FURTHER REPORT - Planning & Environment Committee 6 May 2025 MCU21/0110
PLANNING AND ENVIRONMENT COMMITTEE MEETING REPORT 6 MAY 2025
61. All easements must be designed in accordance with the planning scheme and granted
at no cost to the Grantee. Where the Grantee is Council or a service authority, the
easement documentation must be in accordance with the Grantee’s standard
easement terms. Draft easement documentation must be submitted to Council for
endorsement.
62. All works must be kept clear of any existing or proposed easements on the subject
land, unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
63. All excavation, fill, soil retaining structures and associated batters must be undertaken
in accordance with an Operational Works approval and contained entirely within the
subject site unless written permission from the respective landowner(s) is provided to
Council.
64. All retaining walls must be designed and constructed in accordance with the planning
scheme and must be certified by an RPEQ where exceeding 1.0m in height. All
retaining walls that are publicly accessible and exceed 1.0m in height must be fitted
with a commercial grade safety fence.
Damage to Services and Assets
65. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and
assets must first be referred to the relevant service authority for approval.
LANDSCAPING
Landscaping Works
66. The development site must be landscaped in accordance with a Council endorsed
landscape package prepared by a qualified person*. The works must be undertaken in
accordance with an Operational Works approval and the Noosa Plan for that specific
area and must include in particular:
a. the works shown on the Approved Landscape Concept Design Package Plans, with
the inclusion of the requirements of the approved Bushfire Hazard Assessment and
Mitigation Plan version 8, prepared by Rob Friend and Associates dated
25.02.2025.
b. Plant Pallet including hard and soft plant percentages, plant numbers, planting
locations, pot sizes and whether Noosa Native, Australian Native or Exotic;
c. a Landscape Management Plan including (but not limited to):
i. landscape design principles for bushfire hazard areas in Part 5 of Bushfire
Resilient Building Guidance for Queensland Homes (QRA 2020);
ii. Certification from a qualified* person ensuring the Landscape Management
Plan complies with the design principles in the Part 5 of Bushfire Resilient
Building Guidance for Queensland Homes (QRA 2020) and the Bushfire
Management Plan.
iii. Management of branches overhanging building envelopes.
Page 8 of 12
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewSearchable page text hides email addresses. Original files are unchanged and may show email addresses.