Original source · versioned page text
2022-05-19 Ordinary Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING AGENDA 19 MAY 2022
at maximum 3 metre centres with a maximum 3 metre height at
maturity.
16. All landscape works must be established and maintained in accordance with the
approved design for the life of the development, and in a manner that ensures
healthy, sustained and vigorous plant growth. All plant material must be allowed
to grow to full form and be refurbished when its life expectancy is reached.
17. The site must be regularly maintained at all times with all landscape works
maintained generally in accordance with the approved design for the life of the
development.
Damage to infrastructure
18. Any damage to footpaths, street plantings, natural vegetation/trees kerb and
channel, bridges or roadways must be repaired or reinstated to at least pre-existing
conditions.
Stormwater Drainage
19. Stormwater runoff from the development must be disposed of on-site without
causing scour or damage to the subject site or any adjoining property.
B. Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
C. Advise the applicant to remove the demountable building (the former exchange building)
or obtain building approval within 90 days of the date of this approval.
D. Find the following matters relevant to the assessment and sufficient reason to approve
the application:
1. The proposal is minor in nature and is co-located within a site with existing
telecommunication facilities.
2. The proposal can be conditioned to comply with the amenity and character
elements sought by the Overall Outcomes in the Noosa Plan 2020.
7 OPW22/0029 DEVELOPMENT APPLICATION FOR OPERATIONAL WORKS
(PRESCRIBED TIDAL WORKS – NOOSA RIVER OYSTER HABITAT RESTORATION) FOR
NOOSA RIVER
That Council note the report by Coordinator Engineering to the General Committee Meeting
dated 16 May 2022 regarding Application No. OPW22/0029 for Operational Works (Prescribed
Tidal Works – Noosa River Oyster Habitat Restoration for Noosa River and
A. Approve the application in accordance with Referral Agency Conditions provided by
SARA on 7 April 2022 and the following conditions:
Approved Plans
20. Phase 1 – Pilot Phase is only approved as part of this development approval.
21. Development undertaken in accordance with this approval must generally comply
with the approved plans of development. The approved plans are listed in the
following table unless otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
NROR-2021-00 A General Notes & Site Selection 09/07/2021
NROR-2021-01 - Restoration Zones 20/05/2021
NROR-2021-02 A Module Designs 09/07/2021
NROR-2021-03 A Goat Island Restoration Site 09/07/2021
NROR-2021-04 A Tewantin Island Restoration Site 09/07/2021
NROR-2021-05 A Noosa Sound West Restoration Site 09/07/2021
NROR-2021-06 A Noosa Sound East Restoration Site 09/07/2021
Page 14 of 25
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.