Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

Attachment 2 - Infrastructure Agreement NSBC (Lot 2 SP110885) dated 3rd October 2003

Attached to the e-mail Reconfiguring a Lot (1 lot into 19) - RAL18/0023.

of 26

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Page 11

43 Deemed Contribution to Community Infrastructure — Private Open Space

The Council recognises that the maintenance of Open Space Areas C, E, and G, and part of
OS2 and comprising approximately 2.329 hectares (subject to survey) as private open
Space, and its on-going maintenance, is a commitment on the part of the Applicant of land,

~

 

}

web

5

6

44

cm)

5.1

6.1

to meet the environmental requirements associated with the proposed development and

shall be taken to be equivalent to a contribution
infrastructure.

Future Conditions/Infrastructure Charges

Having regard to the matters stated in Clauses 4.2 and
otherwise requested or agreed to by the Applicant:

by the Applicant to community

4.3, the Council agrees that unless

(a) Applications for development approvals in respect of Future Stages on the Land

shall be immune from conditions requiring; and

(b) The Land shall be immune from future infrastructure charges or levies in respect

of;

any further dedication of land, and any ac
contributions or charges on account of parks

quisition of other land, or the payment of
» conservation reserves, conservation areas,

Open space, public recreational facilities (land, pedestrian and cycle pathways), nature

conservation, bushland preservation and like purposes.

Future Buffers to Open Space Areas

Recognising the amount of the land to be dedicated as public open space in O
Area A and Open Space Area B and the areas to be set-aside and managed as p

DRAINAGE/WATERWAY MANAGEMENT

External Stormwater Works

pen Space

Nothing in this Agreement affects the ability of the Council to lawfully impose conditions
requiring the construction or augmentation of stormwater Systems external to the site in
response to applications for Development Approvals relating to Future Stages of the Shire

Business Centre.
EXTERNAL ROADWORKS

Design Standards

The following design and construétion standards shall
under this document and the Conditions of Approval:

apply to roadworks constructed
Log in to download the original file

Attachment 2 - Infrastructure Agreement NSBC (Lot 2 SP110885) dated 3rd October 2003.pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.