    Hazards Identification & Risk Control                                                                                                                                                                                                               GENERAL INFORMATION                                                    GENERAL NOTES                                        GENERAL INFORMATION
    1. FALLS, SLIPS, TRIPS                                                                                   5.. MANUAL TASKS                                                                                                                           Construction of this building to be in accordance with the             The builder is responsible to check all
    a) WORKING AT HEIGHTS                                                                                    Components within this design with a mass in excess of 25kg should be lifted by two or more workers or by
                                                                                                                                                                                                                                                        following Australian governing bodies.                                 existing services prior to beginning any             Minimum Design Standards
    DURING CONSTRUCTION                                                                                      mechanical lifting device. Where this is not practical, suppliers or fabricators should be required to limit the
    Wherever possible, components for this building should be prefabricated off-site or at                   component mass.                                                                                                                                                                                                   construction.                                        Construction of this building to be in
    ground level to minimise the risk of workers falling more than two metres. However,                      All material packaging, building and maintenance components should clearly show the total mass of packages                                 ♦ National Construction Code (NCC)                                                                                          accordance with the following Australian
    construction of this building will require workers to be working at heights where a fall in              and where practical all items should be stored on site in a way which minimises bending before lifting. Advice
    excess of two metres is possible and injury is likely to result from such a fall. The builder            should be provided on safe lifting methods in all areas where lifting may occur.                                                           ♦ Queensland Development Code                                          # Denotes cavity slider to manufactuers              governing bodies.
    should provide a suitable barrier wherever a person is required to work in a situation where             Construction, maintenance and demolition of this building will require the use of portable tools and equipment.                            ♦ Standard Building Regulation 2006                                    specification, frames containing cavity sliders      ♦ National Construction Code (NCC)
    falling more than two metres is a possibility.                                                           These should be fully maintained in accordance with manufacturer’s specifications and not used where faulty or
    DURING OPERATION OR MAINTENANCE                                                                          (in the case of electrical equipment) not carrying a current electrical safety tag. All safety guards or devices                           ♦ Local government planning policies                                   to be 90mm minimum U.N.O                             ♦ Queensland Development Code
    Cleaning and maintenance of windows, walls, roof or other components of this building will               should be regularly checked and Personal Protective Equipment should be used in accordance with                                            ♦ Estate Design Guidelines                                                                                                  ♦ Standard Building Regulation 2006
    require persons to be situated where a fall from a height in excess of two metres is                     manufacturer’s specification.                                                                                                                                                                                                                                          ♦ Local government planning policies
    possible. Where this type of activity is required, scaffolding, ladders or trestles should be                                                                                                                                                                                                                              Builder to verify all dimensions prior to
    used in accordance with relevant codes of practice, regulations or legislation.                          6. HAZARDOUS SUBSTANCES                                                                                                                    Roof Construction                                                      beginning construction work.                         ♦ Estate Design Guidelines
    Cleaning and maintenance of windows, walls, roof or other components of this building will               ASBESTOS
    require persons to be situated where a fall from a height in excess of two metres is                     (for alterations to a building constructed prior to 1990)
                                                                                                                                                                                                                                                        Colorbond sheet metal to be fixed in accordance with
    possible. Where this type of activity is required, scaffolding, fall barriers or Personal                This building was constructed prior to 1990 and therefore may contain asbestos either in cladding material or in                           manufactures specification.                                            Electric HWS to minimum energy efficiency            Site Plan Notes
    Protective Equipment should be used in accordance with relevant codes of practice,                       fire retardant insulation material. The builder should check and, if necessary, take appropriate action before                             All ridge capping, steps, hips valleys and vent flashings to
    regulations or legislation.                                                                              demolishing, cutting, sanding, drilling or otherwise disturbing the existing structure.
                                                                                                                                                                                                                                                                                                                               regulations.                                         Surface water drainage must be prevented
    Anchorage points for portable scaffold or fall arrest devices have been included in the                  (for alterations to a building constructed prior to 1986)                                                                                  provide waterproofing system.                                                                                               from entering the building with FGL sloping
    design for use by maintenance workers. Any persons engaged to work on the building                       This building was constructed prior to 1986 and therefore is likely to contain asbestos either in cladding material                                                                                               Toilets: minimum 4-star dual flush, as rated
    after completion of construction work should be informed about the anchorage points.                     or in fire retardant insulation material. The builder should check and, if necessary, take appropriate action before                                                                                                                                                   away from the building & finished slab levels.
                                                                                                             demolishing, cutting, sanding, drilling or otherwise disturbing the existing structure.                                                    Provide reflective foil backed sarking to underside of roof            under the Water Efficiency and Labeling              The builder is responsible to check all existing
    b) SLIPPERY OR UNEVEN SURFACES                                                                           POWDERED MATERIALS                                                                                                                         sheeting. Colorbond guttering and PVC Downpipes to be                  Standards scheme (WELS).                             services prior to beginning construction.
    FLOOR FINISHES                                                                                           Many materials used in the construction of this building can cause harm if inhaled in powdered form. Persons
    Specified finishes have been selected to minimise the risk of floors and paved areas                     working on or in the building during construction, operational maintenance or demolition should ensure good                                connected to Stormwater systems in accordance with the
    becoming slippery when wet or when walked on with wet shoes/feet. Any changes to the                     ventilation and wear Personal Protective Equipment including protection against inhalation while using powdered                            local authority.                                                       Tapware: minimum 3-star WELS rated for               Stabilised cut and fill batters to be a
    specified finish should be made in consultation with the designer or, if this is not practical,          material or when sanding, drilling, cutting or otherwise disturbing or creating powdered material.
    surfaces with an equivalent or better slip resistance should be chosen.                                                                                                                                                                                                                                                    kitchen sinks, basins and laundry troughs.           minimum of 1000mm away from footings
    The owner is responsible for the selection of surface finishes in the pedestrian trafficable                                                                                                                                                        Roof water requirements and calculations are provided as a                                                                  and are to have 1 in 1 max. gradient.
    areas of this building. Surfaces should be selected in accordance with AS HB 197:1999                    TREATED TIMBER                                                                                                                             guide. Ensure a qualified plumber/ hydraulics consultant
    and AS/NZ 4586:2004.                                                                                     The design of this building includes provision for the inclusion of treated timber within the structure. Dust or
                                                                                                                                                                                                                                                                                                                               Showerheads: minimum 3-star WELS rated               Grade finished surface level
                                                                                                             fumes from this material can be harmful. Persons working on or in the building during construction, operational                            reviews the downpipe layouts prior to construction.                    showerheads.                                         from slab and footings.
    c) STEPS, LOOSE OBJECTS AND UNEVEN SURFACES                                                              maintenance or demolition should ensure good ventilation and wear Personal Protective Equipment including
    Due to design restrictions for this building, steps and/or ramps are included in the building            protection against inhalation of harmful material when sanding, drilling, cutting or using treated timber in any
    which may be a hazard to workers carrying objects or otherwise occupied. Steps should be                 way that may cause harmful material to be released. Do not burn treated timber.                                                            Icon Building Design has provided downpipe locations as a             SD Smoke alarms complying with AS 3786                Position of proposed building to
    clearly marked with both visual and tactile warning during construction, maintenance,                    VOLATILE ORGANIC COMPOUNDS                                                                                                                 guide only. Layout to be checked for compliance by qualified           to be installed and connected to consumer            be verified by builder on site.
    demolition and at all times when the building operates as a workplace.                                   Many types of glue, solvents, spray packs, paints, varnishes and some cleaning materials and disinfectants
    Building owners and occupiers should monitor the pedestrian access ways and in                           have dangerous emissions. Areas where these are used should be kept well ventilated while the material is                                  persons prior to ordering and construction.                            mains power in accordance with NCC part              Location of existing services to be
    particular access to areas where maintenance is routinely carried out to ensure that                     being used and for a period after installation. Personal Protective Equipment may also be required. The                                    All slotted gutters and downpipes to be installed to NCC and           3.7.2                                                verified by builder prior to construction.
    surfaces have not moved or cracked so that they become uneven and present a trip                         manufacturer’s recommendations for use must be carefully considered at all times.
    hazard. Spills, loose material, stray objects or any other matter that may cause a slip or trip          SYNTHETIC MINERAL FIBRE
                                                                                                                                                                                                                                                        or AS3500 (relevant parts). Materials used are to be
    hazard should be cleaned or removed from access ways.                                                    Fibreglass, rockwool, ceramic and other material used for thermal or sound insulation may contain synthetic                                compatible with all components upstream and down stream.               All electrical appliances and plumbing symbols       Wall Construction
    Contractors should be required to maintain a tidy work site during construction,                         mineral fibre which may be harmful if inhaled or if it comes in contact with the skin, eyes or other sensitive parts
    maintenance or demolition to reduce the risk of trips and falls in the workplace. Materials              or the body. Personal Protective Equipment including protection against inhalation of harmful material should be
                                                                                                                                                                                                                                                                                                                               are diagrammatical. Refer to builders                Wall framing to be constructed in
    for construction or maintenance should be stored in designated areas away from access                    used when installing, removing or working near bulk insulation material.                                                                   Surface water drainage must be prevented from entering the             specification for details all fixtures.              accordance with engineering specification
    ways and work areas.                                                                                     TIMBER FLOORS                                                                                                                              building with FGL sloping away from the building & finished                                                                 and must not differ from certification
                                                                                                             This building contains timber floors which have an applied finish. Areas where finishes are applied should be
    2. FALLING OBJECTS                                                                                       kept well ventilated during sanding and application and for a period after installation. Personal Protective                               slab levels. The builder is responsible to check all existing          Seal wet areas in accordance with N.C.C. Vol. 2.     covered by the Form 15. Cladding
    LOOSE MATERIALS OR SMALL OBJECTS                                                                         Equipment may also be required. The manufacturer’s recommendations for use must be carefully considered at                                 services prior to beginning construction.                              Part 3.8.1. Slope floor surface towards fw           systems to be fixed in accordance with
    Construction, maintenance or demolition work on or around this building is likely to involve             all times.
    persons working above ground level or above floor levels. Where this occurs one or more                                                                                                                                                                                                                                    (floor wastes)                                       manufactures specification.
    of the following measures should be taken to avoid objects falling from the area where the                                                                                                                                                          Position of proposed building to be verified by builder on             Provide lighting in accordance with N.C.C. Vol. 2.
    work is being carried out onto persons below.                                                            7. CONFINED SPACES
    1.             Prevent or restrict access to areas below where the work is being carried out.            EXCAVATION
                                                                                                                                                                                                                                                        site. Location of existing services to be                              Part 3.8.4.2 & 3                                     Wet Areas
    2.             Provide toeboards to scaffolding or work platforms.                                       Construction of this building and some maintenance on the building will require excavation and installation of                             verified by builder prior to construction.                             Provide ventilation in accordance with N.C.C.        Floors in "Wet Areas" to be impervious in
    3.             Provide protective structure below the work area.                                         items within excavations. Where practical, installation should be carried out using methods which do not require
    4.             Ensure that all persons below the work area have Personal Protective                      workers to enter the excavation. Where this is not practical, adequate support for the excavated area should be
                                                                                                                                                                                                                                                                                                                               Vol. 2. Part 3.8.5                                   accordance with Australian Standards.
                   Equipment.                                                                                provided to prevent collapse. Warning signs and barriers to prevent accidental or unauthorised access to all                               Termite method to be in accordance with the NCC Part 3.1.3             Mechanical ventilation in accordance with N.C.C      Finish and fall gradients to floor wastes.
    BUILDING COMPONENTS                                                                                      excavations should be provided.                                                                                                            and other relevant manufacturer specification. All new work            Vol. 2. and AS1668.2
    During construction, renovation or demolition of this building, parts of the structure
    including fabricated steelwork, heavy panels and many other components will remain                                                                                                                                                                  shall be protected from termite attack in accordance with AS                                                                Glazing Construction
    standing prior to or after supporting parts are in place. Contractors should ensure that                 ENCLOSED SPACES                                                                                                                            3600.1 "Protection of the Building from Subterranean                                                                        Powdercoated Aluminum Frame
    temporary bracing or other required support is in place at all times when collapse which
    may injure persons in the area is a possibility.                                                         Enclosed spaces within this building may present a risk to persons entering for construction, maintenance or                               Termites AS2870 Part 1 New Building Slabs.                                                                                  Windows in accordance with AS 4055
    Mechanical lifting of materials and components during construction, maintenance or                       any other purpose. The design documentation calls for warning signs and barriers to unauthorised access.                                                                                                           Stormwater Note
    demolition presents a risk of falling objects. Contractors should ensure that appropriate                These should be maintained throughout the life of the building. Where workers are required to enter enclosed                                                                                                       All stormwater drainage shall be in accordance      "wind loads for residential" & AS 1288
    lifting devices are used, that loads are properly secured and that access to areas below the             spaces, air testing equipment and Personal Protective Equipment should be provided.                                                          Smoke detectors                                                                                                           "Glass in Buildings selection and
                                                                                                                                                                                                                                                                                                                                with A.S. 3500.3.
    load is prevented or restricted.                                                                         SMALL SPACES                                                                                                                                 To comply with A.S. 3786 - smoke alarms.                                                                                  installation"
                                                                                                             Some small spaces within this building will require access by construction or maintenance workers. The design                                Approved smoke detectors with mains
                                                                                                                                                                                                                                                                                                                                All stormwater drainage shall be in accordance
    3. TRAFFIC MANAGEMENT                                                                                    documentation calls for warning signs and barriers to unauthorised access. These should be maintained                                        supplied power and battery backup.                                                                                        Soffit Construction
                                                                                                             throughout the life of the building. Where workers are required to enter small spaces they should be scheduled                                                                                                     with S.C.R.C. guidelines to minimise erosion
    (for building on a major road, narrow road or steeply sloping road)                                      so that access is for short periods. Manual lifting and other manual activity should be restricted in small spaces.                                                                                                                                                    4.5mm F.C Sheeting and Painted
                                                                                                                                                                                                                                                          Lighting                                                              and scouring. Stormwater flow other than
    Parking of vehicles or loading/unloading of vehicles on this roadway may cause a traffic
                                                                                                                                                                                                                                                                                                                                natural overland flow shall not be discharged       (Raked)
    hazard. During construction, maintenance or demolition of this building designated parking               8. PUBLIC ACCESS                                                                                                                             80% of all fixed internal lighting to be
    for workers and loading areas should be provided. Trained traffic management personnel                   Public access to construction and demolition sites and to areas under maintenance causes risk to workers and
                                                                                                                                                                                                                                                          energy efficient by Fluorescent Light or                              onto neighbouring property.
    should be responsible for the supervision of these areas.                                                public. Warning signs and secure barriers to unauthorised access should be provided. Where electrical                                                                                                                                                                  Waterproofing & Water Resistant
    (for building where on-site loading/unloading is restricted)                                             installations, excavations, plant or loose materials are present they should be secured when not fully supervised.                           Compact Fluorescent Light (C.F.L.).                                                                                       Materials
    Construction of this building will require loading and unloading of materials on the                                                                                                                                                                                                                                        All stormwater drainage design is preliminary
    roadway. Deliveries should be well planned to avoid congestion of loading areas and                      9. OPERATIONAL USE OF BUILDING
                                                                                                                                                                                                                                                                                                                                and shall be confirmed by a licenced hydraulics     All wet area waterproofing is to
    trained traffic management personnel should be used to supervise loading/unloading                                                                                                                                                                    Builder / owner to supply Icon Building                                                                                   comply with AS3740, waterproofing
    areas.                                                                                                   This building has been designed as a residential building. If it, at a later date, is used or intended to be used as a                       Design with lighting mark up for drafting in                          designer.
    (for all buildings)                                                                                      workplace, the provisions of the Work Health and Safety Act 2011 or subsequent replacement Act should be                                                                                                                                                               wet areas in residential buildings.
    Busy construction and demolition sites present a risk of collision where deliveries and                  applied to the new use.                                                                                                                      final version.                                                                                                            NCC Vol2 P3.8.1.0
    other traffic are moving within the site. A traffic management plan supervised by trained                                                                                                                                                             Please supply the authur with sketch
    traffic management personnel should be adopted for the work site.                                        This building has been designed to requirements of the classification identified on the drawings. The specific                                                                                                                                                         All waterproofing material systems
                                                                                                                                                                                                                                                          layout as soon as possible.                                           Climate Code Requirements
                                                                                                             use of the building is not known at the time of the design and a further assessment of the workplace health and                                                                                                                                                        components to be installed to
    4. SERVICES                                                                                              safety issues should be undertaken at the time of fit-out for the end-user.                                                                                                                                        Energy efficiency assessor to confirm
                                                                                                                                                                                                                                                                                                                                                                                    manufacturers specification.
    Rupture of services during excavation or other activity creates a variety of risks including                                                                                                                                                                                                                                adequacy of proposed construction.
    release of hazardous material. Existing services are located on or around this site. Where               This building has been designed for the specific use as identified on the drawings. Where a change of use                                    Termite Risk Management                                                                                                   Instructions and material capability to
    known, these are identified on the plans but the exact location and extent of services may               occurs at a later date a further assessment of the workplace health and safety issues should be undertaken.                                                                                                        Provide insulation to N.C.C. code requirements
                                                                                                                                                                                                                                                          Method to be in accordance with the                                                                                       be checked prior to construction.
    vary from that indicated. Services should be located using an appropriate service (such as                                                                                                                                                                                                                                  or to BERS certification requirements.
    Dial Before You Dig), appropriate excavation practice should be used and, where                          10. OTHER HIGH RISK ACTIVITY                                                                                                                 NCC Part 3.1.3 and other relevant
    necessary, specialist contractors should be used.                                                        All electrical work should be carried out in accordance with Code of Practice: Managing Electrical Risks at the
    (in locations with underground power)                                                                    Workplace, AS/NZ 3012 and all licensing requirements.                                                                                        manufacturer specification. All new                                                                                       Termite Risk Management
    Underground power lines are located in or around this site. All underground power lines                  All work using Plant should be carried out in accordance with Code of Practice: Managing Risks of Plant at the                               work shall be protected from termite                                   Dimensions Note:
                                                                                                                                                                                                                                                                                                                                                                                    Method to be in accordance with the
    must be disconnected or carefully located and adequate warning signs used prior to any                   Workplace.                                                                                                                                   attack in accordance with AS 3600.1                                    All wall dimensions are taken from
    construction, maintenance or demolition commencing.                                                      All work should be carried out in accordance with Code of Practice: Managing Noise and Preventing Hearing                                                                                                                                                              NCC Part 3.1.3 and other relevant
    (in locations with overhead power lines )                                                                                                                                                                                                             "Protection of the Building from                                       the outside faces of the stud wall.
                                                                                                             Loss at Work.                                                                                                                                                                                                                                                          manufacturer specification. All new
    Overhead power lines are near or on this site. These pose a risk of electrocution if struck              Due to the history of serious incidents it is recommended that particular care be exercised when undertaking                                 Subterranean Termites AS2870 Part                                      (i.e. selected cladding over omitted for
    or approached by lifting devices or other plant and persons working above ground level.                  work involving steel construction and concrete placement. All the above applies.                                                                                                                                                                                       work shall be protected from termite
                                                                                                                                                                                                                                                          1 New Building Slabs.                                                  clarity excluding brick veneer walls).
    Where there is a danger of this occurring, power lines should be, where practical,                                                                                                                                                                                                                                                                                              attack in accordance with AS 3600.1
    disconnected or relocated. Where this is not practical adequate warning in the form of
    bright coloured tape or signage should be used or a protective barrier provided.                                                                                                                                                                                                                                                                                                "Protection of the Building from
                                                                                          Revision Schedule                                  Project Address :                                                                   Sheet Name:                                                     Project Status:        Project Number:                                             Subterranean Termites AS2870 Part
                                                                                      Number Description    Date Issued by                   No. 49 Donnellys Road, Ridgewood                                                    General Notes                                                   WD                     20-060                                                      1 New Building Slabs.
                                                                                      1     WD           20/01/20 BJH
                                                                                                                                             Client Name :                                                                       Project Issue Date :                                            Q.B.C.C Lisence No.    Sheet Number:
Email: [email protected]
Website: www.iconbuildingdesign.com.au                                                                                                       Rhys & Monique                                                                      20/01/2021                                                      126221                 01
C COPYRIGHT The Drawing and the design depicted on this sheet remains the property of Icon Building design. Reproduction in part or whole is prohibited unless written permission is obtained from Icon Building Design. Plans are design for use on the job address specified in the titleblock only.

Used in these records

About this file

File size
11.7 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment D - Proposed Primary Dwelling Building Plans.pdf · 11.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.