Council archive · source document
Stormwater Management Plan -OPW (A) · OPW25/0042
Plans and drawings: the text below has words only, no drawings.
Original PDF page 3, section 1. The text section number identifies this passage in the reader.
8.1 QUALITY MUSIC MODEL………………………………………...…………………………..15
8.2 QUALITY MUSIC MODEL RESULTS……………………………………………………….18
- Contents -
9.0 SYSTEM MAINTENANCE………………………………….…………………………………18
10.0 EXTERNAL CATCHMENTS DRAINAGE ROUTE……………………………………….19
10.1 PIPED FLOWS (< 10 YEAR ARI)……………………………………………………………..19
10.2 MAJOR EVENT OVERLAND FLOWS (>10 YEAR ARI)…………………………………20
APPENDICES
APPENDIX A – Engineering Drawings
APPENDIX B – Engeny Flood Analysis Report
APPENDIX C – Architectural Drawings
APPENDIX D – Prototype RIP/RIC Test Results
APPENDIX E – Detail Survey
APPENDIX F –Stormwater Management Device Maintenance Plan
APPENDIX G – Excel Spreadsheet Water Balance Model (Electronic Only)
APPENDIX H – Excel Spreadsheet RIP/RIC Models (Electronic Only)
APPENDIX J – Quantity MUSIC Model & Quality MUSIC Model (Electronic Only)
APPENDIX K – Prototype Test Videos (4 December 2024)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Stormwater Management Plan -OPW (A).pdfRelated documentApplication case desk ↗
About this file
- File size
- 9.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.