Original source · versioned page text
SUPERSEDED - Amended Decision Notice - MCU22 0194 [As Published]
2211-32243 SRA Attachment 1—Referral agency conditions (Under section 56(1)(b)(i) of the Planning Act 2016 the following conditions must be attached to any development approval relating to this application) (Copies of the plans and specifications referenced below are found at Attachment 5) No. Conditions Condition timing Material change of use 10.9.4.2.4.1—The chief executive administering the Planning Act 2016 nominates the Director-General of the Department of Transport and Main Roads to be the enforcement authority for the development Document Set ID: 22544890 Version: 1, Version Date: 16/08/2023 to which this development approval relates for the administration and enforcement of any matter relating to the following conditions: 1. a) The road access location is to be located generally in a) Atall times. accordance with Site Plan, prepared by AUSMAR Homes, dated 26 October 2022, sheet 0.001, revision C as amended in red by |b) and c) SARA on 11 January 2023. Prior to the commencement of use b) Road access works comprising a vehicle crossing - residential driveway must be provided at the road access location. c) The road access works must be designed and constructed in accordance with: i. Institute of Public Works Engineering Australasia (IPWEA), Standard Drawings RS-049 & RS-050 - Vehicle Crossing Residential Driveway. ii. | Department of Transport and Main Roads' Road Planning and Design Manual, 2nd Edition; and iii. Department of Transport and Main Roads’ Guideline: Treatment options to improve safety of pedestrians, bicycle riders and other path users at driveway. and to be maintained at all times. A path user sight triangle area must be provided clear of walls, fences, structures (including advertising devices) and any vegetation and landscaping must remain below 0.5m in height to ensure driver visibility is unobstructed as shown on the Site Plan, prepared by AUSMAR Homes, dated 26 October 2022, sheet 0.001, revision C., @s amended in red by SARA on 11 January 2023. Prior to the commencement of the use and to be maintained at all times. a) Stormwater management of the development must ensure no worsening or actionable nuisance to the state-controlled road. b) Any works on the land must not: i. create any new discharge points for stormwater runoff onto the state-controlled road. ii. interfere with and/or cause damage to the existing stormwater drainage on the state-controlled road. ii. | surcharge any existing culvert or drain on the state- controlled road. iv. reduce the quality of stormwater discharge onto the state-controlled road. a) and b) At all times. State Assessment and Referral Agency Page 3 of 7 Page 25 of 33
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.