Original source · versioned page text
Traffic Guidance Scheme
www.invarion.com
SHOULDER CLOSURE 2 Way Road Low Volume Rural Area
(Construction Works) 60kph Posted speed Long Term Works
N
DEE
PS O
06 ECUDER R
DA
KR EHA
DA OW
OR T
30 H
90
m
EN
RO D
WO AD
DR
RK
IVE
60 LEGEND
SA
FE
LY
CONTAINED
DEE WORK AREA
PS
04 ECU
DER
DELINEATION AS
30 PER TABLE E1
90
m
TWIN LEG SIGN
SINGLE LEG SIGN
30m
Tap
er
R
DD
TRAFFIC GUIDANCE SCHEME NOTES.
AL
SITE ENTRY EXIT 20m 1. See notes sheet for full notes
ON
SB 2. Duration and Date TBC
CD
3. Residents to be catered for at all times.
MA
KE
LA
East Coast
15
m
LENGTH OF WORK AREA
Traffic Services
Ter APPROX 150m LONG. APPROVED I.ROBBINS
m
TMR # 0322
30
90m
RED
UCE
40 NOT TO SCALE
SPE
ED
YL
Traffic Management & TGS Designer Approval Details
EF
06 AS EVIRD TMP No. TGS No. Version Date.
KR
DA OW
O
DN R
E N/A 2009261 1 27/09/2020
30 Designer Name Designer Signature Designer No.
90m
RO Andrew Hussey 651
W AD
AH ORK
RED
EA
D
UCE
60 Traffic Management Contact Site Location
SPE
ED IAN ROBBINS 0417 080 772 LAKE MACDONALD DRIVE LAKE MACDONALD
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.