Original source · versioned page text
geotech
PROPOSED UNIT DEVELOPMENT
9 BOTTLEBRUSH AVENUE, NOOSA HEADS
TABLES
Table 1: Summary of Subsurface Profiles ........................................................................................................................... 5
Table 2: Stability Risk Levels .............................................................................................................................................. 7
Table 3: Details of Qualitative Risk Assessment for Property (AGS 2007) ......................................................................... 8
Table 4: Retaining Structure Design Parameters .............................................................................................................. 13
TEXT FIGURES
Text Figure 1: Layout plan (LHS) and cross-sectional view (RHS) of proposed development, courtesy of Zest ................. 1
Text Figure 2: 2021 aerial image of the site and immediate surrounds (courtesy Nearmap imagery)................................. 2
Text Figure 3: Panoramic view of the Bottlebrush Avenue frontage, looking north ............................................................. 3
Text Figure 4: View of the north-western side of the residence (LHS) and dilapidated fence to rear (RHS) ....................... 3
Text Figure 5: Horizontal/vertical separation in concrete pavement and kerb (LHS) and view of neighbouring unit
building to the west (RHS).................................................................................................................................. 3
Text Figure 6: Site plan showing ground surface contours (courtesy Noosa Council ‘Intramaps’) ...................................... 4
Text Figure 7: Extract of Gympie Special 1:100,000 Geology Map ..................................................................................... 4
Text Figure 8: Extract from NSC landslide hazard overlay mapping ................................................................................... 6
Text Figure 9: Slope/W output for long term conditions...................................................................................................... 9
Text Figure 10: Footing depth required to prevent undermining....................................................................................... 12
FIGURES
Figure 1: Site Plan
APPENDICES
APPENDIX A
Borehole & DCP Reports & Explanatory Notes
APPENDIX B
AGS Guidelines - Qualitative Terminology for Use in Assessing Risk to Property
Some Guidelines for Hillside Construction
APPENDIX C
Limitations
13 July 2021
Report No. 21169-001-Rev0 iv
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.