Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

Reference Document - RAL26 0015 - Bushfire Hazard Assessment (As Published) · RAL26/0015

of 44

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                 Bushfire Hazard Assessment & Management Plan v2                                     NCES REF: J001445
                 434 Lake Cooroibah Rd Lake Cooroibah, QLD



                 The following design principles are recommended to be adopted for the development:
                         •    The access handle into the site comprise low threat vegetation conditions for the life
                              of the development.
                         •    A minimum driveway width of 3.5m is provided;
                         •    Driveway clearance of 3.5m wide by 4.8m high is provided for fire truck access.
                         •    Driveway is designed to not exceed 12.5% grade.
                         •    Provision is made for a passing bay every 80m along the length of the driveway to
                              the Lot 7 building site.
                         •    Provision is made for fire trucks to be able to turn around at the Lot 7 building site.
                              Sufficient area should be provided to facilitate a QFES MRV three point turn to safely
                              exit the site in forward gear.
                         •    The driveway is constructed to a standard so that it is accessible in all weather
                              conditions and capable of accommodating a vehicle of 15 tonnes for the trafficable
                              road width as specified in the “Road Planning and Design Manual”.
                         •    Steep slopes affect the free movement of trucks and hinder safe fire fighting . Severe
                              short dips may limit access due to the overhang of the body from the wheels and
                              should be excluded from the road design.
                         •    The access road is to be maintained for the life of development and any fallout debris
                              removed accordingly.
                 The vehicle access design is considered safe and acceptable subject to incorporation of the
                 above recommendations.

                 6.6 Landscaping and Regrowth
                 Existing and future landscaping within the site should avoid increasing the potential for
                 bushfire hazard. Assessment Benchmark 5 of the SPP Bushfire 2019 seeks that the site layout
                 places the landscape and open spaces within the site between premises and adjacent mapped
                 medium, high or very high potential bushfire intensity areas. This landscaping and open space
                 comprises protective landscape treatments that:
                 1. Comprise only low threat vegetation (for example grassland managed in a minimal fuel
                 condition, maintained lawns, golf courses and cultivated gardens); or
                 2. Are designed to ensure a potential available fuel load is maintained at less than 8
                 tonnes/hectare in aggregate and with a fuel structure that remains discontinuous.
                 No landscaping detail has been provided for assessment.
                 Any proposed landscaping in Lot 7 shall adopt the following design criteria:
                     •       The landscaping conditions within the nominated APZs and access handle satisfies
                             Assessment Benchmark 5 of the SPP Bushfire 2019 and the low threat vegetation
                             criteria prescribed in section 2.2.3.2 of AS 3959:2018 or later iterations thereof,
                             including maintaining short, cropped grass cover to approximately <10cm height.
                     •       No mulched garden beds are sited within 2m of buildings.

                 6.7 General Property Maintenance
                 The undertaking of an appropriate level of property maintenance throughout the year, and in
                 particular prior to the fire season, can significantly reduce the severity of fire impact upon a
                 site. Queensland Fire and Emergency Services recommend the following general actions be
                 undertaken to prepare for the fire season:
                 Structure
                     •       Install gutter-guard or similar leaf barriers over gutters.
                     •       Clear leaves, twigs, bark and other debris from the roof and gutters.


Document Set ID:©24816699
                    2026                                                 24
Version: 1, Version Date: 25/05/2026

Used in these records

About this file

File size
7.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Reference Document - RAL26 0015 - Bushfire Hazard Assessment (As Published).pdf · 7.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.