Delegated Report - Code - Planning MCU25 0067 (As Published)

of 28
               3.     CURRENCY PERIOD OF APPROVAL

               The currency period for this development approval is stated in the conditions below.
               4.     ASSESSMENT MANAGER CONDITIONS

               PLANNING
                      When Conditions must be Complied With
               1.     Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to
                      the use commencing, and then compliance maintained at all times while the use continues.
                      Currency Period
               2.     This development approval lapses if the use has not happened by 17 July 2032, unless an
                      application to extend the currency period is approved by Council.
                      Approved Plans
               3.     Where there is any conflict between the conditions of this approval and the details shown on
                      the approved plans and documents, the conditions of approval prevail.
               4.     Development authorised by this approval must be undertaken generally in accordance with
                      the Approved Plans listed in the table below. The plans must be amended to incorporate the
                      amendments listed within the table below and resubmitted to Council prior to the issue of any
                      Development Permit for Operational Works.

                         Plan No.           Rev.    Plan/Document Name                             Date

                         -                  -       -                                              -

                      The following plans require amendment.

                         Plan No.            Rev.   Plan/Document Name                             Date

                         DA03                3      Site Plan – Proposed prepared by Studio 20.04.2026
                                                    Workshop Architects

                         DA06                3      Materials and Finishes prepared by Studio 20.04.2026
                                                    Workshop Architects

                         DA100               2      Ground Floor Plan prepared by Studio 20.04.2026
                                                    Workshop Architects

                         DA101               2      First Floor Plan prepared        by   Studio 20.04.2026
                                                    Workshop Architects

                         DA102               2      Second Floor Plan prepared by Studio 20.04.2026
                                                    Workshop Architects

                         DA103               2      Third Floor Plan prepared by Studio 20.04.2026
                                                    Workshop Architects

                         DA104               3      Roof Plan prepared by Studio Workshop 20.04.2026
                                                    Architects

                         DA105               2      Typical Unit Detail Plan prepared by Studio 20.04.2026
                                                    Workshop Architects




Document Set ID: 23854028
Version: 14, Version Date: 13/08/2026

Log in to download the original (Delegated Report - Code - Planning MCU25 0067 (As Published).pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.