Council archive · source document
07/2104 - Operational Works - Landscaping, Access, Car Parking, Storm Water, Frontage Works, Excavation, Erosion & Sediment [As Published] · 142007.2104
INTEGRATED PLANNING ACT 1997 Integration of land use and public . transport —~ For more information refer to Guide-23, schedule 8A of the IPA, & schedule 2 of the IP Requiation. Unless you answered “none of the above’, the application triggers referral to OT as a concurrence agency. 22. “+ / 4 IDAS Assessment Checklist, Version 20, 2 April 2007 The application involvés: (tick the applicable box’es)— / : (1 ()) a material change of use assessable against the planning scheme for a purpose ~ mentioned in schedule 13C of the IP Regulation and exoeeding the thresholds set by that schedule. ae D (ii) reconfiguring a lot— (1 (a) on tand that is completely or partly within a public transport corridor, and the total number of lots increases; (1b) onland that is completely or partly within a future public transport corridor or an airport's public safety area; . (1 (c). ontand that is within 400m of a public passenger transport facility or a future : public passenger transport facility, and the total site area is 5000m? or greater; (21.2) . for a residential purpose within the 25 ANEF contour for an airport; Le) _ fora residential purpose resulting in 100 or more allotments. _ Dili) operational work assessable against the planning scheme, but not associated with a material change of use mentioned in 0 above or F reconfi iguring a tot mentioned in ( above, on land that— (J (a) _ is completely or partly within a public transport corridor or a future public : transport corridor; (6) _ will result in work that encroaches into an airport's operational airspace. & (v) none of the above. , 6 a Railway safety z and afficie For more information refer to Guide’ 8A of the IPA & schedule 2-of the'IP egulation. Unless you answered “none of the above", the ‘application triggers referral to ar asa concusrence agency. 23. The application involves: (ick the a applicable box/es)— oO (i) a material change of use assessable against the planning scheme for a purpose mentioned in schedule 13D of the iP Regulation and exceeding the thresholds set by that _ Schedule. O (ii) reconfiguring a lot— (a) -on land that is completely or partly within a future public transport corridor, future railway land or a railway tunnel easement; 1 - [1 (>). onland thatis within 400m of a Citytrain passenger railway station or a future . Citytrain passenger railway station, and the total site area is 5000m? or . greater; (©) __ ontand that abuts rail corridor land, commercial corrider land or future railway land, and the total number of lots increases; (1d) oniand that abuts rail corridor land, commercial corridor land or future railway land,and an easement abutting the corridor or future railway land is created; [1 (e) _ on land that is completely or partly within 100m of, and abutting an approach oN to, a railway level crossing, and the total number of lots i increases, (1 (f) for a residential purpose resulting in 100 or more allotments. Oo (iii) operational work assessable against the planning scheme; but nol associated with a : @ material change of use mentione in (i) above or reconfiguring a lot mentioned i in (il) above, involving extracting, excavating or filling greater than 50m3, Gn land that— (1 (a) _ is completely or partly within rail corridor land or commercial corridor land, and the work is not for rail transport infrastructure or other rail infrastructure; (1 (b) _ is completely or partly within future railway land, or a railway tunnel easement; [1 (c) abuts rail corridor tand, commercial corridor land or futurelrailway land, and , -the work is within 25m of the railway boundary. . [X (iv) none of the above. oo . : . Moonie to Brisbane pipeline For more information refer to schedule 2of the 1P Requtation. Unless you answered “none of the above”, the application triggers referral to the holder of pipeline licence No 1 issued under the Petroleum, Act 1923, currently Santos QNT Pty.Ltd, for advice. 24, The application involves the easement for the construction or operation of the Moonie to Brisbane strategic pipeline, and involves: (tick the applicable box/es)— (1 (i) a material change of use assessable against the planning scheme and not associated with reconfiguring a lot, and any structure or work will be located wholly or partly in the easement. ; i ! J (ii) reconfiguring a lot , (ii) operational work assessable against the planning scheme, that is filing, excavation, compaction, drilling, boring or piling not associated with a reconfiguring alot, and the work is located wholly or partly in the easement. 1H (iv) none of the above.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2104 - Operational Works - Landscaping, Access, Car Parking, Storm Water, Frontage Works, Excavation, Erosion & Sediment [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.