Original source · versioned page text
FURTHER REPORT - Planning & Environment Committee 6 May 2025 MCU21/0110
ATTACHMENT 8 - MCU21/0110 - POOL SIZE COMPARISON LEGEND 1 NEW HOTEL 2 POOL 3 NEW HOTEL ENTRY ROOF 4 TENNIS COURT WITH EXISTING ON-GRADE CAR PARK BELOW 5 TENNIS PAVILION 6 AMENITIES 7 LINKS DRIVE 8 RESORT DRIVE 9 EXISTING COUNTRY CLUB 10 EXISTING DAY SPA & GYMNASIUM 11 EXISTING POOL 12 FIRE PIT 13 NEW 2 LEVEL CARPARK WITH EXISTING LOWER CAR PARK BELOW 14 EXISTING MID CAR PARK 15 EXISTING UPPER CAR PARK 16 EXISTING PORTE-COCHERE 1 17 EXISTING PORTE-COCHERE ROOF DA3.03 18 PEDESTRIAN ACCESS TO PORTE COCHERE HATCH ZONE INDICATES MSES FROM MID CAR PARK 1 ENVIRONMENTAL VALUES 19 NEW PORTE COCHERE ROOF DA3.01 GREEN DASH INDICATES 20 EXISTING PORTE COCHERE ROOF EXTENSION DA4.03 AREA OF BIODIVERSITY 21 SERVICE ACCESS TO POOL PLANT + WATER TANKS SIGNIFICANCE 22 PLATEAU 23 SERVICE ROAD WAY EXTENSION 1 24 EXISTING SERVICE LANEWAY 2 25 EXISTING LOADING BAY 33 DA3.03 26 EXISTING SITE ACCESS 27 EXISTING MANHOLE AT PORTE-COCHERE LEVEL 8 28 EXISTING BUGGY PARKING 8305 29 EXISTING BUS PARKING 0 753 30 EXISTING BRIDGE CONNECTION 31 POOL PLANT BELOW DA4.02 2 32 TENNIS COURT SHADE STRUCTURE 19 X CARPARKS 34 WITH SEATING BELOW 33 CONTROLLED GATE TO OVERFLOW CARPARKING 2.5 OU CONTOUR 34 REINFORCED TURF OVERFLOW CARPARKING / MULTI- 40 PURPOSE SPACE. 40 35 PEDESTRIAL ACCESS TO CLUBHOUSE 36 JACUZZI 37 68,000 LITRE WATER TANK BELOW 1 38 SOLAR PANEL CARPORT ROOFS 37 40 2.5 OU CONTOUR 1 SITE BOUNDARY 1 EXISTING EASEMENT 2 DA3.03 2 EXISTING SEWER LINE 6 23 MSES ENVIRONMENTAL VALUES 2 AREA OF BIODIVERSITY SIGNIFICANCE 1 1 DA3.03 2 1 1 DA3.02 DA3.02 SERVICE ROAD TO BE A 22 34 MINIMUM 3.5m WIDE DA4.03 2 1 2 19 x CARPARKS 12 36 sq m 1,157 sq m (INCLUDES 4xPWD) 33 2 0 12 350 2 DA3.02 1 3 2 37 DA2.04 DA2.04 156 35 31 21 11 SERVICE ROAD TO BE A 32 MINIMUM 3.5m WIDE DA2.03 6 DA4.02 1 10 4 4 1 28 24 15 5 3 20 30 6 35 3 4 19 27 4 4 2 14 32 DA4.02 DA4.02 DA3.02 18 26 3 2 25 DA2.04 DA2.04 17 26 7 DA2.03 16 9 1 1 29 DA3.01 3 DA2.03 DA2.03 4 38 13 38 2 PORTE COCHERE TO BE RENOVATED TO ENSURE 4.3M HEIGHT CLEARANCE FOR DA2.03 VEHICLE ACCESS IMPORTANT NOTES: REVISION DATE DESCRIPTION BY CLIENT DRAWING TITLE 1 04/09/20 FOR INFORMATION ST Do not scale from drawings. All dimensions to be checked on site before commencement of work. All discrepancies to 2 3 22/09/20 25/09/20 FOR INFORMATION DA APPROVAL ST ST NOOSA SPRINGS REAL ESTATE PTY SITE PLAN be brought to the attention of the Architect. Larger scale drawings and written dimensions take preference. This 4 drawing is copyright and the property of the author, and must 5 09/10/20 14/10/20 DA APPROVAL REVISED DA APPROVAL REVISED ST ST LTD not be retained, copied or used without the express authority 6 04/11/20 COUNCIL PRESENTATION ST Marchese Partners International Pty Ltd of MARCHESE PARTNERS INTERNATIONAL PTY. LTD. 7 01/12/20 DA APPROVAL REVISED ST Level 14, 46 Edward Street. Brisbane, QLD 4000. Australia 8 19/10/21 CARPARK DESIGN ST P +61 7 3211 2600 F +61 7 3211 0297 E [email protected] PROJECT SCALE DATE DRAWN CHECKED 9 12/11/21 RFI ST www.marchesepartners.com 1 : 500 @A1 10 04/03/22 DA REVISED DESIGN ST NOOSA SPRINGS BOUTIQUE HOTEL 09/02/23 AB BY FOR APPROVAL 11 12 13 13/04/22 21/04/22 09/02/23 REVISED DESIGN UPDATED DA DRAW INGS UPDATED DA DRAW INGS BY BY LC Sydney · Brisbane· Melbourne · Adelaide Kuala Lumpur · Auckland · Christchurch · London · Madrid JOB DRAWING REVISION ABN 33 590 578 323 0 5 10 20 NOT FOR CONSTRUCTION 20079 DA1.00 13 Document Set ID: 23610053 Version: 1, Version Date: 03/03/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.