Skip to the record
Every meeting, every word.

Council archive · source document

07/2104 - Operational Works - Landscaping, Access, Car Parking, Storm Water, Frontage Works, Excavation, Erosion & Sediment [As Published] · 142007.2104

of 39

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997

 

5 '

"xs Assessment Checklist, Version 20, 2 Apri 2007.

 

 

 

 

 

 

 

 

   

 

  
  

 

designated rainwater tankarea

For more: information go to schedule 2 table 1 of the
(Pp Reaulalion and the QOC par 25°"
Assesseient period 15 days, No response is 2

jeemed refusal.
te

 

.| Whether paiticular buildings may be | 16. An “application to use an existing building that is not class 1, 2, 3 or 4 for residential purposes may tigger a
occupied for residential purposes referral to the local government as the concurrence agency.
For more information go to schedule 2 table 4 of the
{P Reguiation.
Assessment period 5 days. No response is a
deemed refusal. . . .
‘Design and siting 117. An application may trigger referral to the local government as the concurrence agency if the building work
‘For-mote information go lo schedule 2 tale ofthe does not comply with the performance criteria of parts 11 and 12 of the Queensland Development Code,
P Regulation. 18. An application may trigger referral to the local government as the concurrence agency if the building work
“Assessnient period 5 days. No responsé isa does not comply with the qualitative statement for building clearance and site cover.
‘deemed refusal. 19. An application may trigger referral to the local government as the concurrence agency if the building work
7 does not comply with the qualitative statement for performance criteria 4, 5, 7, 8 or 9 of the Queensland
: : Development Code, part 11 or 12.
Fire safety in particular budget + | 20. An application may trigger referral to the locat government as the concurrence agency to determine the
om building will comply with the fire safety standard under the Building Act 1975 when the building work has
For mor ‘information go to schedule 2tabte 1 ofthe | been completed.
IP Regulation. 1
‘Assessment period 45 days. NO response isa.
- | deemed refusal.
‘Higher risk-personal appearance 21. An application may trigger referral to the local government as the concurrence agency to determine if the
‘services ~ 8 | building work
“For hore informalion’go to schedule 2 table 1 of the * — complies with the performance criteria of the Queensland Development cade part 15; and
‘IP Regulation and the QOC part 15. « the Work does not comply with an acceptable solution stated in the part.
‘Assessment period” 15 days. No} fesponse isa.
‘deemed fefusal). * | . @
Building work for residential: service | 22. An application for building work for premises in which residential care service under the Residential
For inore information go'to schedule:2 table 1°of the "Services (Accreditation) Act 2002, section 4, is conducted, or is proposed to be conducted, will trigger
JP Regulation and the QDC part 20. referral to the local government as the concurrence agency.
Assessment period 15 days, No response is a .
deemed refusal. sd
Building work for removal or f 23, An application for the removal and/or Tebalging at another site ofa building or other structure;will trigger
rebuilding : j referral to the local government as the concurrence agency.
For more informatign.go to schedule 2 table? of the ‘ : . we .
IP Requlalion, a i : 4
Assessment per 5 days. No response isa _
_ [deemed retusa” | “
he Building y ork for rainwater tank in 24. An application may trigger referral to the local government as the concurrence agency to determine if the

_ © Under the Building Regulation 2006, a rainwater tank is proposed to be installed as part of relevant

building work or structure complies with the relevant performance crileria if -

building work, in a designated rainwater tank area; and
e Under the Queensland Development Code, part 25; the rainwater tank does not indlude an acceptable
solution for a relevant performance criteria. Soa

 

 

 

 

rm

4

t
k

fame

Used in these records

About this file

File size
3.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2104 - Operational Works - Landscaping, Access, Car Parking, Storm Water, Frontage Works, Excavation, Erosion & Sediment [As Published].pdf · 3.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.