Council archive · source document
Compiled Approved Plans MCU21 0117.02 & OPW21 0199.02 · MCU21/0117.02
Plans and drawings: the text below has words only, no drawings.
Very large file (18.2 MB): may take a few minutes to open.
Original PDF page 15, section 1. The text section number identifies this passage in the reader.
notes :
1.8m HIGH, 17m LONG ACOUSTIC BARRIER
1 The designs, drawings and specification are copyright and always
remain the property of Blackburne Jackson Design Pty Ltd.
ACOUSTIC PANEL WALL max. 2000mm TIMBER PALING FENCE
ABOVE NATURAL GROUND (FN6) ON TOP OF BLOCK EVENLY DISTRIBUTED MIXED REED PLANTING 2 Before commencing construction:
107.4m
STONE PITCHED
107.2m
8 LOM lim RETAINING WALL - TOP TO BIO-RETENTION BASIN INCLUDING: -Verify all dimensions and levels.
1 FLI sch STONE PITCHED - 30 FIC nod STORMWATER
MAKE GOOD 1 CRI ped OF FENCE TO BE max. -Verify location and levels of all services on site.
106.2m
106.0m
105.8m
105.6m
105.4m
SPREADER (UNDER
107.0m
6 ALP cae 4 ACM sub STORMWATER SWALE - 30 JUN usi -Verify that floor levels and finished levels will enable connection to
ANY DAMAGE 2000mm ABOVE
106.6m
10 DIA lit
106.4m
1 ELA obo 4 BAN rob 4 MYO par 1 STE sin 1 FLI sch DECK)
3 ALP cae DRAIN (UNDER 2 MEL qui - 30 LOM hys services.
TO EXISTING 1 STE sin 1 DOR exc NATURAL GROUND
106.8m
10 COM con DECK) BIORETENTION BASIN OVERFLOW HEADWALL
TURF 4 MEL cal (FN2)
4 SYZ bus 14 DIE gra TO CIVIL ENGINEER'S 3 Do not scale this drawing. When in doubt refer to Architects.
DETAIL (UNDER DECK)
issue amendment log by date
A OPERATIONAL WORKS ISSUE KM 04-10-23
FN3
PF1
FN3
PF1
B OPERATIONAL WORKS ISSUE NQ 14-11-23
2 ALP cae
FN3
FN3
C OPERATIONAL WORKS ISSUE NQ 05-12-23
D OPERATIONAL WORKS ISSUE NQ 19-12-23
5 MYO par 3 MYO par
5 HAR mee E OPERATIONAL WORKS ISSUE NQ 13-03-24
ACOUSTIC PANEL WALL 5 WES mun
8 LOM con 2 CRI ped F OPERATIONAL WORKS ISSUE NQ 19-03-24
max. 2000mm ABOVE 2 COR pin 2 CRI ped 2 ZAM fur
NATURAL GROUND (FN5) G OPERATIONAL WORKS ISSUE NQ 16-05-24
10 MOL cap 3 DOR exc 1 BAC cit
4 SYZ bea H REVISED OPERATIONAL WORKS ISSUE NQ 26-05-25
10 CAR des I REVISED OPERATIONAL WORKS ISSUE NQ 08-08-25
6 RHA exc
J REVISED OPERATIONAL WORKS ISSUE LR 14-08-25
14 MOL cap
EXISTING FOOTPATH
GARDEN EDGE TO DETAIL
GARDEN EDGE TO DETAIL 12 SYZ sup
18m LONG, 2m HIGH ACOUSTIC BARRIER
TIMBER PALING
STEPPER ACCESS PATH WITH STEPPER ACCESS PATH WITH FENCE ON TOP OF
GRAVEL SURROUNDS TO DETAIL GRAVEL SURROUNDS TO DETAIL BLOCK RETAINING
WALL - TOP OF
FN3
GARDEN EDGE TO DETAIL GARDEN EDGE TO DETAIL FENCE TO BE max.
20 HAR mee
S T R E E T
2000mm ABOVE
STEPPER ACCESS PATH WITH NATURAL GROUND
GRAVEL SURROUNDS TO DETAIL 30 LOM hys (FN2)
STEPPER ACCESS PATH WITH
13 CAL ros GRAVEL SURROUNDS TO DETAIL
consultants:
8 ACM sub STRUCTURAL ENGINEER :
[company name]
FN3 PH : [number] [@email here]
GATE GATE
1 ELA obo CIVIL ENGINEER :
FN3 GATE [company name]
25125
07
10 LIR str PH : [number] [@email here]
06
FN3
2 CUP ana
4 DIA cae
01 02 3 MOL cap 3 MOL cap 03 04 3 BLE ind 3 BLE ind 05 3 BLE ind 3 BLE ind 08 GATE HYDRAULIC ENGINEER :
[company name]
PH : [number] [@email here]
10 DIA cae CouncilELECTRICAL
Annotation;& MECHANICAL ENGINEER :
E L M
[company name]
6 ALP zer
9 DIA lit Areas of PHcantilevered
: [number] [@email here]
planter and
FN3
supporting decking to rear boudary (shown
7 WES mun 9 DIA lit
in red dotted linework) is to be removed
and is not approved.
6 ALP zer 20 DIA cae
105.4m
8 ACM red
3 ZAM fur 12 DIA lit 3 ZAM fur 4 HYM lit
EXISTING TREES 4 SYZ sup 10 DIA cae 12 DIA lit
2 MYO bon
TO BE RETAINED
& PROTECTED
FROM DAMATE
6 MYO bon
TIMBER PALING FENCE max. 2000mm
4 LOM lim ABOVE NATURAL GROUND (FN3)
1100mm HIGH ALUMINIUM
FENCE SET BACK 1000mm
FROM PROPERTY 1 ELA obo
BOUNDARY ON TOP OF 8 SYZ sup 6 LOM lon 8 CAL sli 6 LOM lon
BLOCK RETAINING WALL
(FN8) 8 SYZ sup 5 LOM lon 5 LOM lon
8 DIA lit
REFER 7883_L03-01 FOR CONTINUATION
4 PAN jas 12 DIA lit
107.6m
RENDERED BLOCK WALL
1000
max. 2000mm ABOVE
107.4m
107.2m
107.0m
106.8m
106.6m
106.4m
106.2m
NATURAL GROUND (FN5) 500
6 ALP cae
106.2m
2 HYM lit FN3
6 MOL cap
10 LOM lon GATE
4 PAN jas 9 MEL mal
105.6m
2 ELA eum
09 10
OPERATIONAL WORKS
10 DIA cae
11 3 BLE ind
2 MYO bon
3 BLE ind
2 MYO bon
12 8 PHO gla
4 PAN jas NOT FOR CONSTRUCTION
8 ALP cae
CHECKED : ……...………………………………….
12 MYO bon
10 LOM lon
TIMBER PALING FENCE max.
2000mm ABOVE NATURAL
GROUND (FN3) 24 DIA cae
TIMBER PALING A R CHIT E CT UR E | L A NDS CA P E | INT E R IOR | P ROJECT MA NA G E ME NT
FENCE ON TOP OF
BLOCK RETAINING
FN3 WALL - TOP OF
STEPPER ACCESS PATH WITH 37 Aerodrome Rd Maroochydore Qld
106.4m GRAVEL SURROUNDS TO DETAIL STEPPER ACCESS PATH WITH FENCE TO BE max.
GRAVEL SURROUNDS TO DETAIL P.O. Box 154 Cotton Tree QLD 4558 phone 07 5443 3200
GARDEN EDGE TO DETAIL 2000mm ABOVE
4 PAN jas NATURAL GROUND email [email protected] fax 07 5443 4030
GARDEN EDGE TO DETAIL (FN2)
GATE
project:
NOOSA COUNCIL PROPOSED TOWNHOUSE DEVELOPMENT,
10 DIA cae
APPROVED PLAN RENDERED BLOCK WALL max.
54 ELM ST. & 5 PEARL ST. COOROY
MCU21/0117.02 & OPW21/0199.02 2000mm ABOVE NATURAL
GROUND (FN5)
8 DIE gra
client:
4 PAN jas 7 PHO gla
10 APRIL 2026 106.6m 4 MYO bon 8 LOM con
4 MYO par ALTUM PROPERTY GROUP
5 CAL ros 105.8m
6 DIE gra 4 SYZ bea
1 ELA eum
title:
FN3
RENDERED BLOCK WALL max. 4 MEL mal
8 ALP cae
LANDSCAPE PLANTING
PLAN
FN3
2000mm ABOVE NATURAL
LANDSCAPE PLANTING See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Compiled Approved Plans MCU21 0117.02 & OPW21 0199.02Related documentApplication case desk ↗
About this file
- File size
- 18.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.