Original source · versioned page text
FURTHER REPORT - Planning & Environment Committee 6 May 2025 MCU21/0110
PLANNING AND ENVIRONMENT COMMITTEE MEETING REPORT 6 MAY 2025
82. A copy of the Bushfire Hazard Assessment Report & Mitigation Plan and evacuation
procedure listed within this Decision Notice must be provided to the nearest fire
authority. *(Refer to Advisory Note)
WASTE DISPOSAL
83. Prior to the issue of any Operational Works approvals for this development an
Operational Waste Management Plan must be submitted to Council. The Waste
Management Plan must be in accordance with the Waste management Code and
Planning Scheme Policy 9 - Waste Management.
84. The developer must provide waste storage and disposal facilities in accordance with
Planning Scheme Policy 9 - Waste Management. The facilities must include an
impervious area, within the site, correctly sized for all refuse and recycling containers
and suitably screened from public places and neighbouring properties. A bin wash area
is required with a cold-water tap, hose and drain outlet connected to sewer, via a bucket
trap. The drain outlet must be designed to prevent storm water entry to the sewerage
system.
85. Refuse containers must be provided in accordance with the requirements of the
Environmental Protection (Interim Waste) Regulation 1996 and (Waste Management)
Regulation 2000, for the storage and collection of refuse.
86. Storage, disposal and management of solid, liquid and vegetative waste is conducted
in a safe and ecologically sustainable manner without environmental nuisance. In this
regard, vegetated waste must be disposed of via a green waste bin or at a local transfer
station.
B. Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
Page 12 of 12
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewSearchable page text hides email addresses. Original files are unchanged and may show email addresses.