenure Freehold

 

DA Histor Click to open

SARA Link Click to open

 


[Attachment: image3.png (image text)]
SO) & Zone Maps
OAV Urban Area Boundary
DAV Loca! Plan Boundary
OC B Precinas
° Zones
Li
Ml Medium Density Residential
Wb High Density Residential

   

ty Residential

 

MM Tourist
I Major Cent
m=
Local Centre

 

mmodation

DEO ceo’

 

ict C

 

Neighbourhood Centre

lu
fl Medium impact Industry

 

Impact Industry

Recreation and Open Space
Ml Environmental Man:
[i Community Facil

ent and Conser,

 

 

Innovation
Rural
Mh Rural R

 

© C i Community Facilities Label Legend
20) BF Overiay Maps
8D) G Local Government infrastructure Plan (LGIP)

80) @ Osher Plan Maps

  
Log in to download the original file

Delegated Report - Code - Planning OPW21 0002.docx · 2.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.