Council archive · source document
Attachment D - Proposed Primary Dwelling Building Plans · MCU22/0135
Plans and drawings: the text below has words only, no drawings.
Very large file (11.7 MB): may take a few minutes to open.
Hazards Identification & Risk Control GENERAL INFORMATION GENERAL NOTES GENERAL INFORMATION
1. FALLS, SLIPS, TRIPS 5.. MANUAL TASKS Construction of this building to be in accordance with the The builder is responsible to check all
a) WORKING AT HEIGHTS Components within this design with a mass in excess of 25kg should be lifted by two or more workers or by
following Australian governing bodies. existing services prior to beginning any Minimum Design Standards
DURING CONSTRUCTION mechanical lifting device. Where this is not practical, suppliers or fabricators should be required to limit the
Wherever possible, components for this building should be prefabricated off-site or at component mass. construction. Construction of this building to be in
ground level to minimise the risk of workers falling more than two metres. However, All material packaging, building and maintenance components should clearly show the total mass of packages ♦ National Construction Code (NCC) accordance with the following Australian
construction of this building will require workers to be working at heights where a fall in and where practical all items should be stored on site in a way which minimises bending before lifting. Advice
excess of two metres is possible and injury is likely to result from such a fall. The builder should be provided on safe lifting methods in all areas where lifting may occur. ♦ Queensland Development Code # Denotes cavity slider to manufactuers governing bodies.
should provide a suitable barrier wherever a person is required to work in a situation where Construction, maintenance and demolition of this building will require the use of portable tools and equipment. ♦ Standard Building Regulation 2006 specification, frames containing cavity sliders ♦ National Construction Code (NCC)
falling more than two metres is a possibility. These should be fully maintained in accordance with manufacturer’s specifications and not used where faulty or
DURING OPERATION OR MAINTENANCE (in the case of electrical equipment) not carrying a current electrical safety tag. All safety guards or devices ♦ Local government planning policies to be 90mm minimum U.N.O ♦ Queensland Development Code
Cleaning and maintenance of windows, walls, roof or other components of this building will should be regularly checked and Personal Protective Equipment should be used in accordance with ♦ Estate Design Guidelines ♦ Standard Building Regulation 2006
require persons to be situated where a fall from a height in excess of two metres is manufacturer’s specification. ♦ Local government planning policies
possible. Where this type of activity is required, scaffolding, ladders or trestles should be Builder to verify all dimensions prior to
used in accordance with relevant codes of practice, regulations or legislation. 6. HAZARDOUS SUBSTANCES Roof Construction beginning construction work. ♦ Estate Design Guidelines
Cleaning and maintenance of windows, walls, roof or other components of this building will ASBESTOS
require persons to be situated where a fall from a height in excess of two metres is (for alterations to a building constructed prior to 1990)
Colorbond sheet metal to be fixed in accordance with
possible. Where this type of activity is required, scaffolding, fall barriers or Personal This building was constructed prior to 1990 and therefore may contain asbestos either in cladding material or in manufactures specification. Electric HWS to minimum energy efficiency Site Plan Notes
Protective Equipment should be used in accordance with relevant codes of practice, fire retardant insulation material. The builder should check and, if necessary, take appropriate action before All ridge capping, steps, hips valleys and vent flashings to
regulations or legislation. demolishing, cutting, sanding, drilling or otherwise disturbing the existing structure.
regulations. Surface water drainage must be prevented
Anchorage points for portable scaffold or fall arrest devices have been included in the (for alterations to a building constructed prior to 1986) provide waterproofing system. from entering the building with FGL sloping
design for use by maintenance workers. Any persons engaged to work on the building This building was constructed prior to 1986 and therefore is likely to contain asbestos either in cladding material Toilets: minimum 4-star dual flush, as rated
after completion of construction work should be informed about the anchorage points. or in fire retardant insulation material. The builder should check and, if necessary, take appropriate action before away from the building & finished slab levels.
demolishing, cutting, sanding, drilling or otherwise disturbing the existing structure. Provide reflective foil backed sarking to underside of roof under the Water Efficiency and Labeling The builder is responsible to check all existing
b) SLIPPERY OR UNEVEN SURFACES POWDERED MATERIALS sheeting. Colorbond guttering and PVC Downpipes to be Standards scheme (WELS). services prior to beginning construction.
FLOOR FINISHES Many materials used in the construction of this building can cause harm if inhaled in powdered form. Persons
Specified finishes have been selected to minimise the risk of floors and paved areas working on or in the building during construction, operational maintenance or demolition should ensure good connected to Stormwater systems in accordance with the
becoming slippery when wet or when walked on with wet shoes/feet. Any changes to the ventilation and wear Personal Protective Equipment including protection against inhalation while using powdered local authority. Tapware: minimum 3-star WELS rated for Stabilised cut and fill batters to be a
specified finish should be made in consultation with the designer or, if this is not practical, material or when sanding, drilling, cutting or otherwise disturbing or creating powdered material.
surfaces with an equivalent or better slip resistance should be chosen. kitchen sinks, basins and laundry troughs. minimum of 1000mm away from footings
The owner is responsible for the selection of surface finishes in the pedestrian trafficable Roof water requirements and calculations are provided as a and are to have 1 in 1 max. gradient.
areas of this building. Surfaces should be selected in accordance with AS HB 197:1999 TREATED TIMBER guide. Ensure a qualified plumber/ hydraulics consultant
and AS/NZ 4586:2004. The design of this building includes provision for the inclusion of treated timber within the structure. Dust or
Showerheads: minimum 3-star WELS rated Grade finished surface level
fumes from this material can be harmful. Persons working on or in the building during construction, operational reviews the downpipe layouts prior to construction. showerheads. from slab and footings.
c) STEPS, LOOSE OBJECTS AND UNEVEN SURFACES maintenance or demolition should ensure good ventilation and wear Personal Protective Equipment including
Due to design restrictions for this building, steps and/or ramps are included in the building protection against inhalation of harmful material when sanding, drilling, cutting or using treated timber in any
which may be a hazard to workers carrying objects or otherwise occupied. Steps should be way that may cause harmful material to be released. Do not burn treated timber. Icon Building Design has provided downpipe locations as a SD Smoke alarms complying with AS 3786 Position of proposed building to
clearly marked with both visual and tactile warning during construction, maintenance, VOLATILE ORGANIC COMPOUNDS guide only. Layout to be checked for compliance by qualified to be installed and connected to consumer be verified by builder on site.
demolition and at all times when the building operates as a workplace. Many types of glue, solvents, spray packs, paints, varnishes and some cleaning materials and disinfectants
Building owners and occupiers should monitor the pedestrian access ways and in have dangerous emissions. Areas where these are used should be kept well ventilated while the material is persons prior to ordering and construction. mains power in accordance with NCC part Location of existing services to be
particular access to areas where maintenance is routinely carried out to ensure that being used and for a period after installation. Personal Protective Equipment may also be required. The All slotted gutters and downpipes to be installed to NCC and 3.7.2 verified by builder prior to construction.
surfaces have not moved or cracked so that they become uneven and present a trip manufacturer’s recommendations for use must be carefully considered at all times.
hazard. Spills, loose material, stray objects or any other matter that may cause a slip or trip SYNTHETIC MINERAL FIBRE
or AS3500 (relevant parts). Materials used are to be
hazard should be cleaned or removed from access ways. Fibreglass, rockwool, ceramic and other material used for thermal or sound insulation may contain synthetic compatible with all components upstream and down stream. All electrical appliances and plumbing symbols Wall Construction
Contractors should be required to maintain a tidy work site during construction, mineral fibre which may be harmful if inhaled or if it comes in contact with the skin, eyes or other sensitive parts
maintenance or demolition to reduce the risk of trips and falls in the workplace. Materials or the body. Personal Protective Equipment including protection against inhalation of harmful material should be
are diagrammatical. Refer to builders Wall framing to be constructed in
for construction or maintenance should be stored in designated areas away from access used when installing, removing or working near bulk insulation material. Surface water drainage must be prevented from entering the specification for details all fixtures. accordance with engineering specification
ways and work areas. TIMBER FLOORS building with FGL sloping away from the building & finished and must not differ from certification
This building contains timber floors which have an applied finish. Areas where finishes are applied should be
2. FALLING OBJECTS kept well ventilated during sanding and application and for a period after installation. Personal Protective slab levels. The builder is responsible to check all existing Seal wet areas in accordance with N.C.C. Vol. 2. covered by the Form 15. Cladding
LOOSE MATERIALS OR SMALL OBJECTS Equipment may also be required. The manufacturer’s recommendations for use must be carefully considered at services prior to beginning construction. Part 3.8.1. Slope floor surface towards fw systems to be fixed in accordance with
Construction, maintenance or demolition work on or around this building is likely to involve all times.
persons working above ground level or above floor levels. Where this occurs one or more (floor wastes) manufactures specification.
of the following measures should be taken to avoid objects falling from the area where the Position of proposed building to be verified by builder on Provide lighting in accordance with N.C.C. Vol. 2.
work is being carried out onto persons below. 7. CONFINED SPACES
1. Prevent or restrict access to areas below where the work is being carried out. EXCAVATION
site. Location of existing services to be Part 3.8.4.2 & 3 Wet Areas
2. Provide toeboards to scaffolding or work platforms. Construction of this building and some maintenance on the building will require excavation and installation of verified by builder prior to construction. Provide ventilation in accordance with N.C.C. Floors in "Wet Areas" to be impervious in
3. Provide protective structure below the work area. items within excavations. Where practical, installation should be carried out using methods which do not require
4. Ensure that all persons below the work area have Personal Protective workers to enter the excavation. Where this is not practical, adequate support for the excavated area should be
Vol. 2. Part 3.8.5 accordance with Australian Standards.
Equipment. provided to prevent collapse. Warning signs and barriers to prevent accidental or unauthorised access to all Termite method to be in accordance with the NCC Part 3.1.3 Mechanical ventilation in accordance with N.C.C Finish and fall gradients to floor wastes.
BUILDING COMPONENTS excavations should be provided. and other relevant manufacturer specification. All new work Vol. 2. and AS1668.2
During construction, renovation or demolition of this building, parts of the structure
including fabricated steelwork, heavy panels and many other components will remain shall be protected from termite attack in accordance with AS Glazing Construction
standing prior to or after supporting parts are in place. Contractors should ensure that ENCLOSED SPACES 3600.1 "Protection of the Building from Subterranean Powdercoated Aluminum Frame
temporary bracing or other required support is in place at all times when collapse which
may injure persons in the area is a possibility. Enclosed spaces within this building may present a risk to persons entering for construction, maintenance or Termites AS2870 Part 1 New Building Slabs. Windows in accordance with AS 4055
Mechanical lifting of materials and components during construction, maintenance or any other purpose. The design documentation calls for warning signs and barriers to unauthorised access. Stormwater Note
demolition presents a risk of falling objects. Contractors should ensure that appropriate These should be maintained throughout the life of the building. Where workers are required to enter enclosed All stormwater drainage shall be in accordance "wind loads for residential" & AS 1288
lifting devices are used, that loads are properly secured and that access to areas below the spaces, air testing equipment and Personal Protective Equipment should be provided. Smoke detectors "Glass in Buildings selection and
with A.S. 3500.3.
load is prevented or restricted. SMALL SPACES To comply with A.S. 3786 - smoke alarms. installation"
Some small spaces within this building will require access by construction or maintenance workers. The design Approved smoke detectors with mains
All stormwater drainage shall be in accordance
3. TRAFFIC MANAGEMENT documentation calls for warning signs and barriers to unauthorised access. These should be maintained supplied power and battery backup. Soffit Construction
throughout the life of the building. Where workers are required to enter small spaces they should be scheduled with S.C.R.C. guidelines to minimise erosion
(for building on a major road, narrow road or steeply sloping road) so that access is for short periods. Manual lifting and other manual activity should be restricted in small spaces. 4.5mm F.C Sheeting and Painted
Lighting and scouring. Stormwater flow other than
Parking of vehicles or loading/unloading of vehicles on this roadway may cause a traffic
natural overland flow shall not be discharged (Raked)
hazard. During construction, maintenance or demolition of this building designated parking 8. PUBLIC ACCESS 80% of all fixed internal lighting to be
for workers and loading areas should be provided. Trained traffic management personnel Public access to construction and demolition sites and to areas under maintenance causes risk to workers and
energy efficient by Fluorescent Light or onto neighbouring property.
should be responsible for the supervision of these areas. public. Warning signs and secure barriers to unauthorised access should be provided. Where electrical Waterproofing & Water Resistant
(for building where on-site loading/unloading is restricted) installations, excavations, plant or loose materials are present they should be secured when not fully supervised. Compact Fluorescent Light (C.F.L.). Materials
Construction of this building will require loading and unloading of materials on the All stormwater drainage design is preliminary
roadway. Deliveries should be well planned to avoid congestion of loading areas and 9. OPERATIONAL USE OF BUILDING
and shall be confirmed by a licenced hydraulics All wet area waterproofing is to
trained traffic management personnel should be used to supervise loading/unloading Builder / owner to supply Icon Building comply with AS3740, waterproofing
areas. This building has been designed as a residential building. If it, at a later date, is used or intended to be used as a Design with lighting mark up for drafting in designer.
(for all buildings) workplace, the provisions of the Work Health and Safety Act 2011 or subsequent replacement Act should be wet areas in residential buildings.
Busy construction and demolition sites present a risk of collision where deliveries and applied to the new use. final version. NCC Vol2 P3.8.1.0
other traffic are moving within the site. A traffic management plan supervised by trained Please supply the authur with sketch
traffic management personnel should be adopted for the work site. This building has been designed to requirements of the classification identified on the drawings. The specific All waterproofing material systems
layout as soon as possible. Climate Code Requirements
use of the building is not known at the time of the design and a further assessment of the workplace health and components to be installed to
4. SERVICES safety issues should be undertaken at the time of fit-out for the end-user. Energy efficiency assessor to confirm
manufacturers specification.
Rupture of services during excavation or other activity creates a variety of risks including adequacy of proposed construction.
release of hazardous material. Existing services are located on or around this site. Where This building has been designed for the specific use as identified on the drawings. Where a change of use Termite Risk Management Instructions and material capability to
known, these are identified on the plans but the exact location and extent of services may occurs at a later date a further assessment of the workplace health and safety issues should be undertaken. Provide insulation to N.C.C. code requirements
Method to be in accordance with the be checked prior to construction.
vary from that indicated. Services should be located using an appropriate service (such as or to BERS certification requirements.
Dial Before You Dig), appropriate excavation practice should be used and, where 10. OTHER HIGH RISK ACTIVITY NCC Part 3.1.3 and other relevant
necessary, specialist contractors should be used. All electrical work should be carried out in accordance with Code of Practice: Managing Electrical Risks at the
(in locations with underground power) Workplace, AS/NZ 3012 and all licensing requirements. manufacturer specification. All new Termite Risk Management
Underground power lines are located in or around this site. All underground power lines All work using Plant should be carried out in accordance with Code of Practice: Managing Risks of Plant at the work shall be protected from termite Dimensions Note:
Method to be in accordance with the
must be disconnected or carefully located and adequate warning signs used prior to any Workplace. attack in accordance with AS 3600.1 All wall dimensions are taken from
construction, maintenance or demolition commencing. All work should be carried out in accordance with Code of Practice: Managing Noise and Preventing Hearing NCC Part 3.1.3 and other relevant
(in locations with overhead power lines ) "Protection of the Building from the outside faces of the stud wall.
Loss at Work. manufacturer specification. All new
Overhead power lines are near or on this site. These pose a risk of electrocution if struck Due to the history of serious incidents it is recommended that particular care be exercised when undertaking Subterranean Termites AS2870 Part (i.e. selected cladding over omitted for
or approached by lifting devices or other plant and persons working above ground level. work involving steel construction and concrete placement. All the above applies. work shall be protected from termite
1 New Building Slabs. clarity excluding brick veneer walls).
Where there is a danger of this occurring, power lines should be, where practical, attack in accordance with AS 3600.1
disconnected or relocated. Where this is not practical adequate warning in the form of
bright coloured tape or signage should be used or a protective barrier provided. "Protection of the Building from
Revision Schedule Project Address : Sheet Name: Project Status: Project Number: Subterranean Termites AS2870 Part
Number Description Date Issued by No. 49 Donnellys Road, Ridgewood General Notes WD 20-060 1 New Building Slabs.
1 WD 20/01/20 BJH
Client Name : Project Issue Date : Q.B.C.C Lisence No. Sheet Number:
Email: [email protected]
Website: www.iconbuildingdesign.com.au Rhys & Monique 20/01/2021 126221 01
C COPYRIGHT The Drawing and the design depicted on this sheet remains the property of Icon Building design. Reproduction in part or whole is prohibited unless written permission is obtained from Icon Building Design. Plans are design for use on the job address specified in the titleblock only.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment D - Proposed Primary Dwelling Building PlansRelated documentApplication case desk ↗
About this file
- File size
- 11.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.