DBW Application - 30 Upper Pinbarren Creek Rd Pinbarren

of 10
                                                                                                            po / oj

                                                                                                           A                            8   9
                                                                                                       RECEIVED
                                                                                    y rec£ivrd
                                                                              IS
                                                                              Al/
                                                                                  to.  coZj
                                                                                                   1 3 APR 2023
DA Form 2 - Building work details
\n^Act2m.r
Approved form (version 1.2 effective 7 February 2020) made uni^t Se&ti&ff 282       L                  Noosa Council

                                                                                                   '/’77TrnTd5 \ oS
                                                                                                 •'1




This form must be used to make a development application involving building work.
For a development application involving building work only, use this form (DA Form 2) only. The DA Forms Guide
provides advice about how to complete this form.
For a development application involving building work associated and any other type of assessable development
(i.e. material change of use, operational work or reconfiguring a lot), use DA Form 1 - Development application details
and parts 4 to 6 of this form (DA Form 2).
Unless stated otherwise, all parts of this form must be completed in full and all required supporting information must
accompany the development application.
One or more additional pages may be attached as a schedule to this development application if there is insufficient
space on the form to include all the necessary information.

 This form and any other form relevant to the development application must be used to make a development
 application relating to strategic port land and Brisbane core port land under the Transport Infrastructure Act 1994,
 and airport land under the Airport Assets (Restructuring and Disposal) Act 2008. For the purpose of assessing a
 development application relating to strategic port land and Brisbane core port land, any reference to a planning
 scheme is taken to mean a land use plan for the strategic port land, Brisbane port land use plan for Brisbane core
 port land, or a land use plan for airport land.

Note:   All terms used In this form have the meaning given under the Planning Act 2016, the Planning Regulation 2017, or the Development
        Assessment Rules (DA Rules).


PART 1 - APPLICANT DETAILS

  1) Applicant details
  Applicant name(s) (individual or company full name)                                                  /4<Y/V^         (yy^Ls\-A/}l^L
  Contact name (only applicable for companies)
  Postal address (PO Box or street address)

  Suburb
  State
  Postcode                                                                         t-rSG*’
  Country
  Contact number
  Email address (non-mandatory)                          r ce
  Mobile number (non-mandatory)                                          OH i A        '7o 3
  Fax number (non-mandatory)
  Applicant’s reference number(s) (if applicable)


PART 2 - LOCATION DETAILS                                                                                                                   I• C


  2) Location of the premises (complete 2.1 and 2.2 if applicable)
  Note Provide details below and attach a site plan for any or all premises part of the development application. For further information, see DA
  Forms Guide: Relevant plans.
  2.1) Street address and lot on plan
  Q Street address AND lot on plan (all lots must be listed), or
  □ Street address AND lot on plan for an adjoining or adjacent property of the premises (appropriate for development in
        water but adjoining or adjacent to land e.g. jetty, pontoon. All lots must be listed).




                                                                                                                               5^ Queensland
                                                                          Ibox:                           R:                   ft' Government

Log in to download the original (DBW Application - 30 Upper Pinbarren Creek Rd Pinbarren.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 9 pages

Page 2

 Unit No.            Street No.         Street Name and Type                               Suburb


 Postcode            Lot No.            Plan Type and Number (e.g. RP, SP)                 Local Government Area(s)

                                                                 V-P          o (S'          ____
 2.2) Additional premises
 □ Additional premises are relevant to this development application and the details of these premises have been
   attached in a schedule to this development application
 H Not required


 3) Are there any existing easements over the premises?
 Note: Easement uses vary throughout Queensland and are to be identified correctly and accurately. For further information on easements and
 how they may affect the proposed development, see the DA Forms Guide
 □ Yes - All easement locations, types and dimensions are included in plans submitted with this development
   application
 0 No


PART 3 - FURTHER DETAILS

 4) Is the application only for building work assessable against the building assessment provisions?
 O Yes - proceed to 8)
 Q No

 5) Identify the assessment manager(s) who will be assessing this development application



 6) Has the local government agreed to apply a superseded planning scheme for this development application?
 □ Yes - a copy of the decision notice is attached to this development application
 □ The local government is taken to have agreed to the superseded planning scheme request - relevant documents
   attached
 Q No

 7) Information request under Part 3 of the DA Rules
 H I agree to receive an information request if determined necessary for this development application
 □ I do not agree to accept an information request for this development application
 Note: By not agreeing to accept an information request I, the applicant, acknowledge:
 •     that this development application will be assessed and decided based on the information provided when making this development
      application and the assessment manager and any referral agencies relevant to the development application are not obligated under the DA
      Rules to accept any additional information provided by the applicant for the development application unless agreed to by the relevant
     parties.
 •    Part 3 of the DA Rules will still apply if the application is an application listed under section 11.3 of the DA Rules.
 Further advice about information requests is contained in the DA Forms Guide.


 8) Are there any associated development applications or current approvals?
 □ Yes - provide details below or include details in a schedule to this development application
 B No__________________
 List of approval/development      Reference                       Date                    Assessment manager
 application
 □ Approval
 □ Development application
 □ Approval
 □ Development application

                                                                                                                                         Page 2
                                                                                                                DA Form 2 - Building work details
                                                                                                                  Version 1.2— 7 February 2020

Page 3

 9) Has the portable long service leave levy been paid?
 □ Yes - a copy of the receipted QLeave form is attached to this development application
 □ No - I, the applicant will provide evidence that the portable long service leave levy has been paid before the
   assessment manager decides the development application. I acknowledge that the assessment manager may
   give a development approval only if I provide evidence that the portable long service leave levy has been paid
 N Not applicable (e.g. building and construction work is less than $150,000 excluding GST)
 Amount paid                        Date paid (dd/mm/yy)                QLeave levy number (A, B or E)



 10) Is this development application in response to a show cause notice or required as a result of an enforcement
 notice?
 □ Yes - show cause or enforcement notice is attached
 EZI No

 11) Identify any of the following further legislative requirements that apply to any aspect of this development
 application
 □ The proposed development is on a place entered in the Queensland Heritage Register or in a local
   government’s Local Heritage Register. See the guidance provided at www.des.qld.gov.au about the
   requirements in relation to the development of a Queensland heritage place
 Name of the heritage place:                                        Place ID:


PART 4 - REFERRAL DETAILS

 12) Does this development application include any building work aspects that have any referral requirements?
 □ Yes - the Referral checklist for building work is attached to this development application
 S No - proceed to Part 5

 13) Has any referral agency provided a referral response for this development application?
 □ Yes - referral response(s) received and listed below are attached to this development application
 □ No
 Referral requirement                                         Referral agency                     Date referral response



 Identify and describe any changes made to the proposed development application that was the subject of the
 referral response and this development application, or include details in a schedule to this development application
 (if applicable)




PART 5 - BUILDING WORK DETAILS

 14) Owner’s details
 □ Tick if the applicant is also the owner and proceed to 15). Otherwise, provide the following information.
 Name(s) (individual or company full name)                      -

 Contact name (applicable for companies)

 Postal address (P.O. Box or street address)

 Suburb
 State

                                                                                                                         Page 3
                                                                                                DA Form 2 - Building work details
                                                                                                  Version 1.2— 7 February 2020

Page 4

Postcode
Country
Contact number
Email address (non-mandatory)

Mobile number (non-mandatory)

Fax number (non-mandatory)


15) Builder’s details
    Tick if a builder has not yet been engaged to undertake the work and proceed to 16). Otherwise provide the
following information.
Name(s) (individual or company full name)
Contact name (applicable for companies)

QBCC licence or owner - builder number
Postal address (P.O. Box or street address)

Suburb
State
Postcode
Contact number
Email address (non-mandatory)
Mobile number (non-mandatory)

Fax number (non-mandatory)


16) Provide details about the proposed building work
What type of approval is being sought?______________________________________________________________
[3 Development permit
   Preliminary approval
b) What is the level of assessment?
Q Code assessment
O Impact assessment (requires public notification)
c) Nature of the proposed building work (tick all applicable boxes)
   New building or structure                                                  H Repairs, alterations or additions
   Change of building classification (involving building work)                   Swimming pool and/or pool fence
   Demolition                                                                    Relocation or removal
d) Provide a description of the work below or in an attached schedule.


e) Proposed construction materials
                                            Double brick              Steel                            Curtain glass
External walls                              Brick veneer              Timber                           Aluminium
                                            Stone/concrete            Fibre cement                     Other
                                            Timber                    Steel                            Aluminium
Frame
                                            Other
Floor                                       Concrete                  Timber                           Other
                                            Slate/concrete            Tiles                            Fibre cement
Roof covering
                                            Aluminium                 Steel                            Other
f) Existing building use/classification? (if applicable)



                                                                                                                          Page 4
                                                                                                 DA Form 2 - Building work details
                                                                                                   Version 1.2— 7 February 2020

Page 5

 g) New building use/classification? (if applicable)


 h) Relevant plans
 Note: Relevant plans are required to be submitted for all aspects of this development application. For further information, see DA Forms Guide:
       Relevant plans.
 □ Relevant plans of the proposed works are attached to the development application

 17) What is the monetary value of the proposed building work?



 18) Has Queensland Home Warranty Scheme Insurance been paid?
 □ Yes - provide details below
 □ No___________________
 Amount paid______________ Date paid (dd/mm/yy)                                             Reference number
 $'


PART 6 - CHECKLIST AND APPLICANT DECLARATION

 19) Development application checklist
 The relevant parts of Form 2 - Building work details have been completed                                         □-Yes
 This development application includes a material change of use, reconfiguring a lot or                           □ Yes
 operational work and is accompanied by a completed Form 1 - Development
 application details                                                                                              □ Not applicable

 Relevant plans of the development are attached to this development application
 Note: Relevant plans are required to be submitted for all aspects of this development application. For further   □'Yes
 information, see DA Forms Guide: Relevant plans.
 The portable long service leave levy for QLeave has been paid, or will be paid before                            □ Yes
 a development permit is issued (see 9)                                                                           □ Not applicable


 20) Applicant declaration
 □ By making this development application, I declare that all information in this development application is true and
   correct
 □ Where an email address is provided in Part 1 of this form, I consent to receive future electronic communications
   from the assessment manager and any referral agency for the development application where written
   information is required or permitted pursuant to sections 11 and 12 of the Electronic Transactions Act 2001
 Note: It is unlawful to intentionally provide false or misleading information.
 Privacy - Personal information collected in this form will be used by the assessment manager and/or chosen
 assessment manager, any referral agency and/or building certifier (including any professional advisers which may
 be engaged by those entities) while processing, assessing and deciding the development application.
 All information relating to this development application may be available for inspection and purchase, and/or
 published on the assessment manager’s and/or referral agency’s website.
 Personal information will not be disclosed for a purpose unrelated to the Planning Act 2016, Planning Regulation
 2017 and the DA Rules except where:
 • such disclosure is in accordance with the provisions about public access to documents contained in the Planning
      Act 2016 and the Planning Regulation 2017, and the access rules made under the Planning Act 2016 and
      Planning Regulation 2017; or
 • required by other legislation (including the Right to Information Act 2009); or
 • otherwise required by law.
 This information may be stored in relevant databases. The information collected will be retained as required by the
 Public Records Act 2002.




                                                                                                                                             Page 5
                                                                                                                    DA Form 2 - Building work details
                                                                                                                      Version 1.2— 7 February 2020

Page 6

PART 7 - FOR COMPLETION BY THE ASSESSMENT MANAGER - FOR OFFICE
USE ONLY

 Date received:                                Reference numbers:

 For completion by the building certifier
 Classification(s) of approved building work

 Name                                                       QBCC Certification Licence     QBCC Insurance receipt
                                                            number                         number



 Notification of engagement of alternative assessment manager
 Prescribed assessment manager
 Name of chosen assessment manager
 Date chosen assessment manager engaged
 Contact number of chosen assessment manager
 Relevant licence number(s) of chosen assessment
 manager

 Additional information required by the local government
 Confirm proposed construction materials:
                                        □ Double brick                  □ Steel                  □ Curtain glass
 External walls                         □ Brick veneer                  □ Timber                 □ Aluminium
                                        □ Stone/concrete                □ Fibre cement           □ Other
                                        □ Timber                        □ Steel                  □ Aluminium
 Frame
                                        □ Other_______
 Floor                                  □ Concrete                      □ Timber                 □ Other
                                        □ Slate/concrete                □ Tiles                  □ Fibre cement
 Roof covering
                                        □ Aluminium                     □ Steel                  □ Other


 QLeave notification and payment
 Note: For completion by assessment manager if applicable
 Description of the work
 QLeave project number
 Amount paid ($)                                                    Date paid (dd/mm/yy)
 Date receipted form sighted by assessment manager
 Name of officer who sighted the form

 Additional building details required for the Australian Bureau of Statistics
 Existing building use/classification? (if applicable)
 New building use/classification?
 Site area (m2)                                                     Floor area (m2)




                                                                                                                        Page 6
                                                                                               DA Form 2 - Building work details
                                                                                                 Version 1.2— 7 February 2020

Page 7

                                                                                                                                                                                                                                                         GENERAL NOTES

                                                                                                                                                                                                                                                         TIMBER FRAMING AND CONSTRUCTION
                                                                                                                                                                                                                                                         1. ALL CONSTRUCTION TO BE IN ACCORDANCE WITH
                             Areas                                                                                                                                                                                                                       THE AUSTRALIAN DOMESTIC BUILDING CODE.
                                                                                                                                                                                                                                                         2. ALL TIMBER FRAMING TO BE IN ACCORDANCE WITH
                    Name               Area                                                                                                                                                                                                              AS 1684.2 2010 RESIDENTIAL TIMBER FRAMING MANUAL.
                                                                                                                                                                                                                                                         3. PINE FRAMING TO BE MINIUMUM STRESS GRADE
                     floor            80.05 m2
                                                                                                                                                                                                                          CTJ                            MGP 10/MGP12
            Grand total               80.05 m2                                                                                                                                                    04 of 04'                                              4. HARDW00D FRAMING TO BE MINIMUM STRESS
                                                                                                                                                                                                                          s     04 of 04'                GRADE F14 & MINIMUM JOINT GROUP J2.
                                                                                                                                                                                                                                                         5. TIMBER FOR TRUSSES TO BE MINIMUM JOINT GROUP JD4.
                                                                                                                                                                                               Elevation 2 - a            _o
                                                                                                                                                                                                                                                         6. TRUSSES TO BE FIXED IN ACCORDANCE WITH MANUF.
                                                                                                                                                                                                                          LU

o                                                                  8
                                                                                                                                                                                                                                                         SPECIFICATIONS ALL OTHER FIXINGS TO BE IN
                                                                                                                                                                                                                                                         ACCORDANCE WITH AS 1684.2 2010
                                                                                                                                                                                                                       '■rr"-x       8                   7. LAMINATED BEAM SIZES BASED ON HYNEBEAM SPAN

                                                                                                                                                              □
                                                                                                                                                                     006/
CU                                                                                                                                                                                                                                                       TABLES WHERE OTHER BRANDS ARE USED, SIZES TO
                                                                                                                                                                                                                                                         BE CONFIRMED WITH MANUFACTURERS SPECIFICATIONS.
                                                                                                                                                                                                                                                         8. ALL DIMENSIONS TAKE PRECEDENCE OVER SCALES
                                                                                                                               bed                            bath                                                                       §               9. BUILDER AND TRADES ARE TO CONFIRM ALL
                                                          § I
                                                                                                                                                                             existing line of walls              V                       CM
                                                                                                                        (existing timber)                                                                              --A----'                          MEASUREMENTS, DETAILSAND SPECIFICATIONS PRIOR TO
                                                                                                                                                                                          bed                                                            SETOUT AND ORDERING OF MATERIALS
                                                                                                                                                                                                                                                         10. ANY ERRORS ARE TO BE ADDRESSED TO THE DESIGNER
                                                                                                                                                                                 (© (existing timber)                                S =^F=              AS NO RESPONSIBILITY WILL BE TAKEN AFTER
                                                                                                                   3/82gg/slide
05                                                                 3*^                                              /obe
                                                                                                                                      1           820
                                                                                                                                                                            -I    I
                                                                                                                                                                                                                                         in
                                                                                                                                                                                                                                                         CONSTRUCTION HAS COMMENCED
                                                                                                                                                                                                                                                         11. ALL TRADES ARE TO CONFORM WITH THE
                                                                                                                                                                                                                                                         CURRENT AUSTRALIAN STANDARDS RELATING TO HIS OR
                                                                                                                                                     11                     870 }                                                                        HER OWN WORK


o                                                                           r                            Ssp
                                                                                                           H'\
                                                                                                                                                    dr hil'di _n|//900                                                               e=^F=
                                                                                                                                                                                                                                         io
                                                                                                                                                                                                                                         00
                                                                                                                                                                                                                                                         12. TERMITE PROTECTION TO BE PROVIDED AS PER AS
                                                                                                                                                                                                                                                         3660.1.2000

                                                                                                                                                                                                                                                         DOMESTIC SMOKE ALARMS
                                                                                                                                                                                                                                                         1. ALL BEDROOMS AND HALLWAYS ARE TO BE INSTALLED
05                                                                                 existing line                <S S>                                   /                                                                                                WITH PHOTO ELECTRIC SMOKE ALARMS IN ACCORDANCE
                                                                                   of concrete                                                    sta<fk machine + dryer
                                                                                                        linen                                                                                                                                            WITH BUILDING FIRE SAFETY LEGISLATION AMENDMENT
                                                          o                                                                                                                                                                                              REGULATION 2016
                                                          8
                                                                   §
                                                                   CO
                                                                                                        I—I                                                                                                                                              2. SMOKE ALARMS MUST BE POSITIONED IN ACCORDANCE
                                                                                                        i 'tfi I                                                            w
                                                                                                        L2j                                                                                                                                              WITH AS 1670.6 -1997 FIRE DETECTION, WARNING, CONTROL
                                                                                                                                  /livincK                                  o
                                                                                                                                                                                                                                         S               AND INTERCOM SYSTEMS.
CD                                                                                                                                   (timber)                               o                                                                            3. DEVICES MUST BE EITHER INTERCONNECTED OR HARD


                                                                                                   IB                                                       T\
                                                                                                                                                        rafters
                                                                                                                                                                                                                                                         WIRED (EXISTING DWELLINGS ONLY) THAT CANNOT BE
                                                                                                                                                                                                                                                         REMOVED FROM DEVICE
                                                                                                                                                                                                                                                         4. ALARMS TO BE INSTALLED IN ALL HALLWAYS AND
                                                                                                                                                                                                                                                         BEDROOMS TO EXISTING RESIDENCES
                                                                                                                                                                                                                                                         ©INDICATES THE LOCATION OF WIRED SMOKE ALARMS
                                                                                                                                      2«20
                                                               5                                                                                                                                                                                         GLAZING
                                                                                                                                                                                                                                                         1. DOOR AND WINDOW SCHEDULE IS INDICATIVE ONLY AND
                                                          ■3
                                                          s.                                                                           existing                                                                                                          SUBJECT TO CONFIRMATION UPON SITE MEASURE
                                                                   §                                                                   relocated
                                                                                                                                       5615
                                                                                                                                                                                                                                            1            2. OBSCURE WINDOW NOTATION REFERENCE ONLY, CLIENT
                                                                                                                                                                                                                                                         TO CONFIRM WITH BUILDER AND WINDOW SUPPLIER FOR
                                                          §
                                                          co
                                                                                                                                                                                                                                                         PRIVACY OPTIONS
                                                                                                                                                                                                                                            O
                                                                                                                                                                                                                                            CO
                                                                                                                                                                                                                                                         ELECTRICAL AND ENERGY EFFICIENCY
                                                                   8                                                                                                                                                                                     1. ELECTRICALS TO BE CONFIRMED BY OWNER/BUILDER
                                                                                                                                                                                                                                                         AND ELECTRICIAN, PROPOSED PLAN IF REQUESTED
                                                                                                                                                                                                                                                         INDICATIVE ONLY
                                                                                                                                                         ZP
                                     04 of 04    S
                                                 ■■s
                                                                                                                        2700                  1215
                                                                                                                                                         | 820 | 910 I                                                                                   DOWNPIPES
                                                                                                                                                                                                                                                         ALL LOCATED DOWNPIPES INDICATIVE ONLY AND
                                                                                                                                                                                                                                                         CONFIRMED AT TIME OF ROOFING CONSTRUCTION
                                                                                         2400                                               115
                                                 LU
                                                                                                                                                                                                                                                         AND COMPLIANCE
                                                       Elevation 3 - a


                                                          l!4of04
                                                                                                   70                                  5875

                                                                                                                                       10815
                                                                                                                                                                           r

     NOT FOR CONSTRUCTION                                                                                                                                                                                                                                                                            CD
     NOTE: INSTALLATION OF ALL EXTERNAL MATERIALS BY BUILDER AS PER MANUFACTURERS SPECIFICATIONS AND CERTIFICATION REQUIREMENTS AS OUTLINED BY NCC
                                                                                                                                                                                                                                                                                                     CD
     PROPOSED:                       CLIENT: BEATRICE + JOHN MARSHALL BUILDER:                                                                                                                                       MANDY’SJJRAFTING ONLY SHEET: 3 of 4 DATE:                   ISSUE NO:
     RENOVATION                      PH: 5485 2904 + 0417 703 436     TBC                                                                                                                                            PH: 0403 481 474      SCALE: 1:100 22 MAR 2023              BJ-2023-E
     NOTE: THESE DRAWINGS TO BE READ IN CONJUNCTION                      NOTE: BUILDER TO CONFIRM SITING AND DIMENSIONS BEFORE CONSTRUCTION
     WITH ENGINEERS DRAWINGS                                             RESPONSIBILITY LIES THERE WITH

Page 8

                                          02 of 04

                             O
                                       elevation B
                02 of 04
                             s
                             ■s

                              0)


                                                     2400                                                    10000
CD
05
     CXI
                                                            200z|                 3800                        1900
                                                                                                                          I                  3760                                                     TOP PLATE
                                                                                                                                                                                                      JOINERY LINE

                                                                                                                                                                                                                     8
                                                                                                                                                                                                                     Si     8
                                                                                                                                                                                                                            K
                                                                                0618OXSW               08080XSW                                                                8
                                                                                                                                                                               CM,
                                                                                                                                                                                     8
                                                                                                                                                                                                      FLOOR
                                                                                                                                                                                     §
                                                                                                                                                                                                      PAD LEVEL

CO                                                                                                                                                          ▼
                                                                                                                                                                               I                                                                          elevation A
                                                             co                                                                                                                             8
                                                            -e&-
                                                            3
                                                                                                                                            bed                 £             e=*F=§
                                                                                                                                                                8
                                                                                                                                                                CO
                                                                                                                                                                               § -
                                                                                                                                                                3
CD                                                                                                                                                                             §
                                                                                                                                      -i            - :i
CO                                                                           1518OXSW                                                      1518OXSW                                  8
                                                                                                                                                                                     CM

                                                                                                            existing doors relocated

                                                                                                existing patio roof to be relocated                                                         1   §
                                                                                                                                                                                                           o
                                                                                                                                                                                                                           ZZI
                                                                                                                                                                                                                                 Eg                                   I ' I'! I
                                                                                                                                                                                                CM                        •~T    I      I    EZ                         1 ' I I ~
                                                                                                                                                                                                                          r~T        1-. :                 T^T
                                                                                                                                                                                                                                              i
                                                                                                                                                                                                                                                    rzr
                                                                                                                                                                                                                                                    ~T~
CD                                                                 proposed extension                                                                                    §
                                                                                                                                                                                                                                                    "T

                                                                                                            4500                                                                02 of 04;
                                                                                                                                                                         Jd
                                                                                                                                                                         CD


                                                                                                                                                                                                                                                          elevation B
                                                                                                                                                           elevation D


                                                                                                                                                            02 of 04'




                                                                                                                                                                                                                                                                                             </>
                           TOP PLATE
                           JOINERY LINE                                                                                                                                                                                                           T l                       o
                                                                                                                                                                                                                           T ~T T,.                O'
                                                                                                                                                                                                                                                  T~O~
                                          8                                                                                                                                                                                I    j''!         I ~o          i   I ~l
                                          8   8


                           FLOOR
                                                                                                                                                                                                         ill
                                                                                                                                                                                                                                             L1                                              co
                                                                                                                                                                                                                     —
                                                                                                                      1
                           PAb Level                                                                                                                                                                                                                                                         CD
                                                                                                                     elevation C                                                                                                                                      elevation D            CD




           NOT FOR CONSTRUCTION
           NOTE: INSTALLATION OF ALL EXTERNAL MATERIALS BY BUILDER AS PER MANUFACTURERS SPECIFICATIONS AND CERTIFICATION REQUIREMENTS AS OUTLINED BY NCC

           PROPOSED:                           CLIENT: BEATRICE + JOHN MARSHALL BUILDER:                                                                                                             MANDY'S DRAFTING ONLY SHEET: 2 of 4 DATE:                                      ISSUENOjK
           RENOVATION                          PH: 5485 2904 + 0417 703 436     TBC                                                                                                                  PH: 0403 481 474      SCALE: 1:100 22 MAR 2023                                 BJ-2023-E X
           NOTE: THESE DRAWINGS TO BE READ IN CONJUNCTION                               NOTE: BUILDER TO CONFIRM SITING AND DIMENSIONS BEFORE CONSTRUCTION
                                                                                                                                                                                                                                                                                              CD
           WITH ENGINEERS DRAWINGS                                                      RESPONSIBILITY LIES THERE WITH

Page 9

                                                                                                                                                                                       SITE DETAILS

                                                                                                                                                                                       RESPONSIBILITY CANNOT BE TAKEN FOR SITE LEVELS
                                                                                                                                                                                       THEREFORE THE BUILDER SHOULD VERIFY THESE LEVELS
                                                                                                                                                                                       BEFORE COMMENCING ANY WORK

                                                                                                                                                                                       CUT AND FILL, LEVELS SHOWN ON THIS PLAN ARE APPROXIMATE
                                                                                                                                                                                       INTERPRETATION, AND MAY VARY TO FINISHED LEVELS ON SITE
                                                                                                                                                                                       AT COMMENCEMENT AND COMPLETION OF WORKS


                                                                                                                                                                                o      PLATFORM IMMEDIATELY SURROUNDING RESIDENCE TO
                                                                                                                                                                                       FALL AWAY FROM RESIDENCE AT A SLOPE OF 1 IN 15MIN.

CD                                                                                                                                                                                     DRIVEWAY SLOPE NOT TO EXCEED A MAX 1 VERTICAL TO
          co                                                                                                                                                                           4 HORIZONTAL APPROX.
G3        CM
                                                                                                                                                                                       1000MAX HIGH TIMBER RETAINING WALLS TO HAVE 65mm DIA. AG. PIPE
     CM £35                                                                                                                                                                            (DISCHARGE TO STORMWATER) + GRADED GRANULAR BACK FILL
          <                                                                                                                                                                            BEHIND AND TO BE CONTAINED WITHIN SITE
          UJ



                                      76d29'
                                                                        80d0'
                                                                                                                                                                                LU     RETAININING WALLS EXCEEDING THIS ARE TO BE ENGINEERED ALSO

                                                                                                                                                                                       DISPOSE SEWERAGE IN ACCORDANCE WITH LOCAL AUTHORITY
05                                                                                                                                                                              LU     PREPARED DRAINAGE PLAN
                                                                                                                                             existing residence
                                                                                                                                                                                cc     DISCHARGE ALL STORMWATER TO COUNCIL S/WATER SYSTEM
                                                                                                                                                                                       (DOWNPIPE DESIGN, SIZE AND LOCATION BY BUILDER AND ROOFING
                                                                                                                                                                                       REQUIREMENTS, AND MAYBE ADJUSTED TO SUIT SITE CONDITIONS.

CD                                                                                                             NOTE:
                                                                                                               OWNER TO CONFIRM EXISTING POSITION,
                                                                                                               OF EFFLUENT SYSTEM + ENGAGE      /
                                                                                                                                                                                o      DOWNPIPES:
                                                                                                                                                                                       90DIA OR 100x50 DOWNPIPES TO STORMWATER PIPES 100mm MIN
                                                                                                               SERVICE FOR REPORT TO UPGRADE /
03                                                                                                                                                                                     COVER 1 IN 10OMIN FALL


                                                                                                         1                                                                             TERMITE PROTECTION


                                                                                                         existing relatives                                                     LU     BUILDER TO PROVIDE TERMITE CONTROL SYSTEM IN ACCORDANCE
                                                                                                                                                                                       WITHAS.3660.1
                                                                                                         dwelling extended
CD
                                                          85d41'40"
                                                                                                                                                                                CC     TERMITE PROTECTION GENERALLY SHALL BE BY GROUND FLOOR SLAB
                                                                                                                                                                                       AS BARRIER AND EXPOSED EDGE OF SLAB AS VISUAL BARRIER

                                                                                                                                                                                CC     TERMI MESH OR SIMILAR COLLARS TO SLAB PENETRATIONS
                                                                                                                                                                                       TERMITE RESISTENT (HAZARD LEVEL H2) TIMBER FRAMING GENERALLY
                                                                                                                                                            existing garage            BUILDER TO PROVIDE ACCESS FOR CLEAR VISUAL INSPECTIONS TO THE
                                                                                                                                                                                       ENTIRE PERIMETER OF THE HOUSE, AND THE EXPOSED EDGE OF CONCRETE SLABS

                                                                                                                                             v/                                 CO     ENERGY EFFICIENCY

                                                                                                                                                                                       ALL TOILETS TO BE INSTALLED WITH 3/4.5 DUAL FLUSH CISTERNS OR BETTER
                                                                                                                                                                                       ALL SHOWER HEADS TO HAVE CERTIFIED AAA WATER CONSERVATION RATING
                                                                                                                                                                                       ALL TAPS TO HAVE CERTIFIED AAA WATER CONSERVATION RATING
                                                                                                                                                                                       ENERGY EFFICIENT LIGHTING TO BE USED FOR MIN OF 80% OF FLOOR AREA
                                                                                                                                                                                       HOT WATER SYSTEM TO BE GAS BOOSTED SOLAR HOT WATER SYSTEM
                                                                                                                                                                                       (OR OTHER APPROVED) OF SIZE TO SUIT REQUIREMENTS.

                                                                                                                                                                                       GENERAL

                                                                                                                                                                                CC     ALL CONSTRUCTION METHODS AND MATERIALS TO BE IN ACCORDANCE WITH:
                                                                                                                                                                                       THE BUILDING CODE OF AUSTRALIA
                                                                                                                                                                                       THE BUILDING ACT 1975

                                                                                                                          s                                                     LU     STANDARD BUILDING REGULATION 1993
                                                                                                                                                                                       BUILDING REGULATION 2006
         NOTE TO BUILDER:

         IF ANY DISCREPANCIES ARISE IN THE CERTIFICATION
                                                                                                                          I
                                                                                                                          1
                                                                                                                          p.:
                                                                                                                                                                                       QDC QUEENSLAND DEVELOPMENT CODE
                                                                                                                                                                                       AS 1684-2006 TIMBER FRAMING CODE
         PROCESS, AND BUILDING WORKS HAVE COMMENCED
         NO RESPONSIBILITY IS TAKEN FROM THE COMPLETED                                                                                                                                 ALL TIMBER FRAMED WALLS TO WET AREAS TO BE LINED WITH FC
         DESIGN AND DRAFTING. IT IS A REQUIRED PART OF THE                                                                                                                             WC'S TO BE A MIN CLEAR FINISHED WIDTH OF 900mm
         BUILDING AND PLANNING OF INDIVIDUAL PROJECTS TO                                                                                                                               DOORS TO WC'S TO HAVE LIFT OFF HINGES
         CONFIRM COUNCIL PLANNING SCHEME AND BUILDING                                                                                                                                  SMOKE ALARMS TO BE PROVIDED AS PER BCA & AS3786
         COMPLIANCE.                                                                                                                                                                   MASONARY CONSTRUCTION TO BE IN ACCORDANCE WITH AS3700
                                                                                                                                                                                       ALL WET AREA FLOORS AND WALLS TO BE PROTECTED AS PER CLAUSE 3.8.1 BCA
                                                                                                                                                                                       BALUSTRADING TO BE 1000MIN ABOVE FINISHED FLOOR LEVEL AND HAVE
                                                                                                                                                                                       125mm MAX SPACING IN BALUSTERS
         NOT FOR CONSTRUCTION                                                                                                                                                          PROVICE DPCS AS PER CLAUSE 3.3.4 BCA
                                                                                                                                                                                       PROVIDE FLASHINGS AS PER CLAUSE 3.3.4,3.5.1, & 3.5.3 BCA

         NOTE: INSTALLATION OF ALL EXTERNAL MATERIALS BY BUILDER AS PER MANUFACTURERS SPECIFICATIONS AND CERTIFICATION REQUIREMENTS AS OUTLINED BY NCC
                                                                                                                                                                                                                                                        05
         PROPOSED:                    CLIENT: BEATRICE + JOHN MARSHALL BUILDER:                                                                               MANDySDRAFTINGONLY SHEET: 1 of4 DATE:                               ISSUE NO:
                                                                                                                                                                                                                                            CD
         RENOVATION                   PH: 5485 2904 + 0417 703 436     TBC                                                                                    PH: 0403 481 474   SCALE: 1:200 22 MAR 2023                         BJ-2023-E
         NOTE: THESE DRAWINGS TO BE READ IN CONJUNCTION               NOTE: BUILDER TO CONFIRM SITING AND DIMENSIONS BEFORE CONSTRUCTION                                                                                                                cn
         WITH ENGINEERS DRAWINGS                                      RESPONSIBILITY LIES THERE WITH

Page 10

                                                                                                                                                                                                                                  GENERAL NOTES

                                                                                           aluminium framed^indows + doors                                                                                                        TIMBER FRAMING AND CONSTRUCTION
                                                                                                                                                                                                                                  1. ALL CONSTRUCTION TO BE IN ACCORDANCE WITH
                                                                                                                                                                                                                                  THE AUSTRALIAN DOMESTIC BUILDING CODE.
                                                                                                                                                                                                                                  2. ALL TIMBER FRAMING TO BE IN ACCORDANCE WITH
                                                                                                                                                                                                                                  AS 1684.2 2010 RESIDENTIAL TIMBER FRAMING MANUAL.
                                                                                                                                                                                                                                  3. PINE FRAMING TO BE MINIUMUM STRESS GRADE
                                                                                                                                                                                                                                  MGP10/MGP12
                                                                                                                                                                                                                                  4. HARDWOOD FRAMING TO BE MINIMUM STRESS
                                                                                                                                                                                                                                  GRADE F14 & MINIMUM JOINT GROUP J2.
                                                     timber posts                                                                                                                                                                 5. TIMBER FOR TRUSSES TO BE MINIMUM JOINT GROUP JD4.
                                                                                                                                                                                                                                  6. TRUSSES TO BE FIXED IN ACCORDANCE WITH MANUF.
o                                                                                                                                                                                                                                 SPECIFICATIONS ALL OTHER FIXINGS TO BE IN
                                                                                                                                                                                                                                  ACCORDANCE WITH AS 1684.2 2010
                                                                                                                                                                                                                                  7. LAMINATED BEAM SIZES BASED ON HYNEBEAM SPAN
co                                                                            horizontal cladding fixed as per manufacturers specifications +     .                                                                               TABLES WHERE OTHER BRANDS ARE USED, SIZES TO
     CM                                                                       material selection as per aus standards                           Elevation 1 - a                                                                   BE CONFIRMED WITH MANUFACTURERS SPECIFICATIONS.
                                                                                                                                                                                                                                  8. ALL DIMENSIONS TAKE PRECEDENCE OVER SCALES
                                                                                                                                                                                                                                  9. BUILDER AND TRADES ARE TO CONFIRM ALL
                                                                                                                                                                                                                                  MEASUREMENTS, DETAILSAND SPECIFICATIONS PRIOR TO
                                                                                                                                                                                                                                  SETOUT AND ORDERING OF MATERIALS
                                                                                                                                                                                                                                  10. ANY ERRORS ARE TO BE ADDRESSED TO THE DESIGNER
                                                                                              IT                                                                                                                                  AS NO RESPONSIBILITY WILL BE TAKEN AFTER
OS                                                                                                                                                                                                                                CONSTRUCTION HAS COMMENCED
                                                                                                                                                                             —                                                    11. ALL TRADES ARE TO CONFORM WITH THE
                                                                                                                                                                                                                                  CURRENT AUSTRALIAN STANDARDS RELATING TO HIS OR

                                                                                                                                      ..
                                                                                                                                                                I                                                                 HER OWN WORK
                                                                                                                                                                                                                                  12. TERMITE PROTECTION TO BE PROVIDED AS PERAS
CD                                                                                                                                                                                                                                3660.1.2000
                                                                                                                                                              rn'         T , T
                                                                                                                                                                          ZTZ                                                     DOMESTIC SMOKE ALARMS
                                                                                                                                                                          EZI
CU                                                                                                                                                                                                                                1. ALL BEDROOMS AND HALLWAYS ARE TO BE INSTALLED
                                                                                                                                                                                                                                  WITH PHOTO ELECTRIC SMOKE ALARMS IN ACCORDANCE
                                                                                                                                                                                                                                  WITH BUILDING FIRE SAFETY LEGISLATION AMENDMENT
                                                                                                                                                                                                                                  REGULATION 2016
                                                                                                                                                           Elevation 2 - a                                                        2. SMOKE ALARMS MUST BE POSITIONED IN ACCORDANCE
                                                                                                                                                                                                                                  WITH AS 1670.6 - 1997 FIRE DETECTION, WARNING, CONTROL
                                                                                                                                                                                                                                  AND INTERCOM SYSTEMS.
CD                                                                                                                                                                                                                                3. DEVICES MUST BE EITHER INTERCONNECTED OR HARD
                                                                                                                                                                                                                                  WIRED (EXISTING DWELLINGS ONLY) THAT CANNOT BE
                                                                                                                                                                                                                                  REMOVED FROM DEVICE
                                                                                                                                                                                                                                  4. ALARMS TO BE INSTALLED IN ALL HALLWAYS AND
                                                                                                                                                                                                                                  BEDROOMS TO EXISTING RESIDENCES
                                                                                                                                                                                                                                  ©INDICATES THE LOCATION OF WIRED SMOKE ALARMS

                                                                                                                                                                                                                                  GLAZING
                                                     8
                                                     Si    8
                                                                                                                                                            111                                                                   1. DOOR AND WINDOW SCHEDULE IS INDICATIVE ONLY AND
                                                                                                                                                                                                                                  SUBJECT TO CONFIRMATION UPON SITE MEASURE
                                                                                                                                                                                                                                  2. OBSCURE WINDOW NOTATION REFERENCE ONLY, CLIENT
                                                                                                                                                      ^■1                                                                         TO CONFIRM WITH BUILDER AND WINDOW SUPPLIER FOR
                                                                                                                                                                                                                                  PRIVACY OPTIONS
                                                                                                      ---------- - ---------
                                                                                                       existing doors relocated                                                 existing water tank
                                                                                                                                                                                                                                  ELECTRICAL AND ENERGY EFFICIENCY

                                                                                                                                                                Elevation 3 - a                                                   1. ELECTRICALS TO BE CONFIRMED BY OWNER/BUILDER
                                                                                                                                                                                                                                  AND ELECTRICIAN, PROPOSED PLAN IF REQUESTED
                                                                                                                                                                                                                                  INDICATIVE ONLY
                                                                                                      colorbond sheet roofing fixed as per manufacturers specifications
                                                                                                                                                                                                                                  DOWNPIPES
                                                                                                                                                                                                                                  ALL LOCATED DOWNPIPES INDICATIVE ONLY AND
                                                                                                                                                                                                                                  CONFIRMED AT TIME OF ROOFING CONSTRUCTION       C/5
                                                                                                                                                                                                                                  AND COMPLIANCE




                                                                                                                                                       —                                                                                                                          05

                                                                                                            ----------- - --------
                                                                                                                                                                                                                                                                                  CD
                                                                          existing 40m2 cottage             existing window relocated                                                                                                                                             CD
                                                                                                                                                         Elevation 4 - a
          NOT FOR CONSTRUCTION                                                                                                                                                                                                                                                    Q
          NOTE: INSTALLATION OF ALL EXTERNAL MATERIALS BY BUILDER AS PER MANUFACTURERS SPECIFICATIONS AND CERTIFICATION REQUIREMENTS AS OUTLINED BY NCC
                                                                                                                                                                                                                                                                                  O
          PROPOSED:                   CLIENT: BEATRICE + JOHN MARSHALL BUILDER:                                                                                                                MANDY'S DRAFTING ONLY SHEET: 4 of 4 DATE:____                 ISSUE NO:
          RENOVATION                  PH: 5485 2904 + 0417 703 436     TBC                                                                                                                     PH: 0403 481 474      SCALE: 1:100 22 MAR 2023                BJ-2023-E
          NOTE: THESE DRAWINGS TO BE READ IN CONJUNCTION            NOTE: BUILDER TO CONFIRM SITING AND DIMENSIONS BEFORE CONSTRUCTION
          WITH ENGINEERS DRAWINGS                                   RESPONSIBILITY LIES THERE WITH

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.