Original source · versioned page text
2019-07-18 Ordinary Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING AGENDA 18 JULY 2019
Construction Management Plan – Stages C & D
74. A Construction Management Plan must be submitted to Council prior to a pre-start
meeting and must specifically address the following:
a. Traffic Management during all aspects of the construction phase including:
i. A Traffic Management Control Plan in accordance with Manual of
Uniform Traffic Control Devices (MUTCD) detailing all temporary
signage and traffic control measures prior to construction
ii. Adequate parking arrangements for patrons utilising the site and
construction workers
iii. Proposed fencing to the site during the construction phase of the
development
iv. No queuing of trucks is permitted on Goodchap St or Eumundi Noosa
Road, especially prior to 7.00am. Further parked trucks must have
engines turned off
b. Maintenance and protection of the adjoining Lake Doonella Bush Reserve
c. Maintenance and protection of water quality and existing drainage lines
through the construction site through the implementation of appropriate
erosion and sediment control measures
d. Works programme identifying key components of the works and their
respective durations
e. Establishment of a communication protocol with the general public,
adjoining owners (especially residential), emergency services and local
businesses to advise of agreed construction times, impacts on traffic and
services and other relevant issues
f. Identification of complaint management procedures including:
i. contact details for the on-site manager
ii. dispute resolution procedures
For haulage operations involving significant volumes of fill material or excavated
material being transported onto or off the site: details on the location of external
fill sites/sources, the haulage route, type of vehicle to be utilised during filling
operations and frequency of usage. Any damage to the existing road system as
a result of haulage operations shall be fully repaired at the applicant’s expense.
Landscaping
75. The area between Stage D and the extent of the northern boundary must be
densely landscaped at a minimum width of 2 metres in accordance with an
Operational Works approval. Screening vegetation must be planted in accordance
with Council’s Planning Scheme Policy PSP3 Landscaping Plants and Guidelines.
The planted vegetation must consist of native, endemic species.
Nature and Extent of Approved Use - Veterinary
76. Service vehicle movements associated with the approved use (including loading
and unloading) must not occur outside the hours of 7am to 7pm. The requirements
of this condition must be included in the Community Management Statement for
anybody corporate for the subject site
Sunset Clause
77. Pursuant to s88(1) of the Planning Act 2016, the uncompleted aspects of the
approval for Stage D lapses if the whole of the approved use has not happened
18 July 2025.
Page 15 of 39
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.