Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

07/2104 - Operational Works - Landscaping, Access, Car Parking, Storm Water, Frontage Works, Excavation, Erosion & Sediment [As Published] · 142007.2104

of 39

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997

Works in tidal areas, coastal
management districts and fish habitat
areas

\fyou answered YES to Q§, and ticked any

boxes in Q6), your application is required tobe

assessed against and must comply’ With the Wild
- Rivers Code.

lfyou answered YES to Q5 and ticked box i) in
. Q6, your application is required. to be referred: to |
the EPA.

-Note: If-specified works are proposed ina local
govemment area, it is.preseribed ‘tidal work - the|

-Televant local govemment wili be the
-asSessment manager with the EPA as.a
Coneurrence agency
4f you answered YES to Q5, and ticked box ii)-or
-iil} in Q6, your application requires referral to
OPIF. :

“Ifyou answered'NO to’Q5:and ticked box i} in

: Q6, the. application will not be accepted.
ifyou answered NO to Q5,ticked. box ii) in.Q6
and the development is necessary to install
authorised works or-infrastructure where a
development permitis.not tequired, orif.a
‘féquired: permit is held, the.application must be
assessed against and must comply with the Wild

“Rivers Code. Applications for.purposes other
than specified works or as described above will":
not be accepted. °

Ifyou answered NO at 6S and ticked box ii) in-
Q6, the apptication may be made if the works are
ina PA. These applications must be.assessed. .
against and must comply with the Wild Rivers.
*-Code. The application will not be accepted if the

development is proposed to-be located.in a HPA.

For more information about specified works refer
‘to Guide 27

Residential, commercial or industrial
development

ff you answered YES to Q7, your application is
not subject to wild river requirements, Provided
there are no other aspects of this’ development
that require assessment against ‘the relevant witd
river declaration or Wild Rivers Code, you do not
need to complete the remaining questions in
Section 2,

Ifyou answered NO to a7 and’ ticked either. box
i) or ii) in Q8, the assessing agency is the
relevant local government, :The application must
_ be assessed against and must comply with the

_ Wild Rivers Code.

f .
f ; . - '
f O . IDAS Assessment Checklist, Version 20, 2 April 2007

5." Is the development for specified works? (see definition in the Wild Rivers Act 2005 and Guide 27-
Development in a wild river area)

_CINo Clyes

6. The application is for one or more of the following:

(1 i) Operational works that is tidal works or works in a coastal management district (ensure you
have completed Part M and/or Part P of Form 1}, or

O ii) Operational works for the removal, destruction or famage of marine plants (ensure you have
completed Part O2 of Form 1); OF

O iii) Building or operational works in a fish habitat area (ensure you have completed Part Oe of Form 1).

7. \s the application for residential, commercial or industrial development in a designated urban

area?
no Clyes

8.. IF NO, does the application for residential; commercial or industrial development involve:

oO i) a material change of use made assessable in a local government planning scheme
(ensure you have completed Part D of Form 1); or

L ii) operational works associated with reconfiguring a lot (ensure you have completed Part F

of Form 1).
®

 

Animal husbandry activities

Ifyou answered YES to Q$ your application
requires assessment against and must comply
with the Wild Rivers Code.

The assessing agency is NRW.

Note: Applications for animat husbandry
activities will not be accepted if proposed in a
HPA. For more details and a definition of animal
husbandry activities see the Wild Rivers Act
20085 and refer to Guide 27. _

'|9. Does the application involve a material change of use for animal husbandry activities (as defined

under the Wild Rivers Act 2005) in a PA?
O NO O YES (ensure you have completed Part R of Form 1)

 

Agricultural activities

Hfyou answered YES to Q10, your application .
requires assessment against and must comply
with the Wild Rivers Code.
The assessing agency is NRW.
Note: Applications for agricultural activities will
not be accepted if proposed in a HPA. For more
details and 2 definition of agricultural activities »
see the Wild Rivers Act 2005 and refer to Guide
27.
The production of fodder in a PA, and pasture
improvement using low impact soil disturbance
~___ techniques is not an agricultural activity as
“defined under the Wild Rivers Act 2005: For-
more information see Guide 27.

 

10. Does the application involve agricultural activities (as defined under the Wild Rivers Act 2005) in
aPA? —

[J No

11. If YES is the application for:
[71 i) a material change of use; or
oO ii) operational works.

[1 YES (ensure you have completed Part Q of Form 4 )

 

 

f

Page 12

\ »

 

Used in these records

About this file

File size
3.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2104 - Operational Works - Landscaping, Access, Car Parking, Storm Water, Frontage Works, Excavation, Erosion & Sediment [As Published].pdf · 3.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.