ORDINARY MEETING AGENDA 19 MAY 2022
The CEMP should be submitted to Council for approval 20 business days prior to
the commencement of works.
34. A monitoring report must be provided to Council on a six-monthly basis for the first
year (and annually for the following 4 years) following completion of construction
works which details the results of restoration monitoring and evaluation, including
adaptive management measures taken and the success or otherwise of those
measures.
35. Upon completion of construction works, any construction debris or waste must be
removed from site and disposed of appropriately.
36. Lighting associated with the construction phase must be designed, installed,
operated and maintained in accordance with Section 3 of AS4282 Control of the
Obtrusive Effects of Outdoor Lighting.
37. Wastewater and sullage must only be disposed of at approved pumpout facilities.
38. Any construction and post construction activity must not impact on the condition of
the waterway, and is to be conducted so as not to breach the Environmental
Protection Act EPA (1994) and the Environmental Protection (Water) Policy 2009.
39. Certification by a Registered Professional Engineer of Queensland that states that
the oyster habitat restoration substrates are constructed in accordance with best
practice methods and is structurally sound must be submitted to Council. This
certification must be submitted to Council within three (3) months of the completion
of the works.
40. After completion, the proposed works must be maintained in a sound state of repair
in accordance with the approved plans
B. Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
8 FINANCIAL PERFORMANCE REPORT – APRIL 2022
That Council note the report by the Financial Services Manager (Acting) to the General
Committee Meeting dated 16 May 2022 outlining April 2022 year to date financial performance
against budget, including changes to the financial performance report with the inclusion of key
financial sustainability indicators.
9 OPERATIONAL PLAN PROGRESS REPORT – THIRD QUARTER 2021-22
That Council note the report by the Chief Executive Officer to the General Committee Meeting
dated 16 May 2022 regarding the 2021-22 Operational Plan and:
A. Note the progress report for the 2021-22 Operational Plan to 31 March 2022 provided
as Attachment 1; and
B. Note the status of Council’s Key Performance Indicators provided as Attachment 2.
Committee Recommendation
That the report of the General Committee dated 16 May 2022 be received and the recommendations
therein be adopted except where dealt with by separate resolution.
Page 16 of 25