Original source · versioned page text
Development Application IDAS Forms 1 & 6 for Permit to Damage Vegetation - OPW12/0562
ODD
3. Confirm the following mandatory supporting information accompanies this application
Confirmation
Method of lodgement
of lodgement
All applications for operational works
site plans drawn to scale which show the following:
. the location and site area of the land to which the application relates
(relevant land)
. the north point
. the boundaries of the relevant land
. the allotment layout showing existing lots, any proposed lots (including
the dimensions of those lots), existing or proposed road reserves, I:8J confirmed
building envelopes and existing or proposed open space (note:
numbering is required for all lots)
.
any existing or proposed easements on the relevant land and their
function
.
any access limitation strips
. all existing and proposed roads and access points on the relevant land
a statement about how the proposed development addresses the local
government’s planning schemes and any other planning documents oconfirmed
relevant to the application
Applications for operational works involving earthworks (filling and excavating)
drawings showing:
.
existing and proposed contours
.areas to be cut and filled
. the location and level of any permanent survey marks or reference
stations used as datum for the works oconfirmed
. the location of any proposed retaining walls on the relevant land and
their height
. the defined flood level (if applicable)
. the defined fill level (if applicable)
Applications for operational works involving roadworks
drawings showing:
.
existing and proposed contours
. the centreline or construction line showing chainages, bearings, offsets
if the construction line is not the centreline of the road and all
intersection points
. information for each curve including tangent point chainages and
offsets, curve radii, arc length, tangent length, superelevation (if
applicable) and curve widening (if applicable)
.kerb lines including kerb radii (where not parallel to centreline) and
tangent point changes (where not parallel to centreline)
.
edge of pavement where kerb is not constructed oconfirmed
.
position and extent of channelisation
.location and details of all traffic signs, guideposts, guardrail and other
street furniture
.
pavement markings including details on raised pavement markers
.
catchpit, manhole and pipeline locations
.
drainage details (if applicable)
.cross road drainage culverts (if applicable)
. concrete footpaths and cycle paths
. location and details for access points, ramps and invert crossings
.
changes in surfacing material
Building and operational work assessable against a planning scheme -
IDAS form 6
Version 1.0 18 December 2009
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.