                             Attachment 3 to Item 2
                             General Committee Meeting Agenda
                             14 January 2019




Monitoring of the Noosa River Oyster Reefs;
     November 2017 - November 2018


   Report to Noosa Council, and Queensland
    Department of Agriculture and Fisheries



                    Dr Ben Gilby
              Prof Thomas Schlacher,
                  Dr Andrew Olds,
               Mr Nicholas Ortodossi,
                Mr Ashley Rummell,
             Dr Christopher Henderson,
                 Mr Thomas Brook,
              Miss Cassandra Duncan,
               Ms Felicity Hardcastle.




                December 2018
Log in to download the original file

2019-01-14 General Committee Agenda - Attachment 3 to Item 2 - Monitoring of Noosa River Oyster Reefs Nov 2018(PDF, 9MB).pdf · 9.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 30 sections

Section 2

Table of Contents

Executive summary                                                                      3

Introduction and context                                                               4

Noosa River oyster reef restoration monitoring schedule                                9

Monitoring criteria 1- Oyster restoration unit location stability                      12

Monitoring criteria 2- Natural recruitment processes                                   21

Monitoring criteria 3- Community use and enjoyment of the declared fish habitat area   25

Monitoring criteria 4- Other potential effects                                         28

Conclusions                                                                            29

References                                                                             29

Appendices                                                                             30




                                                                                            2

Section 3

Executive summary
  1) Background & Rationale
     The principle objective of the Noosa Oyster Reef Restoration Project is to restore
     ecologically-functioning oyster reefs to the Noosa River Estuary. Reef units were
     installed in November 2017 to begin the restoration. An annual monitoring is part of
     the approval (OPW17/0016) that needs to report on: a) reef unit stability; b) oyster
     spat recruitment processes; c) lack of negative community usage; and d) impact on
     marine plants and shoreline erosion. This report addresses these requirements,
     reporting on the findings of two mandated monitoring events (May 2018, Nov. 2018)
     done by USC. The methods used were precisely those prescribed in the approved
     monitoring schedule, with no modifications.

  2) Stability and Position
     The reef units can be considered stable. The mean recorded change in position over
     12 months was 0.16 m (+/- 0.12 m SD). All oyster reef restoration units moved less
     than 0.65 m over one year. No reef unit moved from the designated resource
     allocation areas at any site. No reef unit was physically displaced from its anchor
     points in the sediment or removed otherwise.

  3) Recruitment
     Substantial spat fall and oyster growth was found in both monitoring events. In May
     2018, an average spat fall of 387.5 oysters/m2 (+/- 537.7 oysters/m2 SD) was
     recorded, and in November 2018 it was 306.1 oysters/m2 (+/- 575.1 oysters/m2 SD).
     There was a significant increase in the size of newly recruited oysters on the reefs.
     Here oysters increased in size from 14.3 mm (+/- 6.5 mm SD) in May 2018, to 19.1
     mm (+/- 8.9 mm SD) in November 2018. The favourable spat fall and oyster growth
     are an encouraging bellwether for the reefs to develop into biologically stable
     systems over the coming years.

  4) Interaction with Public
     There were signs of damage to a few reef units most likely caused by boat propellers
     and anchors, evident during the November 2018 monitoring event. We repaired
     these units where possible. Limited data suggest that the use of the oyster reefs by
     recreational fishers possibly appears to have increased over time. We suggest that
     closer monitoring of this aspect may be useful in coming years.

  5) Marine Plants & Shoreline Erosion
     Whilst there was some change to the edges of seagrass beds, there were no
     significant changes to the distribution, cover, or species composition of existing
     seagrass beds or mangroves forests within 50 m of each reefs. We found no
     shoreline erosion in the vicinity of the reef units. At two sites in Lake Weyba and
     Weyba Creek dugong grass Halophila ovalis was found near reef sites where it was
     not recorded at the time of reef placement.

  6) Conclusions
     Overall, the results of the 2018 monitoring of the Noosa oyster reefs are encouraging
     and positive. Two of the targets have been fully met (reef unit stability, no impact on
     plants and shorelines). The target of oyster and other invertebrate growth is tracking
     very favourably. The observation of reef unit damage from anchoring needs
     consideration of closer monitoring and possibly targeted education / information may
     be considered for this issue. The next scheduled monitoring event is mandated for
     May 2019.




                                                                                             3

Section 4

Introduction and context
Oyster reef restoration in the Noosa River;
The principal objective of the Noosa River Oyster Reef Restoration project is to restore
natural oyster reef habitat in the Noosa Estuary. This requires the addition of suitable hard
substrate for oyster spat to settle, and allowing natural recruitment and reef-formation
processes to recover to areas that historically supported oyster reefs.

The oyster settlement substrate comprises oyster reef restoration units. These units are
made from the most suitable recruitment material - oyster shells held together by a natural
coir fiber bag. The units are raised above the muddy and sandy marine substrates, thereby
mimicking the vertical relief of the original oyster reefs to facilitate natural recruitment
processes (Figure 1, 2). We expected that natural recruitment processes would cement the
dead shell together and form part of the mosaic of habitats within the estuary including both
soft and hard structural habitat types, thereby creating a structurally diverse mosaic of
habitats that is predicted to be beneficial to a range of fish species, including species of
harvested in commercial and recreational fisheries (e.g. yellowfin bream, estuary cod, tailor,
mangrove jack, and moses perch).

The restoration sites that were chosen as locations for oyster reef restoration in the Noosa
River (Figure 3) because they:
   1) are in reaches of the lower Noosa River estuary and in Weyba Creek from which
        oysters were harvested historically;
   2) are within the depth range known to be suitable for oyster reefs to grow;
   3) are in locations where viable oyster larvae were recorded during recent recruitment
        studies; and
   4) have an extent where the final restored area will not exceed the historical areal
        extent of oyster reefs before commercial harvesting took place.




Figure 1 Coir mesh bag filled with recycled oyster shells; the principle restoration unit




                                                                                                4

Section 5

Figure 2 Approved coastal engineering drawing of the oyster reef restoration units installed in the Noosa River



                                                                                                                  5

Section 6

Figure 3 Map of oyster restoration sites and marine habitats in the Noosa River



                                                                                  6

2                                                                                       '                         ~
  RE Sa                                                                                                          mo.
 Ne    oh         PRT                                                                                              4
 De See dae ees     eas
 thee ithe                                                                                                                     —
fhe    os                                                                                                          ;              ci   ~
 ete                                                                                                    (cen                      mic
Nc hae                                                                                                     7                 Pe ae
SSE re! he              P                                                                                                 Pe    |   €   ]
   a                    7                                                                                                gh    de hg
  wel       Shaw!       >                                                                                          _     ot    ~   +)       ~
     eed               :                                                                                     OM alte                      ey
WER eres om            :                                                                  ¥              MEN      EE                 Pe
  ee        birt                                                                         -               fi  Sri AS              9 owe
   sana is Ray           ‘                                                              ;                co   = a TR        Pn egos aT
      af eee              ©                                   1                                    ag     SBF              4      se   ATED
                se  S                                          oo                               oe             ss         sie        ‘ah pe?
                   N                                          Wists                        oN      i    Sh      a               of ot Ls     Y
                                                                                                                                   hb
                                                                                      ety aa  4 7 AH ane e [a4 a 1              ry re 4 ’   -\
                      Ros                                                       Ses         ioe          et fF                  Pie
                      i Ne Syl arenes                                          oe eee                 do A         é            or        at
                      i be aATann ee                 a              -        tins wid Pea              * ae?     vt          Pod Pe a ‘3
                              ie      Tipo   =     a SEGRE ray at Dc |              eee)                                       ae      PS
                                    |                             s a    a     i  "a                      al                   x
                            re         eee og           SS ig      CE PE      ace hs                                         pF  SR     ae
                           Saf “be       > Tes ‘o       ee lon BT   A, aes “ihe, FS                                     Rex:    Re    Pom
ie                         ay                   ee      eee eh              RR                                          eS am
 ae                           a          ‘    :     =    ones      ne     ie ted    -                                      VP OVa™     Pae
  "                             a              oe eae    ht a               S/R  ee ee                                  be Fae ee:
   4                           a        fa Ae         ie           th.  ie     ys      x                                y PM  F inet Peer ae
oe                         ,         ee    od     bg     yaihiee shear agg  ato, ee ee   ay                               Poy SBT Ee Dol ae
    eh. P                  he   ar             eee oS      aaa      Mey hile,       —— r a.                               read Fey ons     A
 eS                          oP  Pe        ae          a           ms         ted   -   rus, A a  Mair. id                  Cees      apes
te ”                         A   IS a    ‘Pe      ay  Pty   a a be ied    A a       4   =         ht  a                   Pe    Ss Soe
 a                            SN Lt ed                        ep,                  Sn      i    BY J                    ,      FP ReaD Pe
eins                             PO    gE otal oY               Ni            Pe           ee    ad                   PAB  ay A pee on       fy
a                    SS yt                    ae                 PR ea    Sas eee               io                     a ae ic ellie 2
aca       oe:     oi       Fr. ARM Tie            ee a    en              ee        F                           Bee Rt    ee              ca
  Pe     wre      ye       re    So     Se               A$           es       ye. hv       ee                pe   Ary   ae     a          >
   CY)             oe    de     ee  Fae                 Pe xT         sD) a     ome Ss                           oe
  =                       ee:         a                     a een Titel          Bey                      a        Se
                :     y ae                        TS           26   RESTS                 2                     a
     |                        ~ —   ~                   ~       rs  San! yy Me .   :    ad                     Pl “~ +   d
   J                          ¥                      pets           he  ae                              ers      eer
                j            ad    i139             iid        Ae) ce     a                          Dt aerernd                        wy
                       Eee a]           “   C                   as ret  id                          eg       a                    :
                ;     ea ee TY fey    -                                                   r          a                             a’
                    p    *”;  ro  ry    ~                                                            Poe  dl      oe              i
                ‘      Ea                 ye                                              :           =   |
                 a                "                                                        ,         ¢
              -     =    SE   ta   ie                                                     barn        er oe  :%   J       =
                    Pooky ° hae     By                                                    :              re    + Sem
                     eS      |     e                                                                        ge       hk )       b
            ,       te    if       >                                                                             nord
                 ae        _                                                                 *                  wer                  » Me
             eX. F      m                                                                      wr                       4    .
                ;  se                                                                           ’                       Ne
                  #3:  a                                                                                                    3
           at      a
          at  ed     »
                   oo Te                                                           ~

                                                                   0          0.5          1          1.5          2km
      “U S(                         @ Oyster Reefs | pag “yo                                              ——5
                                    @® Seagrass
                                    @™ Mangroves

Figure 3 Map of oyster restoration sites and marine habitats in the Noosa River

Section 7

Oyster reef unit installations
The installation of oyster reef units to the Noosa River was done during a period of three
days, from 20 to 22 November 2017 (Figure 4). All works and surveys were conducted by a
team comprising professionals of Noosa Jetty Builders, and marine scientists from the
University of the Sunshine Coast. All oyster reef units and signs were installed exactly
according to specifications set out in the permit conditions and any instructions provided
regarding procedures (Table 1). All reef units are located to avoid any damage to marine
plants or surrounding ecosystem (Table 1, Figure 4). Key observations during the placement
of the reef units and associated signage include the following:
    • No marine plants were disturbed during the installation of the reef units or signs.
        Before each reef unit was placed on the seafloor, we carefully examined the site to
        ascertain that no seagrass, mangrove aerial roots, or any other marine vegetation
        was present. This ensured that no direct placement impacts occurred at any of the
        sites (Table 1).
    • All operations were localised to the immediate site where reef units were sunk onto
        the seabed. Thus, no habitat outside the RAA area was impacted in any form by the
        reef units or the signage.
    • Poles holding the signs were installed using a narrow water jet ‘spear’. Use of this
        gear ensured that only a very narrow (< 20 cm diameter in all cases) area of the
        seabed was disturbed (Figure 4). Sign posts were then driven further into the
        substrate, to a mean depth of 2.7 m (min 1.8 m, max 3.5 m; Table 1), using a post
        driver (Figure 4).
    • According to engineering specifications, we used marine grade hardwood stakes
        (sourced from the Australian Hardwood Stake Company) to secure the reef units on
        the seafloor. The stakes were hammered into the seabed to a mean depth of 0.9 m
        (min 0.5 m, max 1.2 m) - depending on hardness of the seabed (Table 1), at a mean
        angle of 82.4º (min 75 º, max 90 º).
    • Pre- and post-installation photographs and videos of all sites are available
        electronically (OneDrive folder). Full access to the all electronically stored imagery
        has been provided to Noosa Council. In addition, we are happy to grant access to
        whoever may require it (please email: [email protected]).




Figure 4 The resulting very small footprint of sign posts following installation by the water jet
(left) and a completed oyster reef in Weyba Creek (right).




                                                                                                7

Section 8

Table 1. Completed oyster-reef installations in the Noosa River, listing their exact position, the date of placement, characteristics of posts and
stakes driven into the seabed to secure signage and reef units, and any presence and/or damage to marine vegetation.

 Site                       Position                Installation     Depth to               Stakes to secure reef units   Presence of, or damage
 Number          Latitude         Longitude         date             which sign       Depth of       Angle of stake       to, marine plants and/or
                                                                     post is driven   stake into     relative to          adjacent habitats or
                                                                     into the         seabed         seabed (degrees)     ecosystems.
                                                                     seabed (m)       (m)
 1            reef units not installed - seabed not compact enough
 2            -26.38333096 153.045835                  20/11/17      2.8              1.2            79                   None
 3            -26.38673804 153.043291                  20/11/17      2.8              1.2            75                   None
 4            -26.39367197 153.044599                  20/11/17      2.9              1.1            84                   None
 5            -26.394757        153.049933             20/11/17      2.4              0.5            82                   None
 6            -26.39245399 153.051636                  20/11/17      3.2              1.2            85                   None
 7            -26.39351204 153.054941                  20/11/17      3.3              1.2            77                   None
 8            -26.39491903 153.061679                  20/11/17      2.4              1.2            90                   None
 9            -26.38954598 153.070696                  21/11/17      1.8              0.5            86                   None
 10           -26.38452999 153.071546                  21/11/17      2.0              0.6            87                   None
 11           -26.39817104 153.080595                  21/11/17      2.3              0.5            76                   None
 12           -26.40045603 153.077035                  21/11/17      2.9              0.5            79                   None
 13           -26.41099703 153.071263                  22/11/17      3.5              1.2            87                   None
 14           -26.41184301 153.0712                    22/11/17      3.2              0.5            83                   None
 15           reef units not installed – presence of seagrass
 16           -26.43981904 153.062079                  22/11/17      2.9              0.6            84                   None




                                                                                                                                                     8

Section 9

Noosa River oyster reef restoration monitoring schedule
As part of the development approval for installing the oyster reefs, the stakeholders report
yearly (in December) to Queensland Department of Agriculture and Fisheries on the
progress of the oyster restoration project, especially relating to;
   1. Oyster restoration unit stability (i.e. oyster reef restoration units remain within the
        allocated resource allocation areas);
   2. Restoration of natural recruitment processes over long term (i.e. spat recruitment
        rates demonstrate that the biogenic matrix will be sufficient to hold the structure of
        the oyster reef restoration units in place following complete degradation of the
        supporting coir material during the establishment phase and to facilitate ongoing
        natural recruitment processes);
   3. Equitable Community Impacts (i.e. ensuring fair community use of the river system is
        not impacted by placement of the Oyster Reef Restoration Units within the Resource
        Allocation Areas - to be monitored using a council operated community feedback
        system); and
   4. No negative impact on marine plants or shoreline erosion (i.e. ensuring the oyster
        restoration units do not impede natural marine plant growth or accelerate coastal
        erosion processes).
These performance objectives are quantified using established monitoring protocols for
oyster reef restoration, and follow international best practice for monitoring restored oyster
habitats (Baggett et al. 2014). The monitoring program is designed to be adaptive, with
annual reviews against the performance objectives for the project (See Table 2 for detailed
monitoring requirements).

Two monitoring events occurred in 2018; one 6 months post installation in May 2018, and
the other 12 months post installation in November 2018. The results of these monitoring
events are covered in this report. There have also been detailed surveys of the fish and
crustacean assemblages associating with the reefs throughout 2018. Although the details of
these surveys are not covered in this report, they are available from USC upon request.




                                                                                             9

Section 10

      Table 2 Noosa oyster reef restoration monitoring schedule as agreed to by all stakeholders
      in RAA 2016CA0575, and including mark-ups from Department of Agriculture and Fisheries
      dated 6 January 2017.
Performance objective             Monitoring method                    Frequency              Corrective action where
                                                                                              performance objective is not met
1. Oyster Restoration Unit location stability
Oyster restoration units       Visually inspect the stability of       Every 6 months         A professional coastal engineer
remain within the designated   oyster reef units and record the        for a minimum of       shall be consulted to suggest
Resource Allocation Areas.     precise GPS position (± cm              three years            remedial action for any oyster reef
                               scale), and size of each unit           Additional             restoration units that collapse, or
                               (following international best           monitoring will be     shift by > 1 m.
                               practice: Baggett et al. 2015).         conducted within
                               Use GIS software to contrast            2 weeks of             Any oyster reef restoration units that
                               the position, footprint, size and       substantial rainfall   move outside the designated
                               area of oyster reef restoration         events (i.e. events    Resource Allocation Areas within 3
                               units between monitoring                that exceed 50-        years will be removed. A
                               events and assess any potential         year Average           professional ecologist will confirm
                               movement.                               Rainfall Intervals).   the cause of the shift.

2. Natural Recruitment Processes
Oysters and other sessile        Quantify the recruitment of           Every 6 months         We will contrast: 1) the rate of
benthic invertebrates recruit    oysters and other sessile             for a minimum of       oyster recruitment; 2) the cover of
to reef restoration units to     benthic invertebrates to reef         three years,           oysters and all other sessile benthic
establish a biogenic matrix,     restoration units, and measure        unless otherwise       invertebrates; and 3) the stability of
which binds oyster shells in     changes in the cover of oysters       detailed within        the biogenic matrix among oyster
place, prior to degradation of   and other sessile benthic             corrective actions     reef restoration units and between
coir material.                   invertebrates over time                                      monitoring events.
                                 (following international best
                                                                 1
The Key Performance              practice: Baggett et al. 2015).                              Any restoration units that fail to
Indicators for this are:                                                                      meet the Key Performance
1.) Oyster recruitment:          The monitoring methods for                                   Indicators within 3 years will be
successful recruitment of        each Indicators are:                                         removed.
oyster spat in at least 1 out of 1.) Oyster recruitment: marked
the 3 years (i.e. 33% of the     oyster shells will be fastened to                            If major damage occurs to the coir
time) post deployment            the outside of restoration units.                            mesh of any oyster reef restoration
(following international best    These shells will be harvested                               units before a stable biogenic matrix
practice of 40%: Baggett et al. at regular intervals (15 oyster                               has formed, and loose oyster shells
        1
2015). ;                         shells per location on each                                  are being lost from the structure, it
                                 event – i.e. 5 shells per unit)                              will be repaired in-situ by hand
2.) Cover of oysters and         and the density and size of                                  weaving. Any such repairs will be
other sessile benthic            recruits recorded;                                           conducted carefully, and by hand, to
invertebrates: an upward                                                                      ensure that there is no damage to
trend in the cover of sessile    2.) Cover of oysters and other                               established areas of biogenic
benthic invertebrates growing    sessile benthic invertebrates:                               matrix.
on restoration units; and        photographs of ten quadrats (25
                                 cm x 25cm), distributed in a
3.) Establishment of stable      stratified random design, across
biogenic matrix: structural      each oyster reef restoration unit
rigidity of oyster restoration   will be taken at regular intervals
units, denoting a stable         to quantify the change in cover
biogenic matrix after 3 years    of oysters and other sessile
post deployment, which is        benthic invertebrates (Baggett
                                              1
sufficient to hold oyster shells et al. 2015) .
in place.
                                 3.) Establishment of stable
                                 biogenic matrix: assess the
                                 structural integrity of each
                                 oyster reef restoration unit and
                                 monitor the degradation of coir
                                 material. Structural integrity will
                                 be quantified by measuring the
                                 proportion of oyster shells (from
                                 10 shells that are selected at
                                 random at each location), which
                                 can be removed easily by hand
                                 manipulation. The rate of coir
                                 degradation will be measured


                                                                                                                           10

Section 11

                                by monitoring changes to the
                                condition of coir mesh over time
                                from the ten photo-quadrats,
                                which are collected twice per
                                year to assess changes in the
                                cover of benthic invertebrates at
                                each oyster reef restoration
                                unit.
3. Community use and enjoyment of the declared Fish Habitat Area
Oyster restoration units do     Maintain records of community     Annual reporting         Complaints: within 3 months of
not significantly impair        feedback, evidence of             of all complaints,       receiving each complaint, an
community use and               vandalism, and vessel strikes     cases of willful         investigation (including interview
enjoyment of the declared       on the trial oyster reef          vandalism, and           with the complainant if possible) will
Fish Habitat Area, particularly restoration units. Records will   instances of             be conducted to determine whether
fishing activities.             be comprehensive and include,     vessel strike            complaints are directly related to
                                as a minimum set:                 received for the         oyster reef restoration units.
                                1) the number and type of         three-year trial         Potential response actions will be
                                complaints received (also, to     period.                  provided to the Department of
                                allow the Department to gauge                              Agriculture and Fisheries in the
                                the success, any positive                                  annual report. If complaints persist,
                                comments should also be                                    and grievances exceed the direct
                                provided);                                                 benefit of oyster reef restoration, the
                                2) the type, nature, and severity                          particular oyster reef restoration unit
                                of any acts of willful                                     will be removed as soon as
                                vandalism; and                                             practical, and prior to the 4th
                                3) the type and severity of any                            anniversary post deployment.
                                vessel strike.
                                                                                           Willful vandalism and vessel
                                                                                           Strikes
                                                                                           If there are consistent and / or
                                                                                           significant cases of willful vandalism
                                                                                           to, or instances of vessels striking,
                                                                                           the oyster reef restoration units, the
                                                                                           cause of the impact will be identified
                                                                                           and used to guide the delivery of a
                                                                                           community education campaign
                                                                                           aimed at reducing these types of
                                                                                           incidents. If the education campaign
                                                                                           does not reduce cases of willful
                                                                                           vandalism and / or instances of
                                                                                           vessel strike, the oyster reef
                                                                                           restoration units that are
                                                                                           responsible will be removed prior to
                                                                                           the 4th anniversary post
                                                                                           deployment.
4. Other potential effects:
Oyster reef restoration       Map the area of marine plant           Annually for a        Where monitoring shows that there
units do not cause a          habitats (seagrass, mangroves) in      minimum of three      are substantial, and consistent,
decline in the extent of      the immediate vicinity (i.e. with a    years, or until any   losses of marine plants, or erosion
marine plants within a 50     50 m buffer) of each oyster            failed restoration    of estuarine shorelines, in the
m radius of the restoration   restoration area, using high-          units have been       immediate vicinity of oyster reef
units, and are not            resolution GPS (cm scale) and          removed.              restoration units, and these
attributed to erosion of      field-validated aerial imagery                               changes can unambiguously be
adjacent shorelines or        (sourced from Nearmap). Monitor                              attributed to oyster reef restoration
other ambient                 changes in the composition                                   activities, the problem units that are
environmental impacts.        coverage and condition of                                    responsible for such impacts shall
                              seagrass within 50 m radius                                  be removed (as soon as practical
                              around the oyster reefs. Map the                             and prior to the following annual
                              location and condition of estuarine                          reporting anniversary).
                              shorelines that occur in the
                              immediate vicinity (i.e. with a 50 m
                              buffer) of each oyster reef, using
                              high-resolution GPS (cm scale)
                              and field-validated aerial imagery
                              (sourced from Nearmap).




                                                                                                                        11

Section 12

Monitoring criteria 1- Oyster restoration unit location stability
Performance objective
Oyster restoration units remain within the designated Resource Allocation Areas.

Monitoring method and frequency
Visually inspect the stability of oyster reef units and record the precise GPS position (± cm
scale), and size of each unit (following international best practice: Baggett et al. 2015). Use
GIS software to contrast the position, footprint, size and area of oyster reef restoration units
between monitoring events and assess any potential movement.

Frequency: Every 6 months for a minimum of three years. Additional monitoring will be
conducted within 2 weeks of substantial rainfall events (i.e. events that exceed 50-year
Average Rainfall Intervals).

Was the performance objective met?
No units moved outside of the RAA area, and all repairable reefs were repaired. Therefore,
all aspects of this performance objective were met, and no further action is necessary.

Supporting Evidence
No oyster restoration units moved beyond the RAA areas, and no units moved more than 1
m during either monitoring event (Table 3). Maps of each of the sites (Figures 5 to 18) are
provided below to support this lack of movement of bags. High-resolution maps and csv files
of the locations of the reefs at all three survey points (following installation, and at 6 and 12
month monitoring events) are available from USC upon request.




                                                                                              12

Section 13

Table 3 List of reef site sites and reef units, their positions as given by the coastal surveyor,
and the distance these units had moved from the initial installations (as recorded by the
coastal surveyor) to the 6 and 12 month monitoring events. Distances measured are from
the center points of oyster restoration units.
                                Easting       Northing        Distance moved     Distance moved 12
 Site           Surveyor ID     (GDA94)       (GDA94)         6 months (m)       months (m)
            2             2.1    504557.693    7081870.54                 0.01                 0.12
                          2.2    504562.401   7081871.525                 0.09                 0.04
                          2.3    504561.797   7081866.981                 0.11                 0.06
            3             3.1    504297.232   7081482.809                 0.05                 0.17
                          3.2    504300.191   7081487.149                 0.21                 0.08
                          3.3    504302.058   7081482.224                 0.30                 0.03
            4             4.1    504447.682   7080720.227                 0.39                 0.09
                          4.2    504451.864    7080722.81                 0.33                 0.28
                          4.3    504452.517   7080718.084                 0.13                 0.17
            5             5.1    504977.921   7080596.146                 0.20                 0.02
                          5.2    504980.268   7080598.985                 0.08                 0.11
                          5.3     504983.03   7080596.309                 0.28                 0.37
            6             6.1    505140.806   7080848.337                 0.19                 0.09
                          6.2    505147.768   7080846.296                 0.20                 0.42
                          6.3     505142.59   7080842.496                 0.20                 0.14
            7             7.1    505475.222   7080728.716                 0.02                 0.21
                          7.2    505481.921   7080724.223                 0.06                 0.07
                          7.3    505476.882   7080722.755                 0.20                 0.20
            8             8.1    506148.168   7080578.329                 0.44                 0.11
                          8.2    506151.843   7080583.145                 0.12                 0.16
                          8.3    506154.632   7080579.701                 0.57                 0.65
            9             9.1      507047.3   7081174.147                 0.24                 0.22
                          9.2    507052.487   7081172.727                 0.46                 0.12
                          9.3     507048.33    7081169.39                 0.03                 0.15
           10           10.1     507131.275   7081731.424                 0.10                 0.21
                        10.2     507136.871   7081731.471                 0.18                 0.11
                        10.3     507135.843   7081726.658                 0.27                 0.10
           11           11.1     508035.278   7080213.498                 0.03                 0.17
                        11.2     508040.293   7080216.237                 0.15                 0.14
                        11.3     508038.955   7080212.182                 0.23                 0.07
           12           12.1      507678.59   7079963.401                 0.17                 0.07
                        12.2     507684.058    7079964.39                 0.18                 0.11
                        12.3     507683.416    7079959.64                 0.06                 0.10
           13           13.1     507103.328   7078792.463                 0.20                 0.12
                          3.2    507107.243   7078796.008                 0.16                 0.08
                        13.3     507107.661   7078790.417                 0.06                 0.15
           14           14.1     507090.833   7078704.893                 0.18                 0.25
                        14.2     507094.457   7078706.761                 0.20                 0.39
                        14.3     507094.824   7078701.819                 0.12                 0.13
           16           16.1     506199.719   7075595.579                 0.21                 0.07
                        16.2     506204.963   7075595.325                 0.18                 0.04
                        16.3     506200.595   7075590.153                 0.16                 0.19
                                              Mean                        0.18                 0.16
                                              StDev                       0.12                 0.12




                                                                                               13

Table 3 List of reef site sites and reef units, their positions as given by the coastal surveyor,
and the distance these units had moved from the initial installations (as recorded by the
coastal surveyor) to the 6 and 12 month monitoring events. Distances measured are from
the center points of oyster restoration units.
                                Easting        Northing       Distance moved _ Distance moved 12
Site            Surveyor ID — (GDA94)          (GDA94)        6 months (m)       months (m)
             2            2.1    504557.693     7081870.54                0.01                  0.12
                          2.2    504562.401    7081871.525                0.09                  0.04
                          2.3    504561.797    7081866.981                0.11                  0.06
             3            3.1    504297.232    7081482.809                0.05                  0.17
                          3.2    504300.191    7081487.149                0.21                  0.08
                          3.3    504302.058    7081482.224                0.30                  0.03
             4            4.1    504447.682    7080720.227                0.39                  0.09
                          4.2    504451.864     7080722.81                0.33                  0.28
                          4.3    504452.517    7080718.084                0.13                  0.17
             5            5.1    504977.921    7080596.146                0.20                  0.02
                          5.2    504980.268    7080598.985                0.08                  0.11
                          5.3     504983.03    7080596.309                0.28                  0.37
             6            6.1    505140.806    7080848.337                0.19                  0.09
                          6.2    505147.768    7080846.296                0.20                  0.42
                          6.3     505142.59    7080842.496                0.20                  0.14
             7            7.1    505475.222    7080728.716                0.02                  0.21
                          7.2    505481.921    7080724.223                0.06                  0.07
                          7.3    505476.882    7080722.755                0.20                  0.20
             8            8.1    506148.168    7080578.329                0.44                  0.11
                          8.2    506151.843    7080583.145                0.12                  0.16
                          8.3    506154.632    7080579.701                0.57                  0.65
             9            9.1      507047.3    7081174.147                0.24                  0.22
                          9.2    507052.487    7081172.727                0.46                  0.12
                          9.3     507048.33     7081169.39                0.03                  0.15
            10           10.1    507131.275    7081731.424                0.10                  0.21
                         10.2    507136.871    7081731.471                0.18                  0.11
                         10.3    507135.843    7081726.658                0.27                  0.10
            11           11.1    508035.278    7080213.498                0.03                  0.17
                         11.2    508040.293    7080216.237                0.15                  0.14
                         11.3    508038.955    7080212.182                0.23                  0.07
            12           12.1     507678.59    7079963.401                0.17                  0.07
                         12.2.   507684.058     7079964.39                0.18                  0.11
                         12.3    507683.416     7079959.64                0.06                  0.10
            13           13.1    507103.328    7078792.463                0.20                  0.12
                          3.2.   507107.243    7078796.008                0.16                  0.08
                         13.3    507107.661    7078790.417                0.06                  0.15
            14           14.1    507090.833    7078704.893                0.18                  0.25
                         14.2    507094.457    7078706.761                0.20                  0.39
                         14.3    507094.824    7078701.819                0.12                  0.13
            16           16.1    506199.719    7075595.579                0.21                  0.07
                         16.2    506204.963    7075595.325                0.18                  0.04
                         16.3    506200.595    7075590.153                0.16                  0.19
                                               Mean                       0.18                  0.16
                                               StDev                      0.12                  0.12

                                                                                               13

Section 14

Figure 5 Map of (A) mangrove edges and (B) oyster reef unit positions (at installation, and
at 6 and 12 months post installation) at site 2 in the Noosa River.




Figure 6 Map of (A) aerial extents of seagrass and mangrove edges and (B) oyster reef unit
positions (at installation, and at 6 and 12 months post installation) at site 3 in the Noosa
River.




                                                                                          14

Section 15

Figure 7 Map of (A) mangrove edges and (B) oyster reef unit positions (at installation, and
at 6 and 12 months post installation) at site 4 in the Noosa River.




Figure 8 Map of (A) aerial extents of seagrass and mangrove edges and (B) oyster reef unit
positions (at installation, and at 6 and 12 months post installation) at site 5 in the Noosa
River.



                                                                                          15

Section 16

Figure 9 Map of (A) aerial extents of seagrass and mangrove edges and (B) oyster reef unit
positions (at installation, and at 6 and 12 months post installation) at site 6 in the Noosa
River.




Figure 10 Map of (A) aerial extents of seagrass and mangrove edges and (B) oyster reef
unit positions (at installation, and at 6 and 12 months post installation) at site 7 in the Noosa
River.

                                                                                               16

Section 17

Figure 11 Map of (A) mangrove edges and (B) oyster reef unit positions (at installation, and
at 6 and 12 months post installation) at site 8 in the Noosa River.




Figure 12 Map of (A) mangrove edges and (B) oyster reef unit positions (at installation, and
at 6 and 12 months post installation) at site 9 in the Noosa River.



                                                                                          17

Section 18

Figure 13 Map of (A) mangrove edges and (B) oyster reef unit positions (at installation, and
at 6 and 12 months post installation) at site 10 in the Noosa River.




Figure 14 Map of (A) mangrove edges and (B) oyster reef unit positions (at installation, and
at 6 and 12 months post installation) at site 11 in the Noosa River.



                                                                                          18

Section 19

Figure 15 Map of (A) aerial extents of seagrass and mangrove edges and (B) oyster reef
unit positions (at installation, and at 6 and 12 months post installation) at site 12 in the
Noosa River.




Figure 16 Map of (A) aerial extents of seagrass and mangrove edges and (B) oyster reef
unit positions (at installation, and at 6 and 12 months post installation) at site 13 in the
Noosa River.

                                                                                               19

Section 20

Figure 17 Map of (A) aerial extents of seagrass and mangrove edges and (B) oyster reef
unit positions (at installation, and at 6 and 12 months post installation) at site 14 in the
Noosa River.




Figure 18 Map of (A) vegetation monitoring area (note there was no seagrass or mangroves
at this site) and (B) oyster reef unit positions (at installation, and at 6 and 12 months post
installation) at site 16 in the Noosa River.


                                                                                               20

Section 21

Monitoring criteria 2- Natural recruitment processes
Performance objective: Oysters and other sessile benthic invertebrates recruit to reef
restoration units to establish a biogenic matrix, which binds oyster shells in place, prior to
degradation of coir material. The Key Performance Indicators for this are:
    1. Oyster recruitment: successful recruitment of oyster spat in at least 1 out of the 3
        years (i.e. 33% of the time) post deployment (following international best practice of
        40%: Baggett et al. 2015);
    2. Cover of oysters and other sessile benthic invertebrates: an upward trend in the
        cover of sessile benthic invertebrates growing on restoration units; and
    3. Establishment of stable biogenic matrix: structural rigidity of oyster restoration
        units, denoting a stable biogenic matrix after 3 years post deployment, which is
        sufficient to hold oyster shells in place.

Monitoring method: Quantify the recruitment of oysters and other sessile benthic
invertebrates to reef restoration units, and measure changes in the cover of oysters and
other sessile benthic invertebrates over time (following international best practice)(Baggett et
al., 2015). The monitoring methods for each Indicators are:
     1. Oyster recruitment: marked oyster shells will be fastened to the outside of
        restoration units. These shells will be harvested at regular intervals (15 oyster shells
        per location on each event – i.e. 5 shells per unit) and the density and size of recruits
        recorded;
     2. Cover of oysters and other sessile benthic invertebrates: photographs of ten
        quadrats (25 cm x 25cm), distributed in a stratified random design, across each
        oyster reef restoration unit will be taken at regular intervals to quantify the change in
        cover of oysters and other sessile benthic invertebrates (Baggett et al., 2015).
     3. Establishment of stable biogenic matrix: assess the structural integrity of each
        oyster reef restoration unit and monitor the degradation of coir material. Structural
        integrity will be quantified by measuring the proportion of oyster shells (from 10 shells
        that are selected at random at each location), which can be removed easily by hand
        manipulation. The rate of coir degradation will be measured by monitoring changes to
        the condition of coir mesh over time from the ten photo-quadrats, which are collected
        twice per year to assess changes in the cover of benthic invertebrates at each oyster
        reef restoration unit.

Frequency: Every 6 months for a minimum of three years, unless otherwise detailed within
corrective actions

Was the performance objective met?
We identified significant oyster spat settlement and growth at all oyster reefs. Whilst this has
not yet proliferated to cover of oysters on the outside of the restoration units, or to fully
cementing shells within the units together, these positive spat fall and growth results indicate
that these performance criteria are likely to be met in the coming years. Therefore, no further
action is necessary at this early stage of the project.

Supporting evidence
Oyster recruitment
We collected shells from two sources;
     1. 5 shells collected from within the coir bags at each oyster restoration unit (henceforth
         ‘bags’), and
     2. 5 shells collected from ‘oyster necklaces’ which were strings of drilled oyster shells
         tied together with fishing line and then affixed to the top of the oyster restoration units
         during installation (henceforth ‘necklaces’).
All live oysters growing on the shells were identified to species, counted, and their height
measured, and the density of oysters calculated as number of oysters per square meter of
shell (as recommended by Baggett et al., 2015).



                                                                                                 21

Section 22

We identified significant oyster settlement during both monitoring events on both necklaces
and in the oyster restoration unit bags (Figure 19, Figure S1, Table 4, Table 5). Overall, we
identified an average of 387.5 spat/m2 in May 2018, 306.1 oysters/m2 in November 2018,
and 349.9 oysters/m2 across both monitoring events (Table 4). Whilst we identified some
changes in the densities of oysters at specific restoration sites (Figure S1, Table 5), with
some sites showing increased oyster density between sampling events, and others lower
oyster density, the overall pattern was for a reduction in oyster density between monitoring
events 1 and 2 (Table 4). This change was, however, offset by a significant change in the
size-frequency distribution of oyster shells on the reefs (Figure 20, Figure S2). Here oysters
increased in size from 14.3 mm (+/- 6.5 mm SD) in May 2018, to 19.1 mm (+/- 8.9 mm SD)
in November 2018. Consequently, it is likely that intermediate sized oysters (6-15 mm in
length) in May 2018 grew to the larger sizes (i.e. <30 mm) by November 2018, and that the
smaller oysters (<6mm) either grew to an intermediate size, or did not survive the winter.
Consequently, despite a reduction in overall average density, this was offset by a larger
average oyster size during the second monitoring event.




Figure 19 Example images of juvenile oysters growing on shells collected from within the
oyster reef restoration units.

Table 4 List of oyster quantification methods, and the average densities (with standard
deviations) of oysters during both monitoring events, and for all monitoring events in 2018.
                Monitoring event 1           Monitoring event 2           Overall (both events)
                           2                            2                              2
            Average (spat/m )   StDev    Average (spat/m )   StDev     Average (spat/m )    StDev
Necklaces                543.7   643.5                493.9   513.4                  525.8   599.3
Bags                    272.9    413.3                230.9   438.2                 251.9   425.9
All                     385.7    537.7                306.1   475.1                 349.9   511.7




                                                                                               22

Section 23

Table 5 Summary of average oyster density (with standard deviation) across all oyster
restoration sites. Note that all sites recorded significant spat settlement. Necklaces were
unrecoverable from three sites in November 2018 sue to anchor damage.
                  May 2018                                                                                        Nov 2018
                  Bags                                          Necklace                                          Bags                                          Necklace
                             2                                             2                                                 2                                               2
 Site             Avg (spat/m )               StDev             Avg (spat/m )                   StDev             Avg (spat/m )           StDev                 Avg (spat/m )    StDev
 2                114.7                       153.4             159.9                           413.5             135.7                   153.3                 212.5            316.4
 3                131.5                       132.8             217.9                           219.4             37.9                    82.4                  320.2            364.6
 4                49.6                        75.1              229.0                           274.9             72.4                    92.7                  317.6            305.0
 5                544.8                       307.4             1399.2                          961.6             473.1                   315.7                 550.5            601.5
 6                165.8                       181.3             475.0                           562.5             282.8                   323.9                 No shells recoverable
 7                191.1                       279.7             664.4                           363.3             94.5                    195.3                 No shells recoverable
 8                810.0                       944.4             1229.5                          527.7             1101.2                  984.6                 0.0              0.0
 9                300.5                       374.0             611.7                           861.9             57.8                    172.3                 672.9            278.2
 10               145.7                       156.9             842.1                           722.7             82.1                    131.5                 No shells recoverable
 11               279.8                       321.7             409.9                           377.3             178.6                   277.4                 666.1            764.4
 12               340.5                       308.6             825.5                           548.3             86.5                    126.6                 758.9            511.0
 13               589.8                       527.2             551.3                           316.8             475.4                   518.8                 1056.5           425.7
 14               142.0                       178.3             428.7                           675.4             117.2                   164.2                 793.7            468.3
 16               15.5                        60.0              0                               0                 37.8                    79.2                  45.5             150.8


                                0.35
        Proportion of oysters




                                 0.3
                                0.25
                                 0.2
                                0.15
                                 0.1
                                0.05
                                  0
                                       0-2
                                             2-4
                                                   4-6




                                                                                                                      0-2
                                                                                                                            2-4
                                                                                                                                  4-6
                                                                10-15
                                                                        15-20
                                                                                20-25
                                                                                        25-30
                                                                                                30-40
                                                                                                        40-50




                                                                                                                                               10-15
                                                                                                                                                       15-20
                                                                                                                                                               20-25
                                                                                                                                                                       25-30
                                                                                                                                                                               30-40
                                                                                                                                                                                       40-50
                                                         6-10




                                                                                                                                        6-10
                                                                                                                >50




                                                                                                                                                                                               >50
                                                                May 2018                                                                 November 2018
                                                                                                         Size Range
Figure 20 Size frequency distribution of oyster shells across all samples taken in May and
November 2018.

Cover of oysters and other sessile invertebrates
At this stage, we were not able to identify any significant settlement of invertebrates on the
outside of the coir bags. This is unsurprising as significant growth of invertebrates on the
outside of the coir mesh bags was not expected within the first year, and therefore not a
compulsory success criteria for the first year in the monitoring program. We anticipate,
however, that given the positive indications of spat recruitment and oyster growth, that it is
likely that this target will be achieved fully in the coming years. We were, however, able to
use the quadrat samples (see figure 21) to show that there has been no significant
degradation of the coir mesh, that it is still strong, and that the gauge of the rope has not
been narrowed by any natural decomposition as yet. Similarly, we not that there is minimal
macroalgal coverage on the bags (<1% in all cases), meaning that there is no significant
fouling occurring that would limit the settlement of oysters either on, or into, the oyster
restoration units into the future.

Establishment of stable biogenic matrix
The development of the reefs is in the early stages, therefore 100% of randomly selected
oyster shells were still easily moved during both monitoring events. This is unsurprising as
the development of stable biogenic matric was not expected within the first year. We
anticipate, however, that given the positive indications of spat recruitment and oyster growth,
that this performance criteria will likely will be achieved in the coming years.


                                                                                                                                                                                                     23

Section 24

Figure 21 Example images of quadrat photos taken on oyster reef restoration units, here at
reefs 13 (top row) and 16 (bottom row). We did not identify any significant growth of
invertebrates on the outside of the oyster reef units, but there was also no significant
degradation of the coir mesh noted.




                                                                                        24

Section 25

Monitoring criteria 3- Community use and enjoyment of the declared fish
habitat area
Performance objective: Oyster restoration units do not significantly impair community use
and enjoyment of the declared Fish Habitat Area, particularly fishing activities.

Monitoring method: Maintain records of community feedback, evidence of vandalism, and
vessel strikes on the trial oyster reef restoration units. Records will be comprehensive and
include, as a minimum set:
    1. the number and type of complaints received (also, to allow the Department to gauge
       the success, any positive comments should also be provided);
    2. the type, nature, and severity of any acts of wilful vandalism; and
    3. the type and severity of any vessel strike.

Frequency: Annual reporting of all complaints, cases of willful vandalism, and instances of
vessel strike received for the three-year trial period.

Was the performance objective met? Noosa Council holds the data / information on any
complaints from the public. We did not identify any willful vandalism of the reefs, but we did
identify several instances of boat propeller and anchor strikes in the November 2018
monitoring event.

Supporting Evidence
Noosa Council is the designated contact for comments regarding the oyster reef restoration
project in the Noosa River, and of how this project affects the use and enjoyment of the
declared fish habitat area by the community. This is clearly stated on the signage at each
oyster reef restoration site (Figure 22).

We identified some damage to oyster reefs during the monitoring events (summarized in
Table 6). During the monitoring event in May 2018, only one reef required repairs. In
November 2018, most reefs required repair, and some coir bags were unrepairable. It is
likely that the majority of damage to the oyster reefs is caused by being struck by boat
propellers (especially at sites where bags were torn), and/or poorly placed or dragging boat
anchors (especially at sites where bags were torn and/or moved from their position on the
reef). During the November 2018 monitoring event, four of the reefs were also badly fouled
by fishing line and/or abandoned crab pots. This fishing gear was removed from the reefs
and disposed of. Combined, this damage resulted oyster spat necklaces being impossible to
retrieve from some reefs (see monitoring criteria 2, Table 5).

Members of the USC team have conducted several surveys on the fish fauna associated
with the oyster reefs in the Noosa River, beyond the monitoring events detailed here. In
association with these surveys, team members have taken note of the number of reefs
where fishing activities have been occurring (Table 7). Whilst this is simply a snapshot view
of the types of activities taking place around the reefs, it is indicative of the potential damage
occurring to the reefs. The key observation is a general increase in the number of fishing
boat at the reefs with time since installations. This is likely due to 1) the general public
becoming increasingly familiar with the locations and benefits of the reefs, 2) media reports
of the positive results regarding fish assemblages coming to light, and 3) the timing of
September school holidays.

Whilst we did not identify any acts of willful vandalism of the oyster reef restoration units
during our monitoring events, many marker buoys (placed on the corner of the reef units; a
compulsory condition of the development approval) were missing during monitoring events.
These were immediately replaced by the USC team. Some buoys were, however, removed
from sites the night after being reinstalled, thereby indicating very regular removal of reef
hardware by members of the public at some sites. This lack of buoys on the corner of the
oyster reefs is likely a contributor to some of the reefs being hit by boat propellers etc. No


                                                                                               25

Section 26

site signage was damaged or modified during the past year, so no maintenance or
replacement has been necessary (Figure 22).




Figure 22 Oyster reef restoration signage being installed at an oyster reef restoration site in
the Noosa River, with text on the sign indicating the contact details at Noosa Council for
comments on the broader oyster restoration project.




                                                                                             26

Section 27

       Table 6 List of recorded damage and repairs to oyster reefs during both monitoring events
Site    Damage May 2018              Repairs conducted        Damage November 2018            Repairs conducted
2       None                         NA                       All top bags torn. Buoy         Repairs to bags
                                                              missing.                        completed where
                                                                                              possible. Replaced buoy.
3       None                         NA                       All top bags torn. Buoy         Repairs to bags
                                                              missing.                        completed where
                                                                                              possible. Replaced buoy.
4       None                         NA                       Bottom right, and top right     Repairs to bags
                                                              bag torn. Middle reef unit      completed where
                                                              covered by significant          possible. Crab pot
                                                              sand. Right hand reef unit      removed.
                                                              and nearby buoy tangled
                                                              with crab pot.
5       Reef struck by boat which    Reef repaired and put    All top bags torn. Buoy         Repairs to bags
        broke mooring, one buoy      back in place.           missing.                        completed where
        missing                      Replaced buoy.                                           possible.
6       None                         NA                       Middle top bag ripped.          Repaired bag.
7       None                         NA                       Middle top bag ripped.          Repaired bag.
8       Right hand bag moved and     Repaired and put back    Right hand top bag torn.        Repaired bag, replaced
        torn, 1 buoy missing         on reef. Replaced        Buoy missing.                   buoy.
                                     buoy.
9       Right hand bag moved and     Repaired and put back    Left hand top bag torn,         Repaired bags.
        torn, 2 buoys missing.       on reef. Replaced        right hand reef significantly
                                     buoys.                   covered by sand, middle
                                                              top bag ripped.
10      One buoy missing.            Replaced buoy.           Top middle bag destroyed,       Repaired bag, replaced
                                                              significant covering by         buoy.
                                                              sand. Buoy missing.
11      Two buoys missing.           Replaced buoys.          Top middle bag torn.            Repaired bag.
12      None                         NA                       Right top bag torn.             Repaired bag.
13      None                         NA                       None                            NA
14      None                         NA                       None                            NA
16      None                         NA                       None                            NA



       Table 7 List of days USC team members have surveyed the reefs, and the number of reefs
       upon which fishing activities have been noted during these surveys.
Date of field work           Number of days   Sites visited   Activity being completed         Sites with boats
                                                                                               present
25-26 November 2017          2                3-8             Ecological function study        0
27-30 November 2017          4                All             Fish surveys                     0
29-30 December 2017          2                All             Fish surveys                     2
29-30 January 2018           2                3-8             Ecological function study        0
15-16 February 2018          2                All             Fish surveys                     1
26-27 March 2018             2                3-8             Ecological function study        2
29-30 March 2018             2                All             Fish surveys                     1
31 May, 1 June 2018          2                3-8             Ecological function study        0
15-18 May 2018               4                All             Fish surveys                     2
20-22 May 2018               3                All             6 month monitoring               3
27-28 June 2018              2                All             Fish surveys                     4
16-17 August 2018            2                All             Fish surveys                     2
1-2 October 2018             2                All             Fish surveys                     2
19-20 November 2018          2                All             Fish surveys                     3
26-27 November 2018          2                All             12 month monitoring              1




                                                                                                                  27

Section 28

Monitoring criteria 4- Other potential effects
Performance objective
Oyster reef restoration units do not cause a decline in the extent of marine plants within a 50
m radius of the restoration units, and are not attributed to erosion of adjacent shorelines or
other ambient environmental impacts.

Monitoring method
Map the area of marine plant habitats (seagrass, mangroves) in the immediate vicinity (i.e.
with a 50 m buffer) of each oyster restoration area, using high-resolution GPS (cm scale)
and field-validated aerial imagery (sourced from Nearmap) (NearMap, 2018). Monitor
changes in the composition coverage and condition of seagrass within 50 m radius around
the oyster reefs. Map the location and condition of estuarine shorelines that occur in the
immediate vicinity (i.e. with a 50 m buffer) of each oyster reef, using high-resolution GPS
(cm scale) and field-validated aerial imagery (sourced from Nearmap).

Frequency
Annually for a minimum of three years, or until any failed restoration units have been
removed.

Was the performance objective met?
All aspects of this performance objective were met, so no further action is necessary.

Supporting evidence
Mangroves and seagrasses were successfully mapped at each site using the described
methods (Figures 8-21). We identified no significant change in the distribution of mangroves
or seagrasses within the 50 m monitoring area (Table 8; t test, P>0.9), or any erosion to
nearby shorelines. Whilst the footprint of seagrass was lower at some sites, there was no
loss of seagrass attributable to the installation of the reefs (i.e. significant decline of
seagrass away from the reefs, especially within the RAA areas). Photographs of the
mangrove fringe and shoreline within the 50 m monitoring area both before the installation,
and during the 12 month monitoring event are available from USC upon request.

Table 8 Extent of seagrass and length of mangrove edge at within 50m of each oyster
restoration site at installation and 12 months post installation.

        Mangroves at        Mangroves at 12      Seagrass at           Seagrass at 12
                                                                2                2
 Reef   installation (m)    months (m)           installation (m )     months (m )
 2      113.9               119.4                0                     0
 3      92.0                87.9                 1995.9                1443.6
 4      135.6               133.8                0                     0
 5      162.3               175.2                0                     0
 6      39.4                43.6                 1372.1                1590.0
 7      43.1                48.2                 1480.8                1913.5
 8      108.8               112.0                0                     0
 9      180.8               181.8                0                     0
 10     110.7               114.4                0                     0
 11     138.5               137.5                0                     0
 12     114.4               116.9                151.9                 499.0
 13     81.7                82.3                 2105.0                1707.5
 14     134.5               136.2                854.6                 765.5
 16     0                   0                    0                     0




                                                                                            28

Section 29

No change to seagrass composition or density was identified at any restoration sites. All
sites were dense (>70% cover) and long (>20 cm) eelgrass (Zostera capricorni) (except for
sites 13 and 16- see below). During the 12 month monitoring event, we identified small (leaf
height <1 cm), low coverage (<5%) growth of dugong grass Halophila ovalis inside the RAA
area at site 13, and some small patches within the rocky shore adjacent to site 16. This
seagrass was not present at the sites during installation (Table 1). The growth of seagrass at
these sites is likely due to lower runoff in Lake Weyba and Weyba Creek over the past yeah,
and especially in the past 6 months, and the stabilizing and baffling effects of the reefs on
surrounding sediments (especially at site 13). Further monitoring will be required on these
growing seagrasses.

Conclusions
In this report, we show that;
    1. Oyster restoration units have not moved from the RAA area, nor have they moved
         greater than 1 m within the RAA area.
    2. There has been significant spat settlement and oyster growth at all oyster reef
         restoration sites. Whilst this has not yet proliferated to coverage of invertebrates on
         the outside of the coir bags, or to the proper stabilisation of shell within the bags (i.e.
         cementing of the biogenic reef matrix), these oyster growth results are a positive sign
         for the likely success of the reefs in achieving these performance criteria in the near
         future.
    3. Whilst we did not identify any wilful damage to the oyster restoration units, we did
         identify that marker buoys were regularly removed from the oyster restoration sites,
         and there have been several instances of boat propeller and anchor strikes on the
         reefs. This was repaired where possible.
    4. There has been no significant change to the distribution, composition or quality of
         seagrass or mangroves around the oyster reef sites. Similarly, there has been no
         shoreline erosion at oyster reef sites.

Consequently, two of the four monitoring targets reported on here have been fully met, the
third relating to oyster and invertebrate growth is tracking very favorably with the criteria
likely to be met in the coming years, and the final relating to community usage may require
closer monitoring.

We identified some damage to the oyster reef units from boating activities (principally anchor
and prop damage) at many sites during the November 2018 monitoring event. We have
some evidence to suggest that the use of oyster reefs by fishers has increased over time,
and that some of the ecological benefits of the reefs might therefore be being offset by
fishing. The three reefs more distant from the main boating activities in Lake Weyba and
Weyba Creek (due to the combined effects of limits on access to hire boats, and difficulty of
access due to shallow waters) are the most intact oyster reefs, with no damage recorded in
either 2018 monitoring events. Whilst these reefs do not necessarily have the highest rates
of settlement (the exception being reef number 13, which has the highest average live oyster
density), their success might be the most guaranteed as they are less likely to be damaged
by the sorts of impacts occurring on reefs in the central stretch of the river.

References
BAGGETT, L. P., POWERS, S. P., BRUMBAUGH, R. D., COEN, L. D., DEANGELIS, B. M.,
     GREENE, J. K., HANCOCK, B. T., MORLOCK, S. M., ALLEN, B. L., BREITBURG,
     D. L., BUSHEK, D., GRABOWSKI, J. H., GRIZZLE, R. E., GROSHOLZ, E. D., LA
     PEYRE, M. K., LUCKENBACH, M. W., MCGRAW, K. A., PIEHLER, M. F., WESTBY,
     S. R. & ZU ERMGASSEN, P. S. E. 2015. Guidelines for evaluating performance of
     oyster habitat restoration. Restoration Ecology, 23, 737-745.
NEARMAP. 2018. NearMap photomaps [Online]. Available: http://www.nearmap.com.au/
     [Accessed November 2018].



                                                                                                 29

Section 30

Appendices

                                                                                                                           1500                                                                        1500                                                                                                                                     1500




                                                                                                              Oysters/m2




                                                                                                                                                                                          Oysters/m2




                                                                                                                                                                                                                                                                                                                                   Oysters/m2
                                                                                                                           1000                                                                        1000                                                                                                                                     1000


                                                                                                                           500                                                                             500                                                                                                                                  500


                                                                                                                             0                                                                                      0                                                                                                                             0
                                                                                                                                        B           N             B       N                                                 B         N           B       N                                                                                            B         N   B     N
                                                                                                                                            May               November                                                          May           November                                                                                                     May       November



             1500
Oysters/m2




             1000


             500


               0
                                  B         N     B         N
                                      May        November




                                 1500                                                                       1500                                                                                 1500                                                                                                                                           1500
                    Oysters/m2




                                                                                               Oysters/m2




                                                                                                                                                                                    Oysters/m2




                                                                                                                                                                                                                                                                                                                                   Oysters/m2
                                 1000                                                                       1000                                                                                 1000                                                                                                                                           1000


                                 500                                                                        500                                                                                        500                                                                                                                                      500


                                      0                                                                        0                                                                                               0                                                                                                                                  0
                                            B         N           B          N                                               B          N             B           N                                                     B           N         B           N                                                                                            B         N   B     N
                                                May          November                                                             May            November                                                                   May           November                                                                                                         May       November




                                                              1500.0                                                                                       1500                                                                                                                                                                                 1500
                                                          Oysters/m2




                                                                                                                                              Oysters/m2




                                                                                                                                                                                                                                                                                                                                   Oysters/m2
                                                              1000.0                                                                                       1000                                                                                                                                                                                 1000


                                                                   500.0                                                                                   500                                                                                                                                                                                  500


                                                                       0.0                                                                                   0                                                                                                                                                                                    0
                                                                                 B         N      B               N                                                   B         N        B                          N                                                                                                                                  B         N   B     N
                                                                                     May       November                                                                   May       November                                                                                                                                                               May       November




                                                                                                                                                                                                                    1500                                                                          1500
                                                                                                                                                                                                       Oysters/m2




                                                                                                                                                                                                                                                                                     Oysters/m2




                                                                                                                                                                                                                    1000                                                                          1000


                                                                                                                                                                                                                    500                                                                               500


                                                                                                                                                                                                                        0                                                                              0
                                                                                                                                                                                                                                B         N           B       N                                                 B         N       B               N
                                                                                                                                                                                                                                    May               November                                                      May           November




                                                                                                                                                                                                                                                                      1500.0
                                                                                                                                                                                                                                                                  Oysters/m2




                                                                                                                                                                                                                                                                      1000.0


                                                                                                                                                                                                                                                                           500.0


                                                                                                                                                                                                                                                                               0.0
                                                                                                                                                                                                                                                                                                  B         N        B        N
                                                                                                                                                                                                                                                                                                      May           November




Figure S1 Map of oyster reef restoration sites with average (+/- SD) values for oyster
density during May and November 2018 monitoring events in the oyster reef bags (B) and
on the oyster necklaces (N).



                                                                                                                                                                                                                                                                                                                                                                                30

Section 31

                                                                                                                                           40                                                                                      40                                                                                                                                   40




                                                                                                                                                                                                             Oyster length




                                                                                                                                                                                                                                                                                                                                                        Oyster length
                                                                                                                           Oyster length
                                                                                                                                           30                                                                                      30                                                                                                                                   30

                                                                                                                                           20                                                                                      20                                                                                                                                   20

                                                                                                                                           10                                                                                      10                                                                                                                                   10

                                                                                                                                            0                                                                                            0                                                                                                                               0
                                                                                                                                                      B         N                B       N                                                        B         N        B        N                                                                                              B         N    B    N

                                                                                                                                                          May                November                                                                 May            November                                                                                                    May       November



                 40
 Oyster length




                 30

                 20

                 10

                  0
                                      B         N         B       N
                                          May            November




                                      40                                                                                  40                                                                                                 40                                                                                                                                         40
                      Oyster length




                                                                                                                                                                                                                                                                                                                                                        Oyster length
                                                                                                          Oyster length




                                                                                                                                                                                                   Oyster length
                                      30                                                                                  30                                                                                                 30                                                                                                                                         30

                                      20                                                                                  20                                                                                                 20                                                                                                                                         20

                                      10                                                                                  10                                                                                                 10                                                                                                                                         10

                                          0                                                                                0                                                                                                   0                                                                                                                                         0
                                                    B         N       B                N                                                   B          N             B            N                                                            B         N        B        N                                                                                                  B         N   B     N
                                                        May       November                                                                      May          November                                                                             May            November                                                                                                        May       November




                                                                                  40                                                                                        40                                                                                                                                                                                          40
                                                                  Oyster length




                                                                                                                                                            Oyster length




                                                                                                                                                                                                                                                                                                                                                        Oyster length
                                                                                  30                                                                                        30                                                                                                                                                                                          30

                                                                                  20                                                                                        20                                                                                                                                                                                          20

                                                                                  10                                                                                        10                                                                                                                                                                                          10

                                                                                   0                                                                                         0                                                                                                                                                                                           0
                                                                                           B         N   B                 N                                                         B         N     B                                N                                                                                                                                      B         N    B    N
                                                                                               May       November                                                                        May       November                                                                                                                                                                      May       November




                                                                                                                                                                                                                                             40                                                                            40
                                                                                                                                                                                                                                                                                                           Oyster length
                                                                                                                                                                                                                             Oyster length




                                                                                                                                                                                                                                             30                                                                            30

                                                                                                                                                                                                                                             20                                                                            20

                                                                                                                                                                                                                                             10                                                                            10


                                                                                                                                                                                                                                              0                                                                             0
                                                                                                                                                                                                                                                       B         N       B        N                                                  B         N       B                 N
                                                                                                                                                                                                                                                                                                                                         May           November
                                                                                                                                                                                                                                                           May           November




                                                                                                                                                                                                                                                                                                      40
                                                                                                                                                                                                                                                                                      Oyster length




                                                                                                                                                                                                                                                                                                      30

                                                                                                                                                                                                                                                                                                      20

                                                                                                                                                                                                                                                                                                      10

                                                                                                                                                                                                                                                                                                       0
                                                                                                                                                                                                                                                                                                                     B           N        B        N
                                                                                                                                                                                                                                                                                                                           May           November




Figure S2 Map of oyster reef restoration sites with average (+/- SD) values for oyster length
during May and November 2018 monitoring events in the oyster reef bags (B) and on the
oyster necklaces (N).




                                                                                                                                                                                                                                                                                                                                                                                                      31

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.