Traffic Guidance Scheme
www.invarion.com
Notes to Traffic Guidance Scheme:
1. All signage to be placed, based on an onsite risk assessment, at the time of installation in accordance with clause 2.2.3 of the MUTCD Part 3.
2. This traffic guidance scheme is drawn, based on the principles of the MUTCD Pt. 3 "Works on Roads current issue ( Aug 2020)
3. It is the responsibility of the Principal Contractor (PC), to ensure, all signage is checked regularly, once installed.
4. The PC is responsible for ensuring all works are conducted in accordance with relevant legislation.
5. Due consideration to be given to all road users at all times.
6. All inappropriate signage to be covered or removed when not required, eg. 'workman & flagman signs.
7. Traffic Controllers to operate in accordance with the TCASAP (current issue).
8. Changes to the signage arrangements, as documented here, are to be recorded as per the requirements of the MUTCD Pt. 3 Clause 2.6.2
9. Placement of signage will need to take into account any existing signage at the location.
10. Where no distance for sign placement are given, a literal interpretation is required, based on an onsite risk assessment.
11. All dimensions given are approximate.
12. Drawings are not to scale, locations are indicative and must be assessed on site and adjusted if necessary within tolerances allowed.
13. A site prestart should be be undertaken prior to starting to ensure consultation with all workers understand the work activities and details of the TGS.
14. Signs and devices shall be set out and placed by a Traffic Management Implementation (TMI) qualified operative.
15. Setting out of signs and devices to be done in the following sequence and removed in reverse order:
a) Advanced warning and regulatory signs (including temporary speed zone signs)
b) All intermediate advance warning and regulatory signs and devices required in advance of the taper or start of work area.
c) All delineating devices required to form taper including the illuminated flashing arrow sign at the end of the taper where required.
d) Delineation of the work area or side track.
e) All other required warning and regulatory signs including termination and end of temporary speed zone signs.
16. Signage and devices to not be placed as to obstruct vehicles or pedestrians (usually 1m from any running lane) But clause 4.13.4 of the MUTCD should be observed in all situations.
17. Short term signage (usually up to 2 weeks) shall be mounted minimum 200mm above surface level, long term signage should be mounted on normal fixed supports so they are not likely to be disturbed by the weather,
vandals or traffic. (see clause 2.5.2 of MUTCD).
18. Signage should be duplicated on the right hand side of the road (One way or Multi lane divided) where possible if required.
19. Cone or bollard spacing should be done in accordance with table 3.7 of the MUTCD.
20. Minimum lane widths in accordance with table 4.11 and edge clearances will be maintained at all times.
21. Traffic controllers to be clothed in accordance with Traffic Controller Accreditation Scheme Approved Procedure (TCASAP).
22. Traffic Controllers shall be relieved from their duty after not more than 2 hours for a period of rest or other duties of at least 15 minutes (See TCASAP).
23. Clear communication procedure to be establish between controllers prior to starting any works (Usually portable two way radios in good working order).
24. An escape path should always be established prior to starting work and communicated to any rest relief .
25. Plant, vehicles and materials are not to be stored in positions where they may create a hazard, obscure signage or block line of sights for approaching drivers or junctions.
26. Traffic controllers should follow the guidlines for daily routines (Appendices A2 & A3 of MUTCD Part 3).
27. Any changes to the TGS (Outside the scope of TMI Table 1.4.31 Supplement MUTCD Part 3) shall be reported to a TMD officer for approval.
28. Excavation works adjacent to running lane to be delineated in accordance with table E1 in the MUTCD Part 3.
29. These TMP/TGS are prepared in accordance with the information supplied by the client. TMD is not responsible for any omissions or errors in the base information supplied by the client.
30. All incidents/ accidents within the site area to be dealt with in accordance with the site safety plan. Traffic controllers may assist if needed and safe to do so.
TRAFFIC GUIDANCE SCHEME NOTES
East Coast CLIENT SHADFORTH
Notes:
1. TGS drawn with the information provided
Traffic Services
SITE IAN ROBBINS
TMD ID PROJECT LACEYS CREEK ROAD
DATE 26/09/2020 651 CONTACT 0417 080 772
NUMBER
DESIGNED ANDREW TGS NUMBER 2009251 2009261 REVISION 0
BY HUSSEY
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 11 pages
Page 2
www.invarion.com
LANE CLOSURE 2 Way Road Low Volume Residential Area
(Construction Works) 50kph Posted speed Short Term Works
REDUCE
AHEAD
WORK
ROAD
REDUCE SP
N
SPEED
50
DO NOT OV
O
40
R
EED
K
ERTAKE
PREPARE
E
STOP
E
T
TO
P
L
E
H
F
SLOW
STOP
CORDW
T
OOD DR
SITE ENTRY EXIT
2030m
1015m
30m
15m
Taper
50
LY FE
DRIVE SA
ROAD
WORK
END
Running Lane to be 3.5m
wide as its on a bend.
30m
STOP
PRE
T
K
PAR E
UR
TO E 30m
E
P
DO STO
NOT
CO
L
P
OVE F
E
RTA T
KE
EE
LG
WI
RED
40 1015m
UCE
S PEE
D
YL
EFA
05 S EVIRD
KR
DA OW
O
DN R
E
RO
2330m
NOT TO SCALE
WO AD
AH RK
RED
EA
D 50
UCE
SPE
ED
LEGEND Traffic Management & TGS Designer Approval Details
East Coast TRAFFIC GUIDANCE SCHEME NOTES. CONTAINED STOP
TMP No. TGS No. Version Date.
WORK AREA TRAFFIC
N/A 2009251 1 25/09/2020
Traffic Services
1. See notes sheet for full notes CONTROLLER
2. Traffic controllers to have good line of sight to approaching vehicles.
DELINEATION AS Designer Name Designer Signature Designer No.
3. Traffic controllers to have good escape routes. PER TABLE E1
4. Duration and Date TBC
APPROVED I.ROBBINS Andrew Hussey 651
TWIN LEG SIGN
Traffic Management Contact Site Location
SINGLE LEG SIGN
TMR # 0322 IAN ROBBINS 0417 080 772 CORDWOOD DRIVE LAKE MACDONALD
Page 3
www.invarion.com
SHOULDER CLOSURE 2 Way Road Low Volume Residential Area
(Construction Works) 50kph Posted speed Short Term Works
REDUCE
AHEAD
WORK
ROAD
N
SPEED
50
REDUCE SP
O
R
40
T
EED
CORDW H
OOD DR
SITE ENTRY EXIT
2030m
2030m
50
FELY
DRIVE SA
ROAD
WORK
END
2030m
T
UR
40
CO
RED
UCE
SPEE
EE
D
LG
WI
YL
EFA
05 S EVIRD
KR
DA OW
O
DN R
E
2030m
RO
NOT TO SCALE
WO AD
AH RK
RED
EA
D 50
UCE
SPE
ED
LEGEND Traffic Management & TGS Designer Approval Details
East Coast TRAFFIC GUIDANCE SCHEME NOTES. CONTAINED
TMP No. TGS No. Version Date.
WORK AREA
N/A 2009252 1 25/09/2020
Traffic Services
1. See notes sheet for full notes
2. Workman signs to be covered outside work hours.
DELINEATION AS Designer Name Designer Signature Designer No.
3. Duration and Date TBC PER TABLE E1
APPROVED I.ROBBINS Andrew Hussey 651
TWIN LEG SIGN
Traffic Management Contact Site Location
SINGLE LEG SIGN
TMR # 0322 IAN ROBBINS 0417 080 772 CORDWOOD DRIVE LAKE MACDONALD
Page 4
www.invarion.com
ADVANCED WARNING SIGNAGE 2 Way Road Low Volume Residential Area
(Construction Works) 50kph Posted speed Long Term Works
REDUCE
AHEA
WORK
N
ROAD
70m distance should enable semipermanent
D
poles to be erected for use with other TGS Distances.
O
SPEED
R
T
CORDW H
OOD DR
SITE ENTRY EXIT
70m
NOTES:
Truck signs to be erected when truck entry or exit
may cause a hazard for road uses.
Signs to be covered or removed if no hazard
exists.
T
70m
UR
CO
EE
LG
WI
RO
W AD
AH ORK
EA
D
RED
UC
ES
PEE
D
NOT TO SCALE
LEGEND Traffic Management & TGS Designer Approval Details
East Coast TRAFFIC GUIDANCE SCHEME NOTES. CONTAINED
TMP No. TGS No. Version Date.
WORK AREA
N/A 2009253 1 25/09/2020
Traffic Services
1. See notes sheet for full notes
2. Duration and Date TBC
DELINEATION AS Designer Name Designer Signature Designer No.
PER TABLE E1
APPROVED I.ROBBINS Andrew Hussey 651
TWIN LEG SIGN
Traffic Management Contact Site Location
SINGLE LEG SIGN
TMR # 0322 IAN ROBBINS 0417 080 772 CORDWOOD DRIVE LAKE MACDONALD
Page 5
www.invarion.com
LANE CLOSURE 2 Way Road Low Volume Rural Area
(Construction Works) 60kph Posted speed Short Term Works
DE
E N
3090m 06 PS ECUD
E
R ND
W OAD
OR O
DR K
60 DA ER
R
IV DE KR EH
E
SA E DA OW A
FE
LY
1545m 04 PS ECUD OR
T
ER
E
F
T
EK
H
L AT
REV
P
PO OT
E
E
TS ON
K ER OT OD
AP
ER
90m P
RO
PO
EK
AT
RE
VO
LEGEND
STOP TS TO
ER OT NO
AP D
30m Taper ER
P
CONTAINED
WORK AREA
RO
15m DELINEATION AS
PER TABLE E1
30m TWIN LEG SIGN
Taper
SINGLE LEG SIGN
SITE ENTRY EXIT 15m
Term STOP
TRAFFIC
CONTROLLER
STOP
HERE SIGN TO BE PLACED 6M IN FRONT OF SIGNALS IF USED
ON RED
SIGNAL
TRAFFIC GUIDANCE SCHEME NOTES.
1. See notes sheet for full notes
2. Traffic controllers to have good line of sight to approaching vehicles.
3. Traffic controllers to have good escape routes.
4. Duration and Date TBC
O
R SLOW
STOP
20m SB
K
E
E
PR
East Coast
30m Taper
P
EP
DO A
T RE
L
NO ST O
E
TO OP
F
VE OR
T
DR
RTA
KE
Traffic Services
LD
PR
EP
A
DO A
T RE
ON
NO ST O
TO
VE OP 90m
CD
RT
AK
E APPROVED I.ROBBINS
MA
KE
LA
TMR # 0322
RE
DU 40 1545m
CE
NOT TO SCALE
SP
EE
D
YL
E
06 FAS EV Traffic Management & TGS Designer Approval Details
IR
KR D TMP No. TGS No. Version Date.
R DA OW
W OA
N/A
AH OR D DN OR
RE
DU
EA K
D
60
3090m E
2009254 1 25/09/2020
CE
SP Designer Name Designer Signature Designer No.
EE
D
Andrew Hussey 651
Traffic Management Contact Site Location
IAN ROBBINS 0417 080 772 LAKE MACDONALD DRIVE LAKE MACDONALD
Page 6
www.invarion.com
SHOULDER CLOSURE 2 Way Road Low Volume Rural Area
(Construction Works) 60kph Posted speed Long Term Works
N
O
R
T
DE
E H
06 PS ECUD
DA ER
KR EH
DA OW A
OR
LEGEND
3090m
E
CONTAINED
R ND WORK AREA
W OAD
OR
DR
IV
E
K
60
SA DELINEATION AS
FE
LY PER TABLE E1
DE TWIN LEG SIGN
E
04 PS ECUD
ER SINGLE LEG SIGN
1545m
SITE ENTRY EXIT
TRAFFIC GUIDANCE SCHEME NOTES.
1. See notes sheet for full notes.
2. Duration and Date TBC.
3. Workman signage to be covered outside of work hours.
20m SB
30m Taper
East Coast
DR
Traffic Services
LD
3090m
A
RE 40
ON
DU
CE
CD
SP
EE APPROVED I.ROBBINS
MA
D
KE
LA
YL
TMR # 0322
E
06 FAS EV
NOT TO SCALE
IR
KR D
DA OW
DN OR
E
3090m
R
W OA
Traffic Management & TGS Designer Approval Details
AH OR D
E K
RE AD
DU
CE
60 TMP No. TGS No. Version Date.
SP
EE
D N/A 2009255 1 25/09/2020
Designer Name Designer Signature Designer No.
Andrew Hussey 651
Traffic Management Contact Site Location
IAN ROBBINS 0417 080 772 LAKE MACDONALD DRIVE LAKE MACDONALD
Page 7
www.invarion.com
ADVANCED WARNING SIGNAGE 2 Way Road Low Volume Rural Area
(Construction Works) 60kph Posted speed Long Term Works
LOCATION MAP
DR
D
AL
ON
NOTES:
CD
Truck signs to be erected when truck entry or exit
MA
may cause a hazard for road uses.
Approx 90m
KE
Signs to be covered or removed if no hazard
LA
exists.
SITE ENTRY EXIT
LOT 4.
Approx 90m
LOT 1.
Approx 90m
LEGEND SITE ENTRY EXIT
TRAFFIC GUIDANCE SCHEME NOTES.
DR
CONTAINED
WORK AREA 1. See notes sheet for full notes.
LD
N 2. Duration and Date TBC.
NA
DELINEATION AS O
DO
PER TABLE E1
R
AC
EM
TWIN LEG SIGN
T
K
H
LA
NOT TO SCALE
SINGLE LEG SIGN
Traffic Management & TGS Designer Approval Details Approx 90m
East Coast TMP No. TGS No. Version Date.
N/A 2009256 1 26/09/2020
Traffic Services Designer Name Designer Signature Designer No.
APPROVED I.ROBBINS Andrew Hussey 651
Traffic Management Contact Site Location
TMR # 0322 IAN ROBBINS 0417 080 772 LAKE MACDONALD DRIVE LAKE MACDONALD
Page 8
www.invarion.com
LANE CLOSURE 2 Way Road Low Volume Rural Area
(Construction Works) 60kph Posted speed Long Term Works
DEE
EN PS
RO D
WO AD 3090m 06 ECUDER
DR
RK
IVE
60 DA
KR EHA
N
DA OW
SA
FE
LY
DEE
P SE
OR O
1545m 04 CUD
ER R
T
EKA
F
T
POT
TRE
VO
TON
H
L
E
90m S OD
P ERA OT
E PER
EKA
K
E P RO TRE
VO
RO POT
S
TON
OD
ERA OT
POT
S
PER
P
LEGEND
30m Taper CONTAINED
WORK AREA
15m
DELINEATION AS
PER TABLE E1
30m TWIN LEG SIGN
LENGTH OF WORK AREA Taper
APPROX 150m LONG. SINGLE LEG SIGN
15m STOP
Term TRAFFIC
CONTROLLER
STOP
HERE SIGN TO BE PLACED 6M IN FRONT OF SIGNALS IF USED
ON RED
SITE ENTRY EXIT SIGNAL
TRAFFIC GUIDANCE SCHEME NOTES.
1. See notes sheet for full notes
2. Traffic controllers to have good line of sight to approaching vehicles.
R
3. Traffic controllers to have good escape routes.
DD
4. Duration and Date TBC
5. Residents to be catered for at all times.
AL
ON
CD
MA
East Coast
KE
LA
OR SL
STOOWP 20m SB
Traffic Services
30m Taper APPROVED I.ROBBINS
K
E
PR
EPA E
P
DO T RE
NO
TO STO O L
E
P
VE
RTA OR F
T
TMR # 0322
KE
PR
EPA
DO
NO
T RE
STO O
90m
TO
NOT TO SCALE
VE P
RTA
KE
Traffic Management & TGS Designer Approval Details
1545m TMP No. TGS No. Version Date.
40
N/A
RED
UCE
SPE
ED
2009257 1 27/09/2020
Designer Name Designer Signature Designer No.
YL
EF
06 AS EVIRD
RO
W AD
AH ORK
Andrew Hussey 651
RED
EA
D
UC
60 3090m KR
DA OW
O
DN R Traffic Management Contact Site Location
ES E
PEE
D IAN ROBBINS 0417 080 772 LAKE MACDONALD DRIVE LAKE MACDONALD
Page 9
www.invarion.com
LANE CLOSURE 2 Way Road Low Volume Rural Area
(Construction Works) 60kph Posted speed Long Term Works
EN
RO D
WO AD DEE
RK
60 PS
N
DR
IVE
SA
30
90 06 ECU
DER
FE
LY m DA
KR EHA
O
DA OW
DEE OR R
PS
04 ECUDER T
15 H
45m
EK
ATR
LEGEND
EV
PO OT
TS ON
90m ER TO OD CONTAINED
AP WORK AREA
ER
P
RO EK
ATR
EV
T
PO OT DELINEATION AS
F
TS ON
ER OT OD
E
L
AP PER TABLE E1
ER
P
E P
30 E
TWIN LEG SIGN
m
K
Tap
er WPOOTL
RO
SS SINGLE LEG SIGN
20m
SB STOP
TRAFFIC
CONTROLLER
R
DD
SITE ENTRY EXIT
AL
STOP
HERE SIGN TO BE PLACED 6M IN FRONT OF SIGNALS IF USED
ON
ON RED
SIGNAL
CD
MA
TRAFFIC GUIDANCE SCHEME NOTES.
KE
1. See notes sheet for full notes
LA
2. Traffic controllers to have good line of sight to approaching vehicles.
3. Traffic controllers to have good escape routes.
4. Duration and Date TBC
5. Residents to be catered for at all times.
15
East Coast
Ter m
Traffic Services
LENGTH OF WORK ARE
m A
APPROX 150m LONG.
30 APPROVED I.ROBBINS
Tap m
er
15 TMR # 0322
m
30m
DO
NOT
PRE
STO
PA
TO RE OR
STO
P
Tap
e r NOT TO SCALE
OVE
RTA
P OR
KE PRE
Traffic Management & TGS Designer Approval Details
K
PA E
TO RE
E
P
DO STO
NOT
OVE P 90m E
L
TMP No. TGS No. Version Date.
RTAK T
F
N/A
E
2009258 1 27/09/2020
RED 40
UCE 15 Designer Name Designer Signature Designer No.
RO SPE 45m
WO AD ED YL
E FA
Andrew Hussey 651
AH RK
RED D
EA
60 06 S EVIRD
UCE 30 KR
DA OW
SPE 90m O
DN R Traffic Management Contact Site Location
ED E
IAN ROBBINS 0417 080 772 LAKE MACDONALD DRIVE LAKE MACDONALD
Page 10
www.invarion.com
OUT OF HOURS 2 Way Road Low Volume Rural Area
(Construction Works) 60kph Posted speed Long Term Works
EN
RO D
WO AD DEE
OUT OF HOURS
RK
60 PS
N
DR
IVE
S
06 ECU
DER
AF
EL
Y
DA
KR EHA
O
DA OW
OR R
T
H
DEE
PS
04 ECUDER
C
O
VE
LEGEND
R
ED
CONTAINED
WORK AREA
EK
ATR
EV
PO OT
CO
TS ON DELINEATION AS
ER OT OD
PER TABLE E1
AP
ER
VE
P
TWIN LEG SIGN
RE
D
SINGLE LEG SIGN
STOP
TRAFFIC
CONTROLLER
R
DD
SITE ENTRY EXIT
AL
ON
CD
MA
TRAFFIC GUIDANCE SCHEME NOTES.
KE
1. See notes sheet for full notes
LA
2. Duration and Date TBC
3. Residents to be catered for at all times.
East Coast
Traffic Services
APPROVED I.ROBBINS
CO
TMR # 0322
VE
PRE
PA
TO RE
RE
DO STO
NOT
NOT TO SCALE
OVE P
D
RTA
KE
CO
Traffic Management & TGS Designer Approval Details
VE
RED 40
RE
UCE TMP No. TGS No. Version Date.
SPE
N/A
ED
D
2009258 1 27/09/2020
Designer Name Designer Signature Designer No.
RO YL
WO AD E FA
Andrew Hussey 651
AH RK
EA
RED D 60 06 S EVIRDKR
UCE DA OW
SPE O
DN R Traffic Management Contact Site Location
ED E
IAN ROBBINS 0417 080 772 LAKE MACDONALD DRIVE LAKE MACDONALD
Page 11
www.invarion.com
SHOULDER CLOSURE 2 Way Road Low Volume Rural Area
(Construction Works) 60kph Posted speed Long Term Works
DEE N
PS
06 ECU
DER O
R
DA
KR EHA
DA OW
OR
T
3090m H
EN
RO D
WO AD
DR
RK
IVE
60
SA
LEGEND
FE
LY
DEE
PS
LENGTH OF WORK AREA ECU
APPROX 150m LONG.
04 DER CONTAINED
WORK AREA
3090m DELINEATION AS
PER TABLE E1
TWIN LEG SIGN
SINGLE LEG SIGN
15m Term
R
DD
TRAFFIC GUIDANCE SCHEME NOTES.
SITE ENTRY EXIT
AL
1. See notes sheet for full notes
ON
2. Duration and Date TBC
CD
3. Residents to be catered for at all times.
MA
KE
LA
20m SB
East Coast
30m Taper Traffic Services
APPROVED I.ROBBINS
TMR # 0322
3090m
RED 40
NOT TO SCALE
UCE
SPE
ED
YL
E FA
06 S EVIRD KR
Traffic Management & TGS Designer Approval Details
DA OW
O TMP No. TGS No. Version Date.
DN R
E
N/A 2009260 1 27/09/2020
3090m Designer Name Designer Signature Designer No.
RO
WO AD
AH RK Andrew Hussey 651
EA
RED D 60
UCE
SPE Traffic Management Contact Site Location
ED
IAN ROBBINS 0417 080 772 LAKE MACDONALD DRIVE LAKE MACDONALD
Page 12
www.invarion.com
SHOULDER CLOSURE 2 Way Road Low Volume Rural Area
(Construction Works) 60kph Posted speed Long Term Works
N
DEE
PS O
06 ECUDER R
DA
KR EHA
DA OW
OR T
30 H
90
m
EN
RO D
WO AD
DR
RK
IVE
60 LEGEND
SA
FE
LY
CONTAINED
DEE WORK AREA
PS
04 ECU
DER
DELINEATION AS
30 PER TABLE E1
90
m
TWIN LEG SIGN
SINGLE LEG SIGN
30m
Tap
er
R
DD
TRAFFIC GUIDANCE SCHEME NOTES.
AL
SITE ENTRY EXIT 20m 1. See notes sheet for full notes
ON
SB 2. Duration and Date TBC
CD
3. Residents to be catered for at all times.
MA
KE
LA
East Coast
15
m
LENGTH OF WORK AREA
Traffic Services
Ter APPROX 150m LONG. APPROVED I.ROBBINS
m
TMR # 0322
30
90m
RED
UCE
40 NOT TO SCALE
SPE
ED
YL
Traffic Management & TGS Designer Approval Details
EF
06 AS EVIRD TMP No. TGS No. Version Date.
KR
DA OW
O
DN R
E N/A 2009261 1 27/09/2020
30 Designer Name Designer Signature Designer No.
90m
RO Andrew Hussey 651
W AD
AH ORK
RED
EA
D
UCE
60 Traffic Management Contact Site Location
SPE
ED IAN ROBBINS 0417 080 772 LAKE MACDONALD DRIVE LAKE MACDONALD