Council archive · source document
Amended Proposal Plans-compressed · 51992.517.01
Plans and drawings: the text below has words only, no drawings.
Tom Mardling Proposed Additions to Unit 2, 17 Ferris St, Sunshine Beach NOTE: UNIT 1 IS SHOWN FOR CONTEXTUAL PURPOSES ONLY AND NO WORKS CURRENTLY PROPOSED TO UNIT 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 6 pages
Page 2
R.P.D
48° 27' 30" LOT 2 ON BUP 12790 + OBUP 12790
) PREVIOUSLY LOT 250 ON RP 168110
13m
( 16.1 3.216m PARISH OF WEYBA
' 00"
31° 40 COUNTY OF MARCH
133° 09' 00"
9.453m
NOOSA REGIONAL COUNCIL
9.62 m
SUNSHINE BEACH LOCALITY
SITE AREA 730m²
EXISTING EXISTING GROSS FLOOR AREA 233.74m²
DENSE EXISTING SITE COVER 191.8m² (26.3%)
PLANTING
PROPOSED GROSS FLOOR AREA 256.3m²
PROPOSED SITE COVER 245m² (33.5%)
PROPOSED PLOT RATIO 0.35:1
LINE OF EXTERNAL WALLS
(SHOWN DASHED)
PHASE LEGEND
LOT 2 Existing
OUTDOOR AREA
LINE OF DIVIDING WALL
(SHOWN DASHED)
BUP 12790 Demolished
PROPOSED
New Construction
EXISTING
RESIDENCE
( 36.607m )
( 39.466m )
34.422m
31.611m
PROPOSED
OUTDOOR AREA
133º 51'
4.0m
313° 00' 00"
133° 00' 00"
LINE OF EXTERNAL WALLS
(SHOWN DASHED)
LOT 2
LINE OF DIVIDING WALL
(SHOWN DASHED)
BUP 12790
EXISTING EXISTING
DENSE GARAGE
PLANTING 42° 54' 00"
3.325m
FUTURE
GATEHOUSE
7.855m
7250 OMP nom.
132° 54' 00"
NEW ROOF OVER EXISTING
EXISTING PARKING DRIVEWAY
2.185m
DENSE
nbn
PLANTING mh
wm
w w 223° 00' 00" 19.0m s
nbn nbn nbn nbn nbn nbn nbn nbn nbn
N
s s s s s s s s mh s
w
SITE PLAN LEGEND
e Electrical
w nbn NBN Cable Trench
s Sewer Main
Site Plan w Water
1 1 : 200
FERRIS STREET O'H Overhang
OMP Outermost Projection
NOTE: UNIT 1 IS SHOWN FOR CONTEXTUAL PURPOSES ONLY
AND NO WORKS CURRENTLY PROPOSED TO UNIT 1
8/10/2023 9:50:51 PM
For engineering information, Engineer's drawings and information shall take precedence over architectural drawings. U n i t 2, 17 F e r r i s S t r e e t , Date: Rev: Issue: Scale: Title: Date:
Client Project
Amendments
The Building Designer's drawings and recommendations shall take precedence over architectural drawings. The
02.05.2023 A Sketch Design - Carport, Storage, Roofs 1 : 200 Site Plan 06.10.2023
Job Details
author is to be notified immediately, should any errors, discrepancies, or conflict become apparent and prior to Sunshine Beach
Copyright
04.08.2023 B Development Details for Lodgement
proceeding with the works.
Copyright: The design content shown on this drawing remains the property of Garland Design and is provided only 10.08.2023 C Development Details for Lodgement
for the use described. This drawing may not be copied, altered, have sections omitted, erased or changed in any Des: JC Project #: Drawing #: Issue:
way without the prior written approval of Garland Design. Thomas Mardling Check:JC 23.107 SD.01 C
Page 3
PHASE LEGEND
Existing
Demolished
New Construction
LEGEND.
Mark Description
BT Bathtub
BW Reinforced Concrete Blockwork
EXP Exposed Aggregate Concrete
FD Floor Drain
2000 min OMP 4200 HWU Hot Water Unit
4010 190 3600 9190 P1 120x120 Dressed Hardwood Post to Engineer's spec.
SHR Shower
TS Toilet Suite
SD.06 VB Vanity Basin
2
1500 min OMP
1500 min
RAISED
GARDEN BED EXISTING
DENSE PLANTING
190
ROOF LINE OVER
1480
(SHOWN DASHED)
2680
EXP
NEW EXPOSED CONCRETE SLAB
TO BEST MATCH EXISTING
NEW ROOF (OVER)
ROOF LINE OVER
1200
LLS
CONCEAL CARPORT FROM STREET
A (SHOWN DASHED)
GW
NIN
ENCOURAGE VINE GROWTH UP WALL
I 2136GSSD 1218LV
RETAINING REQUIRED WITH SURVEY
A
CONCRETE BLOCK RETAINING WALL
ET
GR
DENSE NATIVE PLANTING TO
TIN
CONFIRM EXTENT & HEIGHT OF
5950
5600
5640
S
EX I
NEW ROOF OVER NEW ROOF (OVER)
EXISTING PARKING
300 x 100 BEAM OVER
1000 x 250 B'H OVER
RL 59.0m nom.
EXISTING EXPOSED CONCRETE SLAB
EXISTING RETAINING WALL
EXISTING RETAINING WALLS
LIVING / DINING KITCHEN
2133GSSD
5245
190
120
P1 ROOF LINE OVER (SHOWN DASHED) P1
FUTURE
SD.05 1 GATEHOUSE SD.05 2 1 SD.06
LAUNDRY WC TS
AG DRAIN ALONG GARAGE WALL
HWU
DIVIDING WALL TO UNIT 1 PLUMBING DUCT
(SHOWN GREY DASH)
ROOF LINE OVER
RL 57.50m nom.
EXISTING DRIVEWAY EXISTING GARAGE NOTE: UNIT 1 IS SHOWN FOR CONTEXTUAL PURPOSES ONLY AND NO WORKS CURRENTLY PROPOSED TO UNIT 1
3
DIVIDING WALL TO UNIT 1 GARAGE
SD.05
NOTE: UNIT 1 IS SHOWN FOR CONTEXTUAL PURPOSES ONLY AND NO WORKS CURRENTLY PROPOSED TO UNIT 1
N
Ground Floor Plan
1 1 : 100
0 1 2 3 4 5m
8/10/2023 9:50:52 PM
For engineering information, Engineer's drawings and information shall take precedence over architectural drawings. U n i t 2, 17 F e r r i s S t r e e t , Date: Rev: Issue: Scale: Title: Date:
Client Project
Amendments
The Building Designer's drawings and recommendations shall take precedence over architectural drawings. The
02.05.2023 A Sketch Design - Carport, Storage, Roofs 1 : 100 G r o u n d F l o o r P l a n 06.10.2023
Job Details
author is to be notified immediately, should any errors, discrepancies, or conflict become apparent and prior to Sunshine Beach
Copyright
04.08.2023 B Development Details for Lodgement
proceeding with the works.
Copyright: The design content shown on this drawing remains the property of Garland Design and is provided only 10.08.2023 C Development Details for Lodgement
for the use described. This drawing may not be copied, altered, have sections omitted, erased or changed in any 06.10.2023 D Removal of Carport Storage Area Des: JC Project #: Drawing #: Issue:
way without the prior written approval of Garland Design. Thomas Mardling Check:JC 23.107 SD.02 D
Page 4
Carport Perspective NOTE: UNIT 1 IS SHOWN FOR CONTEXTUAL PURPOSES ONLY AND NO WORKS CURRENTLY PROPOSED TO UNIT 1
Outdoor Lounge Area
1 2
Outdoor Dining Area
3
8/10/2023 9:50:54 PM
For engineering information, Engineer's drawings and information shall take precedence over architectural drawings. U n i t 2, 17 F e r r i s S t r e e t , Date: Rev: Issue: Scale: Title: Date:
Client Project
Amendments
The Building Designer's drawings and recommendations shall take precedence over architectural drawings. The
02.05.2023 A Sketch Design - Carport, Storage, Roofs 3D Perspectives 06.10.2023
Job Details
author is to be notified immediately, should any errors, discrepancies, or conflict become apparent and prior to Sunshine Beach
Copyright
04.08.2023 B Development Details for Lodgement
proceeding with the works.
Copyright: The design content shown on this drawing remains the property of Garland Design and is provided only 10.08.2023 C Development Details for Lodgement
for the use described. This drawing may not be copied, altered, have sections omitted, erased or changed in any 06.10.2023 D Removal of Carport Storage Area Des: JC Project #: Drawing #: Issue:
way without the prior written approval of Garland Design. Thomas Mardling Check:JC 23.107 SD.03 D
Page 5
NOTE: UNIT 1 IS SHOWN FOR CONTEXTUAL PURPOSES ONLY AND NO WORKS CURRENTLY PROPOSED TO UNIT 1
8/10/2023 9:50:55 PM
For engineering information, Engineer's drawings and information shall take precedence over architectural drawings. U n i t 2, 17 F e r r i s S t r e e t , Date: Rev: Issue: Scale: Title: Date:
Client Project
Amendments
The Building Designer's drawings and recommendations shall take precedence over architectural drawings. The
02.05.2023 A Sketch Design - Carport, Storage, Roofs Visualisations 06.10.2023
Job Details
author is to be notified immediately, should any errors, discrepancies, or conflict become apparent and prior to Sunshine Beach
Copyright
04.08.2023 B Development Details for Lodgement
proceeding with the works.
Copyright: The design content shown on this drawing remains the property of Garland Design and is provided only 10.08.2023 C Development Details for Lodgement
for the use described. This drawing may not be copied, altered, have sections omitted, erased or changed in any Des: JC Project #: Drawing #: Issue:
way without the prior written approval of Garland Design. Thomas Mardling Check:JC 23.107 SD.04 C
Page 6
PHASE LEGEND
Existing
Demolished
New Construction
LEGEND.
Mark Description
BT Bathtub
BW Reinforced Concrete Blockwork
EXISTING RESIDENCE NOTE: UNIT 1 IS SHOWN FOR CONTEXTUAL PURPOSES
EXISTING RESIDENCE NOTE: UNIT 1 IS SHOWN FOR CONTEXTUAL PURPOSES EXP Exposed Aggregate Concrete
ONLY AND NO WORKS CURRENTLY PROPOSED TO UNIT 1 ONLY AND NO WORKS CURRENTLY PROPOSED TO UNIT 1
FD Floor Drain
(BEHIND)
HWU Hot Water Unit
P1 120x120 Dressed Hardwood Post to Engineer's spec.
SHR Shower
TS Toilet Suite
VB Vanity Basin
61590
300
Level 1
NOTE: UNIT 1 IS SHOWN FOR
PROPOSED ROOF OVER FUTURE EXISTING GARAGE CONTEXTUAL PURPOSES ONLY AND
EXISTING PARKING GATEHOUSE NO WORKS CURRENTLY PROPOSED PROPOSED OUTDOOR AREAS
2590
2400
TO UNIT 1
59000
2900
BW P1
BW Ground Level
1800
1500
EXP 57500
Garage Level
SE Elevation - Street Elevation SE Elevation
1 1 : 100
2 1 : 100
EXISTING RESIDENCE
(BEHIND)
EXISTING GARAGE OUTDOOR AREAS
(BEHIND) (BEHIND)
NOTE: UNIT 1 IS SHOWN FOR CONTEXTUAL PURPOSES ONLY AND NO WORKS CURRENTLY PROPOSED TO UNIT 1 NOTE: UNIT 1 IS SHOWN FOR CONTEXTUAL PURPOSES ONLY AND NO WORKS CURRENTLY PROPOSED TO UNIT 1
61590
Level 1
PROPOSED ROOF OVER FUTURE
EXISTING PARKING GATEHOUSE
2590
300
59000
2900
2600
P1 BW P1 Ground Level
1500
57500
Garage Level
NE Elevation
3 1 : 100
8/10/2023 9:50:56 PM
For engineering information, Engineer's drawings and information shall take precedence over architectural drawings. U n i t 2, 17 F e r r i s S t r e e t , Date: Rev: Issue: Scale: Title: Date:
Client Project
Amendments
The Building Designer's drawings and recommendations shall take precedence over architectural drawings. The
06.10.2023 D Removal of Carport Storage Area 1 : 100 Elevations 06.10.2023
Job Details
author is to be notified immediately, should any errors, discrepancies, or conflict become apparent and prior to Sunshine Beach
Copyright
proceeding with the works.
Copyright: The design content shown on this drawing remains the property of Garland Design and is provided only
for the use described. This drawing may not be copied, altered, have sections omitted, erased or changed in any Des: JC Project #: Drawing #: Issue:
way without the prior written approval of Garland Design. Thomas Mardling Check:JC 23.107 SD.05 D
Page 7
PHASE LEGEND
Existing
Demolished
New Construction
LEGEND.
Mark Description
BT Bathtub
BW Reinforced Concrete Blockwork
NOTE: UNIT 1 IS SHOWN FOR CONTEXTUAL PURPOSES
EXISTING RESIDENCE EXP Exposed Aggregate Concrete
ONLY AND NO WORKS CURRENTLY PROPOSED TO UNIT 1 FD Floor Drain
HWU Hot Water Unit
P1 120x120 Dressed Hardwood Post to Engineer's spec.
SHR Shower
TS Toilet Suite
VB Vanity Basin
61590
300
Level 1
OUTDOOR AREAS
2590
2400
59000
Ground Level
NW Elevation
1 1 : 100
EXISTING RESIDENCE
61590
300
Level 1
PROPOSED OUTDOOR AREAS
2590
2400
59000
Ground Level
SW Elevation
2 1 : 100
8/10/2023 9:50:57 PM
For engineering information, Engineer's drawings and information shall take precedence over architectural drawings. U n i t 2, 17 F e r r i s S t r e e t , Date: Rev: Issue: Scale: Title: Date:
Client Project
Amendments
The Building Designer's drawings and recommendations shall take precedence over architectural drawings. The
06.10.2023 D Removal of Carport Storage Area 1 : 100 Elevations 06.10.2023
Job Details
author is to be notified immediately, should any errors, discrepancies, or conflict become apparent and prior to Sunshine Beach
Copyright
proceeding with the works.
Copyright: The design content shown on this drawing remains the property of Garland Design and is provided only
for the use described. This drawing may not be copied, altered, have sections omitted, erased or changed in any Des: JC Project #: Drawing #: Issue:
way without the prior written approval of Garland Design. Thomas Mardling Check:JC 23.107 SD.06 D
Used in these records
Amended Proposal Plans-compressed.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.