Council archive · source document
07/2104 - Operational Works - Landscaping, Access, Car Parking, Storm Water, Frontage Works, Excavation, Erosion & Sediment [As Published] · 142007.2104
INTEGRATED PLANNING ACT 1997 Works in tidal areas, coastal management districts and fish habitat areas \fyou answered YES to Q§, and ticked any boxes in Q6), your application is required tobe assessed against and must comply’ With the Wild - Rivers Code. lfyou answered YES to Q5 and ticked box i) in . Q6, your application is required. to be referred: to | the EPA. -Note: If-specified works are proposed ina local govemment area, it is.preseribed ‘tidal work - the| -Televant local govemment wili be the -asSessment manager with the EPA as.a Coneurrence agency 4f you answered YES to Q5, and ticked box ii)-or -iil} in Q6, your application requires referral to OPIF. : “Ifyou answered'NO to’Q5:and ticked box i} in : Q6, the. application will not be accepted. ifyou answered NO to Q5,ticked. box ii) in.Q6 and the development is necessary to install authorised works or-infrastructure where a development permitis.not tequired, orif.a ‘féquired: permit is held, the.application must be assessed against and must comply with the Wild “Rivers Code. Applications for.purposes other than specified works or as described above will": not be accepted. ° Ifyou answered NO at 6S and ticked box ii) in- Q6, the apptication may be made if the works are ina PA. These applications must be.assessed. . against and must comply with the Wild Rivers. *-Code. The application will not be accepted if the development is proposed to-be located.in a HPA. For more information about specified works refer ‘to Guide 27 Residential, commercial or industrial development ff you answered YES to Q7, your application is not subject to wild river requirements, Provided there are no other aspects of this’ development that require assessment against ‘the relevant witd river declaration or Wild Rivers Code, you do not need to complete the remaining questions in Section 2, Ifyou answered NO to a7 and’ ticked either. box i) or ii) in Q8, the assessing agency is the relevant local government, :The application must _ be assessed against and must comply with the _ Wild Rivers Code. f . f ; . - ' f O . IDAS Assessment Checklist, Version 20, 2 April 2007 5." Is the development for specified works? (see definition in the Wild Rivers Act 2005 and Guide 27- Development in a wild river area) _CINo Clyes 6. The application is for one or more of the following: (1 i) Operational works that is tidal works or works in a coastal management district (ensure you have completed Part M and/or Part P of Form 1}, or O ii) Operational works for the removal, destruction or famage of marine plants (ensure you have completed Part O2 of Form 1); OF O iii) Building or operational works in a fish habitat area (ensure you have completed Part Oe of Form 1). 7. \s the application for residential, commercial or industrial development in a designated urban area? no Clyes 8.. IF NO, does the application for residential; commercial or industrial development involve: oO i) a material change of use made assessable in a local government planning scheme (ensure you have completed Part D of Form 1); or L ii) operational works associated with reconfiguring a lot (ensure you have completed Part F of Form 1). ® Animal husbandry activities Ifyou answered YES to Q$ your application requires assessment against and must comply with the Wild Rivers Code. The assessing agency is NRW. Note: Applications for animat husbandry activities will not be accepted if proposed in a HPA. For more details and a definition of animal husbandry activities see the Wild Rivers Act 20085 and refer to Guide 27. _ '|9. Does the application involve a material change of use for animal husbandry activities (as defined under the Wild Rivers Act 2005) in a PA? O NO O YES (ensure you have completed Part R of Form 1) Agricultural activities Hfyou answered YES to Q10, your application . requires assessment against and must comply with the Wild Rivers Code. The assessing agency is NRW. Note: Applications for agricultural activities will not be accepted if proposed in a HPA. For more details and 2 definition of agricultural activities » see the Wild Rivers Act 2005 and refer to Guide 27. The production of fodder in a PA, and pasture improvement using low impact soil disturbance ~___ techniques is not an agricultural activity as “defined under the Wild Rivers Act 2005: For- more information see Guide 27. 10. Does the application involve agricultural activities (as defined under the Wild Rivers Act 2005) in aPA? — [J No 11. If YES is the application for: [71 i) a material change of use; or oO ii) operational works. [1 YES (ensure you have completed Part Q of Form 4 ) f Page 12 \ »
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2104 - Operational Works - Landscaping, Access, Car Parking, Storm Water, Frontage Works, Excavation, Erosion & Sediment [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.