PROPOSED ALTERATIONS TO UNIT 14 2-10 BANKSIA AVENUE NOOSA HEADS FOR BRENDAN AND MISHELL HARROP distinctive building design services
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 6 pages
Page 2
‘A_[1@/09720| ISSUE FOR AUTHORITY APPROVALS GiB REAL PROPERTY DESCRIPTION Street No 14 Lot 3 on GTP3209 Pa 3B 3 Parish of Noosa County of March Local Authority: Noosa Shire Council Lot 3 Site Area = 133m2 (b e Site Coverage = 65 % N f Wy Q Z & Q \b e > S feos of eat SANDE TERSICES en = GROUP TITLES PLAN NO. _92()9 S | é 7 see GS , 5 a | <¢ g |, 8 | ve | | ] | j | | Ie / _\ | Z 1g / N | is / iS Y iv | / 738 | K) 7 3 | ws | : : | X 7 | | | | 127, Y | 6 | | m2 | cotate be © way ° / O reo Ms 7 . | / QO | _ > F pe Paes ~ OS | i e | 192m2 / / bt A 19.301 Jo 27034" DISTINCTIVE BUILDING DESIGN SERVICES Project Drawing Tile: Drawn: Checked: ‘Commencement Date: Revision No: TEL o7sari1978 wow oatzaaaser PROPOSED ALTERATIONS TO UNIT 14 FOR BRENDAN AND MISHELL SITE PLAN 6B GiB JULY 2020 EMAL ce Sreraconceptsald.comey Ta, Papa ae Danian A casa 14/2-10 BANKSIA AVENUE NOOSA HEADS 200604 1:250@A3 A-WD01 Toncepts
Page 3
‘A_[1@/09720| ISSUE FOR AUTHORITY APPROVALS GiB | UNIT 13 | UNIT 14 | | | | | | | | | | | | | | | | UNIT 13 | UNIT 14 | UNIT 15 foyer || foyer g | | s | | | | | garage ! ! garage | | fg | | g | ee | | - | | | | | | 3300 2005 2005 3300 | | | 2005 3300 | 5400 5400 I | I | | | EXISTING LOWER FLOOR PLAN EXISTING UPPER FLOOR PLAN ce roject Drawing Tile: Drawn’ Checked: ‘Commencement Date: Revision No: te 3 : 387 EXISTING FLOOR PLANS 6B GB JuLy 2020 casa— 14/2-10 BANKSIA AVENUE NOOSA HEADS. 200604 1:50@A3 A-WD02 Toncepts
Page 4
‘A_[1@/09720| ISSUE FOR AUTHORITY APPROVALS GiB exist'g foyer exist'g foyer UNIT 13 UNIT 14 UNIT 15 | 1 T . : —— exist'g garage | M | | exist'g garage | i | | | | | | i -— extent oficantilevering balcony above o | tl | | 2 eis at ei | | . exist'g lattice Screen as is H new covered access way I \ Vt | I | —| | | I | I 7 77 ae exist'g timber post —“ | rR to remain | | | | | | 2005 | 925 | 1080 exist'g garage door to remain / 8 | ‘ replace framing above ~~ | | g | oO Lo UO _ J NN i | new 100x100 hwd timber post | | 2005 | |190 3110 | PROPOSED LOWER FLOOR PLAN | | DISTINCTIVE BUILDING DESIGN SERVICES Project: Drawing Title: Drawn: Checked: ‘Commencement Date: Revision No: TEL o7sarit978 wow oatzaaaser PROPOSED ALTERATIONS TO UNIT 14 FOR BRENDAN AND MISHELL PROPOSED LOWER FLOOR PLAN C) 6B GB JULY 2020 A EMA enon [email protected] Tr Fan Se Daan casa “ 14/2-10 BANKSIA AVENUE NOOSA HEADS 200604 1:50@A3 A-WD03 Toncepts
Page 5
casa UNIT 13 new alum louvred window exist'g lattice screen as is UNIT 14 replace existing door head with new lintel to engineers detail remove existing 3.0mtr wide sliding glass door and make good opening to suit new 2.1 x 3.9 alum bi-parting sliding glass door (4 (woo —— existing common wall to remain as is ‘A_[1@/09720| ISSUE FOR AUTHORITY APPROVALS GiB + existing common wall to remain as is UNIT 15 tiles over membrane new timber post terminates at balcony floor level ; roofed balcony | relocate downpipe to suit clearance of additional balcony floor joist below DISTINCTIVE BUILDING DESIGN SERVICES, Propet 30 LIVISTONA DRIVE DOONAN QLD 4562 TEL 07 54711978 MOB 0412444387 EMAIL [email protected] QBSA LICENCE No 66202 14/2-10 BANKSIA AVENUE NOOSA HEADS Fo>S> SSS SSS SSS SSS SSS SSS SSS STH hh ill S A Poesia POSS PSST aS SS SSS ay > —>-- =- ns TT TO TY I tty Lt I exist'g planter | | | | | | demolish exist'g planter and balcony : ‘tt flooring / make good framing to suit ! terminate exist'g pergola beams i | ee | ' at new balcony extent o Hasso >to 4 =--4---- extended balcony to detail I alum louvred a i exist'g adjacent verandah/pergola 1 t new timber post terminates ——= TI at balcony floor level Ss | ee : a wa A solid balustrade to 850 with timber top rail at min / : oe a : new dp connected to —~ 1.0mtr height above FFL (similar to exist'g detail) existing stormwater drainage pipework 925 || 100 4280 new timber post continuous to extent of new fly-over roof above PROPOSED UPPER FLOOR PLAN new pad footing at ground level Drawing Title: Drawn: Checked: Commencement Date: Revision No: PROPOSED ALTERATIONS TO UNIT 14 FOR BRENDAN AND MISHELL PROPOSED UPPER FLOOR PLAN 6B GuB JULY 2020 A Tecaton Project No saa Drawing No 200604 1:50@A3 A-WD04 Toncepts
Page 6
‘A_[1@/09720| ISSUE FOR AUTHORITY APPROVALS GiB
450
new ‘ArcPanel' 100m thick insulated block off dropper from this gutter and provide
awning roof system / position roof panels _ relocated dp to spreader over new awning roof
existing roof beyond as is metal roof beam supported on steel __'0 bridge between adjacent hip roof and . : en
stub posts to engineers detail gabled outdoor roof fascia board provide continuous watertight flashing at interface between new
awning roof and existing common wall / barge of awning roof to
be fully wrapped with continuous 'C' capping prior to installation
TU
Ue a 0 half-round fascia guttering to match exist
Hl slat 4 jalf-round fascia guttering to match existing
FCL ; rt " ayn vara, IE fo :
\
. |
upgrade lintel over new widened —mf]__//\ .
\ replace this length of half-round guttering I
door opening to engineers detail \ with corrected falls towards new rwh 1 | 450
New purpose formed colorbond metal i
re-position new downpipe to clear additional rainwater head with overflow —<|— existing rendered blockwork wall as is
o deck joist below and avoid using offset pipe tiled skirting to perimeter with continlious. ' ; oo ;
gS joints above new tiled deck (re-direct pipework . silicone joint at interface with floor tiles 140x40 timber top rail in similar detail to existing handrail
N as required within garage below and maintain new deck tiles over wp membrane over ! i
straight run of downpipe thru new deck) Hardies 'Scyon' external FC flooring —_{-
=> system installed to man. specifications / Lal
provide watertight seal at downpipe provide fall towards continuous strip = new timber framed solid balustrade with hardies baseboard
to finished tile surface interface drain as noted on floor plan M ry o FC (blueboard) over in render finish to match existing /
Vy Ss provide wp membrane over all jointed edges
I | | _
hy | |
FFL 4 | Loft ] |
| -
|
; 4 / C \
install new fonger cant OP for 240x03 E13 LVL \ I direct surface drainage from strip drain back to existing
joists against face of existing hwd joists | i | | downpipe at corner of garage as shown on floor plan
Vl |
wo remove exist|ng tiles and floor sheeting and | i i FC sheet soffit lining to balcony extension
5 make good all floor joists showing deterioration I |
|
as extent of existing reinforced alignment of new 100x100 hwd timber post
blockwork pillar to corner of garage | i
ith: seting Hi la ! downpi cted to existing stormwater drai
| new pvc downpipe connected to existing stormwater drainage
existing downpipe within garage ——= existing tilt door to garage to remainias is——~ | system / check clearance of tit door is maintained on site
nt |
| |
FFL ! i MI
\ i L .
i
L/S VF f “=
existing paving to remain as is
SECTION
scale 1:50
DISTINCTIVE BUILDING DESIGN SERVICES Project: Drawing Title: Drawn: Checked: Commencement Date: Revision No:
Tet ovsevit978 mop oa1zaascev PROPOSED ALTERATIONS TO UNIT 14 FOR BRENDAN AND MISHELL SECTION 6B GB JULY 2020
ouen LICENCE eo masaconcePtsald eeos Location’ Project No’ ‘Scale: Drawing No’ A
casa— 14/2-10 BANKSIA AVENUE NOOSA HEADS 200604 1:50@A3 A-WD05
Toncepts
Page 7
new extended length floor joists fixed against face of existing joists / refer section also pack last joist to obtain fixing thru to existing door head existing floor joists shown dashed joist trimmer secure new joist to existing hwd pole plate / check all fixings 200x63 LVL bearer face fixed to existing hwd bearer remove existing tiles and floor sheeting and make good all floor joists showing 240X63 LVL deterioration continuous 200x63 E13 LVL beaty face fixed to existing blockwork pillar to engineers detail 240X63 LVL oOo st oF. i=] | 3 chemset pole plate extension Oo to existing blockwork wall . st Oo of. es oy H+ t g provide requisite clearances to suit strip drain and associated offset of stormwater drainage pipework to existing dp below | 100x100 hwd timber post in concrete pad Mi footing to engineers detail | 240x45 E13 H2 floor joists U.N.O. | FLOOR FRAMING PLAN | | ‘A_[1@/09720| ISSUE FOR AUTHORITY APPROVALS GiB UNIT 14 UNIT 13 | | UNIT 15 exist'g roof beyond to remain as is ‘ArcPanel' insulated awning roof as detailed new bi-parting sliding glass door beyond FCL WHL new window painted timber handrail to match existing Overfiow spitters from rendered baseboard balcony floor beyond to match existing FFL WHL exist'g door and it to remain as is exist'g latticed garage door to remain as is FFL new hwd timber post WEST ELEVATION (STREET FRONT) DISTINCTIVE BUILDING DESIGN SERVICES Project: Drawing Title: Drawn: ‘Checked: ‘Commencement Date: Revision No: Tet ovsevit978 mop oa1zaascev PROPOSED ALTERATIONS TO UNIT 14 FOR BRENDAN AND MISHELL FLOOR FRAMING PLAN & ELEVATION eB 6B JULY 2020 EMAIL [email protected] Fone Ta Trango A 200604 1:50@A3 A-WD06 casa— 14/2-10 BANKSIA AVENUE NOOSA HEADS Toncepts