Skip to the record
Search everything, all in one place.

Council archive · source document

Stormwater Management Plan -OPW (A) · OPW25/0042

of 61

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn

Original PDF page 12, section 1. The text section number identifies this passage in the reader.

Infiltration Rate (mm/s) = 13mm/sec + 33 x head (m)

Refer to Appendix D for 2024 prototype test results.

Video of prototype testing being carried out are included at Appendix K.




6.2.3 PROTOTYPE            RIP    TEST     RESULT       COMPARISON           AND
APPLICATION

It is not entirely clear as to the factors contributing to differing infiltration
rates observed in 2003 and 2024.

2003 testing was carried out at a relatively elevated northern area of the site
compared to 2024 rates observed at a lower southern area of the site.

Both locations saw the prototype founded on clean white sands although
possibly insitu sand density may have differed between the two locations.

Inclusion of a rock base may have contributed to higher infiltration rates
observed in 2024 although the arrangement better replicates actual RIP/RIC
construction.

Regardless of contributing factors both 2003 and 2024 prototype test results
returned very high infiltration rates.


7.0 RIP/RIC DESIGN AND MODELLING

In order to ensure a conservative approach is adopted for infiltration of
stormwater and to minimise risk of RIP/RIC surcharge the following
approach has been adopted: -

   •    Size proposed RIPs/RICs to infiltrate associated catchment flows based
        on the Excel model mentioned in Section 5.1

   •    Conservatively adopt the lower 2003 algorithm for all RIP and RIC
        infiltration rates modelled in eXcel.

   •    Apply a Factor of Safety of 2.0 to infiltration rates modelled.



__________________________________________________________________________

A6769/25/SWMP/Rev OpW(A) – Feb 2025
                                                                             Page 9 of 9
SH/PL
                          Brah101 Pty Ltd t/as ALTA PROJECTS

Used in these records

About this file

File size
9.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Stormwater Management Plan -OPW (A).pdf · 9.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.