Oyster reef unit installations
The installation of oyster reef units to the Noosa River was done during a period of three
days, from 20 to 22 November 2017 (Figure 4). All works and surveys were conducted by a
team comprising professionals of Noosa Jetty Builders, and marine scientists from the
University of the Sunshine Coast. All oyster reef units and signs were installed exactly
according to specifications set out in the permit conditions and any instructions provided
regarding procedures (Table 1). All reef units are located to avoid any damage to marine
plants or surrounding ecosystem (Table 1, Figure 4). Key observations during the placement
of the reef units and associated signage include the following:
• No marine plants were disturbed during the installation of the reef units or signs.
Before each reef unit was placed on the seafloor, we carefully examined the site to
ascertain that no seagrass, mangrove aerial roots, or any other marine vegetation
was present. This ensured that no direct placement impacts occurred at any of the
sites (Table 1).
• All operations were localised to the immediate site where reef units were sunk onto
the seabed. Thus, no habitat outside the RAA area was impacted in any form by the
reef units or the signage.
• Poles holding the signs were installed using a narrow water jet ‘spear’. Use of this
gear ensured that only a very narrow (< 20 cm diameter in all cases) area of the
seabed was disturbed (Figure 4). Sign posts were then driven further into the
substrate, to a mean depth of 2.7 m (min 1.8 m, max 3.5 m; Table 1), using a post
driver (Figure 4).
• According to engineering specifications, we used marine grade hardwood stakes
(sourced from the Australian Hardwood Stake Company) to secure the reef units on
the seafloor. The stakes were hammered into the seabed to a mean depth of 0.9 m
(min 0.5 m, max 1.2 m) - depending on hardness of the seabed (Table 1), at a mean
angle of 82.4º (min 75 º, max 90 º).
• Pre- and post-installation photographs and videos of all sites are available
electronically (OneDrive folder). Full access to the all electronically stored imagery
has been provided to Noosa Council. In addition, we are happy to grant access to
whoever may require it (please email: [email protected]).
Figure 4 The resulting very small footprint of sign posts following installation by the water jet
(left) and a completed oyster reef in Weyba Creek (right).
7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.