Skip to the record
Search everything, all in one place.

Original source · versioned page text

Attachment 2 - Infrastructure Agreement NSBC (Lot 2 SP110885) dated 3rd October 2003

Attached to the e-mail Reconfiguring a Lot (1 lot into 19) - RAL18/0023.

of 26

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

 

 
 
    

 

CONTENTS

INTERPRETATION ....ccscssscsssssssssssestensetessstsssssssnsstnasssssnsetsnsstssasesssnsisesuenssitseesecce 4
11 NAM seessssssescsesssseeesssececcssssssnsnessnsssesnsssseassssseesansstsnssssseneutansssesesesssnisunneeeseee! 4
1.2 Commencement ...ccsccsesssiessstessinetusessstsniustinssiinnunttiinnisssec 4
1.3-  Termination......... 4
14 Interpretation... +4
1.5 Definitions........ sheseeesseeeeees 6
1.6 Other Expressions .........ccscssssssccssssssssssseessesesssnsseessssssssstseecceeseeeecce id
1.7 When Development Approvals Take Effect .........sssssccsssssssssssssscssssssesssesssssssssessece 10-
INFRASTRUCTURE AGREEMENT ........sssssssssssssssssssssesenseissstssusssssusteseeuteseeceeccce, 10
OBLIGATIONS OF PARTIES seseseasseseesnssescssconecessusssesesnssessessesieaesesstessssecenecesscassecsesescanecass 10
3.1

3.2

3.3

OPEN SPACE .wssccssstsseseacsee sesstssustneenstntntsetstsesastnstetntastietisitiranestuseseese 110

4.1 OSA and OSB (Open Space Areas A and B) ceeseessessssssseessecscsesssecssecscsssssveseneessasess
4.2 Deemed Contribution to Community Infrastructure — Public Open Space vee
4.3 Deemed Contribution to Community Infrastructure — Private Open Space ...

4.4 Future Conditions/Infrastructure Charges
4.5 Future Buffers to Open Space Areas

  
  
  
 
 

DRAINAGE/WATERWAY MANAGEMENT............ loecessseseceensneesnaesssseeserenseatseneseasecsenses ll

5.1 External Stormwater Works........ssssssssssssesssssussssersssssssssessessssssspusssseneeeseeeseseecce 11

EXTERNAL ROADWORKS

6.1
6.2
6.3
6.4
6.5
6.6

 

7A Infrastructure within the Proposed Development .........:ccscscssessssssesccoseeccessess..
7.2 Infrastructure External to the Proposed Development.

 

CONDITIONS PRECEDENT setaeeseneneneessssesesconcatsseseseecssssasssesusassesusssssssnsacaesuasassssscavaseanence 16
8.1 Conditional Upon Approval of Development Application.
8.2 Infrastructure Agreement Terminates .-.ccccccsssssssescssssssss...
8.3 Conditional Upon Applicant Becoming Owner of Land... .
8.4 Failure to Complete Contract.........sssssssssssssssusssssssssnttitiisssssesssssecccce, 17

  
Log in to download the original file

Attachment 2 - Infrastructure Agreement NSBC (Lot 2 SP110885) dated 3rd October 2003.pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.