Original source · versioned page text
9327 L 01 To 05 Op Works Issue B
LEGEND
PROPOSED TREE:
Refer to Planting Plan and Schedule
S EXTENT OF WORKS GROUNDCOVERS & FEATURE
PLANTS:
Refer to Planting Plan and Schedule
CE CE
CE PLANTING AREA:
Refer to Landscape Specification
S S S S S S
S S
TURFED AREA:
Refer to Landscape Specification
WHYBA ROAD
GRAVEL MULCH: LD CONCRETE PAVERS: LD
Refer to Detail 09 Refer to Detail 08
PAVING TYPE 1:
Concrete Finish
PAVING TYPE 1: LD MASS PLANTING: LD Refer to Landscape Specification
Refer to Detail 07 Refer to Detail 02
PLANTING EDGING:
CE Flush Concrete to street frontage only
BIORETENTION BASIN: ADVANCED TREE: LD Refer to Landscape Specification
Refer to Civil for Refer to Detail 01
construction details. EXTENT OF WORKS BOUNDARY:
Final landscape finish 100 Refer to Landscape Plans
depth sugar cane mulch LD MASS PLANTING:
Jute net pinned 02 Refer to Detail
TRELLIS PLANTING: LD
Refer to Detail 06 CE
MASS PLANTING: LD
Refer to Detail 02 LD ADVANCED TREE:
EXTENT OF WORKS
EXTENT OF WORKS
01 Refer to Detail
CE
BIORETENTION BASIN:
Refer to Civil for
construction details.
Final landscape finish 100
depth sugar cane mulch
Jute net pinned
CE
LD CONCRETE EDGE:
05 Refer to Detail
J:\9327 Mary Street, Noosaville (TLPC Pty Ltd)\Working Files\AutoCAD\L - Landscape\9327 L 02 LAYOUT PLAN.dwg
CE
MASS PLANTING: LD MASS PLANTING: LD MASS PLANTING: LD
Refer to Detail 02 Refer to Detail 02 Refer to Detail 02
ADVANCED TREE: LD TURFED AREA: LD
LD CONCRETE EDGE: Refer to Detail 01 Refer to Detail 03
05 Refer to Detail
CE
EXTENT OF WORKS
MARY STREET
DISCLAIMER: DESIGNS DOCUMENTED ON THIS DRAWING
ARE THE PROPERTY OF SAUNDERS HAVILL GROUP PTY
AMENDMENTS:
ISSUE DATE DESCRIPTION CHECKED
CLIENT: WESSEL PETROLEUM PROJECT: 52-54 MARY STREET, DRAWING:
LANDSCAPE saunders
LTD AND ARE NOT AUTHORISED FOR REPRODUCTION OR A 23.06.2020 OP WORKS REVIEW ISSUE NF PTY LTD NOOSAVILLE LAYOUT PLAN
USE IN WHOLE OR PART WITHOUT WRITTEN
PERMISSION. THESE PLANS HAVE BEEN PREPARED FOR
ISO 9001
QUALITY
ISO 14001
ENVIRONMENT
AS 4801
OHS
B 30/06/2020 OP WORKS ISSUE NF
havill
THE EXCLUSIVE USE OF THE CLIENT. SAUNDERS HAVILL
GROUP DO NOT ACCEPT RESPONSIBILITY FOR ANY USE
OF OR RELIANCE UPON THE CONTENTS OF THESE
Management System
SOUTHPAC
certifications
Management System
SOUTHPAC
certifications
Management System
SOUTHPAC
certifications
DRAWN: FW CHECKED: NF
group
DRAWINGS BY ANY THIRD PARTY. CONFIRM ALL SCALE: 0 1 2 5m LANDSCAPE ARCHITECTURE
1:100@A1
9327 L 02 B
DIMENSIONS ON SITE AND CLARIFY ANY DISCREPANCIES 9 THOMPSON STREET, BOWEN HILLS QLD 4006
PRIOR TO CONSTRUCTION. 1:200@A3 DRAWING #: PHONE 1300 123 SHG WWW.SAUNDERSHAVILL.COM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.