Council archive · source document
Decision Notice - 010.2004.00005102.001 [As Published] · 132004.5102
NOOSA COUNCIL IDAS Development Application Decision Notice 4 of 9
In the event that the Development Permit for Material Change of Use of Premises lapses or is cancelled,
the paid contributions and/or the trading bank guarantee will be returned.
General
9. Any alteration of any public utility or other facilities necessitated by the development of the land or
associated construction works external to the site shall be at no cost to Council.
Environmental Health
10. The developer must provide waste storage and disposal facilities in accordance with Planning Scheme
Policy No 9 “Waste Management Multi-Dwellings and Commercial and Industrial Premises”, including an
external imperviously paved area correctly sized for all refuse and recycling containers and suitably
screened from public places and neighbouring properties. A roofed waste/bin wash area or another
suitable design and fitted with a cold-water tap, hose and drain outlet connected to sewer, via a bucket
trap and grease arrestor is required.
11. A Waste Management Plan (Operational) in accordance with Planning Scheme Policy No. 9 “Waste
Management Multi-Dwellings and Commercial and Industrial Premises”, must be submitted for the day-to-
day operation of the development and approved by Council’s Health Section prior to issue of development
permit for operational works.
It is critical that waste areas are properly planned. A copy of Planning Scheme Policy No. 9 explaining
exactly how to predict waste quantities and design waste areas is available from Council and the web.
The Plan shall include the following information: -
The types of waste that will be generated from the activities approved within the development.
Estimated volumes or tonnage of both recyclables and waste generated.
Methods to be used for dealing with garden waste.
Initiatives to minimize waste either by waste prevention, reduction, re-use or recycling.
Description of procedures for getting all waste to the bins; the storage of bins and the collection of
bins by the contractor.
A description of the design details of waste storage and recycling areas including size, location,
elevation and floor plan, methods of bin washing and system to prevent storm water getting into
sewer via the bin wash.
A description of types and volume of waste storage containers to be used.
The waste and recycling storage area shall include the provision of containers for all waste and
recycling materials including putresable matter, non-recycling waste, paper/ cardboard, glass,
aluminum/steel cans, waste oil, styrofoam boxes, etc, and bin washing facilities connected to
sewer.
A detailed description of vehicular access to collect waste. Where collection is off street, access
must allow vehicles to enter and leave the site in a forward direction.
12. Noise emission from mechanical equipment (air conditioners, refrigeration equipment etc) shall comply
with the following requirements:
The equipment shall be installed and located in a manner that prevents excessive noise in accordance
with Council’s Local Law No. 12 - Control of Nuisances. Infringement Notices (on-the-spot fines) may
apply for offences.
A person must not use equipment on any day if it makes or causes noise to be made –
From 10pm to 7am: More than the lower of either –
40 dB(A)
3 dB(A) above the background noise level
From 7am to 7pm: More than the lower of either –
50 dB(A)
5 dB(A) above the background noise level
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@8403727e\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2004.00005102.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 42 KB (small file)
- File type
No other editions are linked here.