FURTHER REPORT - Planning & Environment Committee 6 May 2025 MCU21/0110
h. Details of water quality treatment device plantings with a minimum of five plant species
and a plant density of 8 plants per square meter;
i. Details of all fencing and gates (including but not limited to height, construction type,
materials);
j. Details of tree protection methods provided by a qualified person* to be engaged to
protect trees identified within the conditions of this approval in particular vegetation
located within the mapped Koala Habitat Area to the north of the development site.
k. Native trees of a minimum pot size of 100L to replace existing trees to be removed
from the site, at the rate of 1 replacement tree for every tree removed that has a
diameter greater than 200mm measured at 1.2 metres from ground surface level.
l. Vegetated screening of any electrical transformers, bin storage areas and the like from
the road frontage.
m. Vegetation offsets in accordance with the recommendations Gondwana Ecology letter
dated 9 February 2023.
66. All landscape works must be established and maintained in accordance with the approved
design for the life of the development, and in a manner that ensures healthy, sustained and
vigorous plant growth. All plant material must be allowed to grow to full form and be
refurbished when its life expectancy is reached.
67. Control of all weeds species listed in the following standards and legislation:
a. Declared plants under the Land Protection (Biodiversity Act 2014 and subordinate
Regulation 2016).
b. Noosa Local Government Area Pest Management Plan 2015-2019.
c. Undesirable Species as listed in Planning Scheme Policy 3 Landscaping Plants and
Guidelines.
68. All entry statements, fences, retaining walls and buffer/screen plantings must be
located entirely within private land and not within the public road reserve.
Treatment of Temporarily Vacant Land
69. Where some or all of the land remains vacant or undeveloped for more than 3 months, or
buildings are demolished and redevelopment is delayed for more than 3 months, the
following works must to be carried out:
a. the site must be cleared of all rubble, debris and demolition materials
b. the site must be graded to prevent ponding (to the same level as the adjoining footpath
wherever practicable), turfed and mown at a minimum 3 weekly intervals
c. the site must be landscaped with perimeter planting consisting of advanced specimens
of fast growing tree species
d. the site must be maintained to ensure no nuisance to adjacent premises, roads or
footpaths
e. where fencing is installed to secure boundaries:
i. the fencing must be durable and not capable of being pushed or blown over
ii. the fencing type must not detract from local amenity (barbed wire is not
acceptable)
iii. vandalism must be promptly repaired and any graffiti removed.
Page 8 of 10
Document Set ID: 22632986
Version: 7, Version Date: 07/11/2023
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewSearchable page text hides email addresses. Original files are unchanged and may show email addresses.