10.2 MAJOR EVENT OVERLAND FLOWS (>10 YEAR ARI) Emergency overflow, for events (>Q10) which cannot be wholly conveyed by underground pipework would be conveyed overland through the development site via a landscaped ephemeral stream. Previous versions of this report relied on simple manning calculations carried out at three (3) nodes along the proposed route through the development site in order to estimate 100 Year ARI flow characteristics and check that such flows could be conveyed safely with the following criteria adopted:- -Maximum velocity x depth product = 0.4m2/sec (QUDM 7.0.4.2) -Minimum channel freeboard = 0.3m (QUDM 9.03.1) -Minimum freeboard to any structural floor=500mm (Council Standards SC6.7). For increased accuracy and certainty and to ensure no impacts to adjacent properties or non-compliant flows through roadways and footpaths performance of the ephemeral stream has now been more accurately modelled by Engeny using specialist software. The Engeny report is included at Appendix B and drew the following conclusions: - Engeny Australia Pty Ltd (Engeny) have been engaged by Calile Malouf Investments Pty Ltd to prepare a Local Overland Flow Assessment for a proposed Operational Works (OPW) development for application resort complex and shop at 3 & 7 Serenity Close Noosa Heads QLD 4567. Detailed overland flow modelling has been completed at a level of detail appropriate for Operational Works approval to confirm Alta Project’s proposed realigned drainage and overland flow design through the site is appropriate in achieving the design requirements for the project. The assessment has found that flows can be appropriately managed through the site via an overland flow path which connects into the Serenity Close cul-de-sac footpath, without impacting adjoining properties or resulting in non-compliant flows with the road and footpath. The assessment found that the finished floor levels of each building achieve a minimum 0.5m freeboard and is able to contain the severe storm event (i.e. 1% (2100) AEP fully blocked stormwater network). Reinforced turf is recommended for the last 20m of channel upstream of Serenity Close (velocity up to 2.30 m/s) and rock protection be placed to manage the outlet velocities (rock size D50 = 200mm and extend 3.6m past the outlet). ________________________________________________________________________________________ A6769/25/SWMP/Rev OpW(A) – Feb 2025 Page 20 of 21 SH/PL Brah101 Pty Ltd t/as ALTA PROJECTS
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Stormwater Management Plan -OPW (A).pdfRelated documentApplication case desk ↗
About this file
- File size
- 9.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.