Earthworks and Retaining Walls
29. All fill and associated batters must be undertaken in accordance with an Operational Works
approval, be generally in accordance with Barlow Shelley’s Earthworks Plan (P01) dated 20
June 2022 and contained entirely within the subject site unless written permission from the
respective landowner(s) is provided to Council.
Damage to Services and Assets
30. Any damage caused to existing services and assets as a result of the development works must
be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
a. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
Waste Management
31. A waste storage area must be maintained in accordance with Planning Scheme Policy PSP9
Waste Management and the Noosa Plan’s Waste Management Code. The waste storage area
must be correctly sized for all refuse and recycling containers.
Page 4 of 4
4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.