RFI -20200193 - Amended Drawings - Received 26-10-2020 · 132010.105.01
b o u n d a r y
approx' sewer line
e a s e m e n t
3600 70 2000 70 4125 140 4405
double stud wall
to be re-tiled &
waterproofed Bed 4
& 5 Ens
Living window to be
Bed 4 changed to 1200 high
0
maintain same width
robe
b o u n d a r y
5345
Bed 1
900
70
450mm deep shelves up to 250mm
1900mm with a 600mm deep shelf
1080 70 900
820
deep shelf at 1900mm
2050
Bed 2 620 x 2
drawers
w.i.r
Bar
Linen w.i
4Lm glass balustrade
70 1200
70
full/half hanging
robe
2930
cabinetry design to be confirmed
to be re-tiled &
waterproofed
Bed 1 on site with builder & owner
Bed 3
3224
Ens Bed 1
Bed 2
Bed 2 & 3 Ens w.i.r
900 70
1000 70 2390 70 1000
3350 70 2000 70 3350 70 2400 70 2230 70 2230
4530
Concept
Do not scale off this drawing. DRAWING REVISIONS Drawing Title: Project:
Check all dimensions on site. REV. DATE DESCRIPTION
Proposed Upper Floor Plan Proposed Alterations & Additions
30 Moorhen Pl, Noosaville
All drawings are copyright and Orientation:
are owned and controlled by Client:
Collins Building Designs. All Josh McNally Scale: 1 : 100 @ A3 Drawing No:
Building works must comply
with current B.C.A and S.A.A. [email protected]
Mob: 0474 141 348
Date: 22.10.2020 Rev: A10_ A108
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI -20200193 - Amended Drawings - Received 26-10-2020.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.