ORDINARY MEETING AGENDA 18 JULY 2019
26. All works must be constructed and work procedures undertaken in accordance
with:
a. The approved plans, the approved amended plans and the conditions
detailed in this Decision Notice.
b. The document ‘Proposed Cartwright Village Extension – Carramar, Noosa
Care Integrated Water Management Plan Version 4 by Callaghan & Toth
dated June 2019.
c. The document ‘Noosa Care Inc Cartwright Village Extension Carramar,
Cooroy Noosa Road, Tewantin Preliminary Design of Stormwater Detention
Volume’ by BSM dated 21 December 2017.
d. The document ‘Flood Study Noosa Care – Carramar’ by Cardno dated 24
July 2017.
e. The Addendum Letter by Cardno (document number WE17064) dated 23
March 2018.
f. The Technical Memorandum by Cardno (ref WE17064_Carramar_TM01)
dated 27 September 2018.
g. A minimum Finished Floor Level (FFL) of the Aged Care Facility and any
associated facilities at 8.80m AHD.
h. A minimum Finished Floor Level (FFL) of the Independent Living Units of
8.80m AHD.
i. All relevant Noosa Council Planning Scheme Policies, standard drawings,
standard specifications and guidelines are to be adhered to.
36. Prior to obtaining a Development Permit for Operational Works the land area
identified as being to the east of the proposed wetland fence on Middap
Architecture Pty Ltd - Plan A102A (Proposed Site Works Plan February 2019) be
dedicated to Council in fee simple on trust for the purpose of an Environmental
Park.
The land to be dedicated is “non-trunk infrastructure” for the purposes of the
Planning Act 2016.
B. Rectify item 9 within the Decision Notice to reflect that a further Development Permit for
Material Change of Use is not required.
C. Include the following additional conditions:
46. Privacy screening to the northern elevation as detailed on the approved plans must
be designed and maintained to ensure that there is no overlooking into the
adjoining residential properties.
47. All elements of the approved Integrated Stormwater Management Plan system
must be maintained in accordance with the Water by Design, Maintaining
Vegetated Stormwater Quality Treatment Assets or manufacturer’s maintenance
protocol where appropriate.
48. Stormwater management measures must be maintained in accordance with this
approval and a contract by an appropriate company to undertake maintenance in
accordance with this approval for a minimum 10 years must be signed and
provided to Council prior to the commencement of use.
D. Delegate the powers of Council under the Planning Act 2016 for minor change
applications for this development to the Chief Executive Officer.
E. Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
Carried.
Page 17 of 39